Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Recommended Posts

Looking for good contractors? Click here for your request
Hahaha..... izzt..... mine 160

U started reno yet? mine should be next week

started on 23 mar, supposed to finish by 18 April.

so far only painting (2 coats), ceiling works, kitchen & washing machine base, hacking..

carpentry installation was planned today, but... sigh....

now got delay handover already.. i think got 5 days no works..

now nly hope carpentry doesnt screw up.

i stopped workers from installing glass panel today cos i wasnt told it was 2 pcs instead of 1 whole pc. abt 1.2 x2.5. in the end, the workers only done 1 pc and took backed the other 2. was abit mad cos aircon already fly me airplane in the morning...

today when i visited my other blk neighbour, saw lynn there overseeing the workers .. not long after, shawn was there to moniter my neighbour's neighbour unit. (side by side Ideal hse projects)

Edited by pete
 

Share this post


Link to post
Share on other sites
started on 23 mar, supposed to finish by 18 April.

so far only painting (2 coats), ceiling works, kitchen & washing machine base, hacking..

carpentry installation was planned today, but... sigh....

now got delay handover already.. i think got 5 days no works..

now nly hope carpentry doesnt screw up.

i stopped workers from installing glass panel today cos i wasnt told it was 2 pcs instead of 1 whole pc. abt 1.2 x2.5. in the end, the workers only done 1 pc and took backed the other 2. was abit mad cos aircon already fly me airplane in the morning...

today when i visited my other blk neighbour, saw lynn there overseeing the workers .. not long after, shawn was there to moniter my neighbour's neighbour unit. (side by side Ideal hse projects)

Cheer up bro ..... look on the brighter side ......

Lynn was saying to bring me view their capentry work in Punggol on Sat ..... wonder could it be your unit? Cos she mentioned Thurs & Fri will install and Sat i can take a look ......

Let's see on Sat if i'm visiting your unit ........

 

Share this post


Link to post
Share on other sites
Lynn was saying to bring me view their capentry work in Punggol on Sat .....

Hi mitlancer, can update us on the carpentry? I didn't get to view their carpentry b4 start work, only tiling. Cos Lynn say designs may not be what we like, but I thought main purpose is to see workmanship... :unsure: If design same then we're living in cookie cutter Ideal Hse design flats already...

 

Share this post


Link to post
Share on other sites
Hi pbtgal...... mine is a "white flat" means not internal walls from HDB. Layout configuration is to individual's liking. Hence, i m retaining the layout from the previous owner i quite fond of......

Hi Mitlancer

ya, i saw it in newspaper, no internal walls and upto owners to decide where the living, bedrooms are etc. Interesting. When are u starting your reno?

 

Share this post


Link to post
Share on other sites
Hi mitlancer, can update us on the carpentry? I didn't get to view their carpentry b4 start work, only tiling. Cos Lynn say designs may not be what we like, but I thought main purpose is to see workmanship... :unsure: If design same then we're living in cookie cutter Ideal Hse design flats already...

Hi Tsubame, okie , will update u after we view tmr..... u can ask Lynn to arrange a viewing for you as well cos she got a few project runnign on.....good to see n feel it yourself ......

 

Share this post


Link to post
Share on other sites
Hi Mitlancer

ya, i saw it in newspaper, no internal walls and upto owners to decide where the living, bedrooms are etc. Interesting. When are u starting your reno?

Hi Pbtgal,

There are only 24 units in Sin ........ actually there is not much variation for the layout cos the 2 bathrooms are fixed and for sure u will wnt to have a attach bathroom for your MBR..... In the end its quite like the standard layout except u can hv yr MBR bigger .....

 

Share this post


Link to post
Share on other sites
Cheer up bro ..... look on the brighter side ......

Lynn was saying to bring me view their capentry work in Punggol on Sat ..... wonder could it be your unit? Cos she mentioned Thurs & Fri will install and Sat i can take a look ......

Let's see on Sat if i'm visiting your unit ........

not mine, its my neighbour's at 303C. mine got delay already. i can pop by if my neighbour is at home. :)

Edited by pete
 

Share this post


Link to post
Share on other sites
Hi mitlancer, can update us on the carpentry? I didn't get to view their carpentry b4 start work, only tiling. Cos Lynn say designs may not be what we like, but I thought main purpose is to see workmanship...

Hi Tsubame,

Seen their capentry work at Punggol today..... i must agree that the details of the materials & workmanship r reasonably good and the hinges of the doors are those with soft closer......

Hopefully their works will be consistent for our homes ....... Perhaps we can keep each others posted ......

 

Share this post


Link to post
Share on other sites
Hi Tsubame,

Seen their capentry work at Punggol today..... i must agree that the details of the materials & workmanship r reasonably good and the hinges of the doors are those with soft closer......

Hopefully their works will be consistent for our homes ....... Perhaps we can keep each others posted ......

303C? i went also abt 2pm to see see also.

 

Share this post


Link to post
Share on other sites

mitlancer71, thanks for the update. Good to know their carpentry works ok. Progress on my reno will be in my t-blog. Nothing much this mth except tiling. Carpentry works will start next mth.

 

Share this post


Link to post
Share on other sites

got a suprised today 1030am, opened door and heard sound of water running in mbr toilet. The water lever was lifted up, shower head exposed rubber spilted and gash of water slashing out, created a water fountain against the shower screen. whole toliet was wet including areas outside toilet.

We knew tat the worker was the last person who left cos we left at 550pm the previous day. cant believed tat water was running for more than 12 hours... :bangwall:

PICT0508-1.jpg

1st reaction, dump bag, keys n measuring tape into common toilet floor.. if i go inside, i be wet, cant do anything but to turn off the main switch outside main door. lucky i got the key with me, if not cant turn it off.

Johnny acknowledge tat the parquet were affected n will monitor n change it if necessary.

 

Share this post


Link to post
Share on other sites

Hi Pete

oh gosh! cant believe my eyes too!

Luckily your id acknowledge the mistakes done by the worker.

 

Share this post


Link to post
Share on other sites

now got a couple of opinions:

1) Change the parquet -> Likely to delay your renovation and create a bigger mess...

2) Dry up and restore the parquet by getting drying specialist (such as Munters) to remove the excessive moisture with machines, sand and re-varnish -> Reduce delay to renovation

3) Report to AIG (Under HDB Fire insurance) since parquet and door provided by HDB and seek their advice (can get contact of drying specialist from them)

4) Discuss with your ID who to foot the bill.

If want to restore and save the parquet, must react first, but now is monitor first.

dunno how much water they've absorbed already

I dun know wat johnny will use at the moment.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×