yoyohome 0 Report post Posted January 4, 2008 hi candy,I'm leaving the round corner empty first, maybe put a reclining chair there...looking forward to more pics of ur unit. i went for a small washer, 40cm wide but 5kg load onlycan't stack coz of the gas heater !! !!so when your reno starting?pix pix my reno will start next week. still waiting for hdb to fix some defects... Share this post Link to post Share on other sites
candyprincess 0 Report post Posted January 4, 2008 hello ive uploaded pics of my unit le.. check out my thread.. !! Share this post Link to post Share on other sites
simpleguy80 0 Report post Posted January 4, 2008 hi candy,I'm leaving the round corner empty first, maybe put a reclining chair there...looking forward to more pics of ur unit. !! my reno will start next week. still waiting for hdb to fix some defects... So u engaging ID or renovators? I also awaiting HDB to fix defects. Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 5, 2008 So u engaging ID or renovators? I also awaiting HDB to fix defects.ID nearby my current plc. they r going to lock my gate this weekend and start uploading sand, cement, etc next week. Share this post Link to post Share on other sites
softballer 0 Report post Posted January 6, 2008 ID nearby my current plc. they r going to lock my gate this weekend and start uploading sand, cement, etc next week.welcome to the neighbourhood.. where is your place.. perhaps can drop by to visit.. For SB-er EA, the biggest prob is the curve MBR, u can either do a platform, a curved makeup table or place something 'hopefully useful there'. I should be putting a chair there like wat you are doing.. That corner is quite wasted.. Who is ur ID and how much is ur damage??I'm signing my lease today!.. but may not be starting my reno so soon.. Do I have to pay the conservancy fees (CF) once I get my lease signed or when I get my keys..?? Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 7, 2008 (edited) welcome to the neighbourhood.. where is your place.. perhaps can drop by to visit.. For SB-er EA, the biggest prob is the curve MBR, u can either do a platform, a curved makeup table or place something 'hopefully useful there'. I should be putting a chair there like wat you are doing.. That corner is quite wasted.. Who is ur ID and how much is ur damage??I'm signing my lease today!.. but may not be starting my reno so soon.. Do I have to pay the conservancy fees (CF) once I get my lease signed or when I get my keys..??ha! our units r very nearby. my plc is at the same blk as yours. my ID is ARANUS, total contract costs ard 24k - kitchen, wardrobe, hacking, false ceiling/LBox, low cabinet, window/balcony grille, etc... no feature wall, thus interested in candyprincess's painted tv wall, keke...yep, u will start to pay CF $70+/mth, actually need to pay 3 mths upfront CF upon sign the agreement at hdb.after collect the keys, remember to check everything in ur unit - tiles, toilet bowls, basin, vanity top, doors, windows, electrical points, blah blah, and report defects to hdb branch. Edited January 7, 2008 by yoyohome Share this post Link to post Share on other sites
softballer 0 Report post Posted January 7, 2008 ha! our units r very nearby. my plc is at the same blk as yours. my ID is ARANUS, total contract costs ard 24k - kitchen, wardrobe, hacking, false ceiling/LBox, low cabinet, window/balcony grille, etc... no feature wall, thus interested in candyprincess's painted tv wall, keke...yep, u will start to pay CF $70+/mth, actually need to pay 3 mths upfront CF upon sign the agreement at hdb.after collect the keys, remember to check everything in ur unit - tiles, toilet bowls, basin, vanity top, doors, windows, electrical points, blah blah, and report defects to hdb branch.imagine paying 77 per mth.. dunno wat they use the money for.. bigger the house bigger ur payment.. urghh...got nice pic of ur place.. or blog? can let us drool over your beautiful home. Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 7, 2008 (edited) imagine paying 77 per mth.. dunno wat they use the money for.. bigger the house bigger ur payment.. urghh...got nice pic of ur place.. or blog? can let us drool over your beautiful home.ID just loading cement, sand only. still in original condition.will upload more pics as the reno going on. u collected ur keys? 30 keys, quite a big bunch. Edited January 7, 2008 by yoyohome Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 8, 2008 some pics of perspective drawing... low cabinet at foyer:kitchen cabinet (thinking of using darker red instead of such a bright one, comments welcome...)kitchen sink:master bdrm:walk-in wardrobe:all comments are welcome! Share this post Link to post Share on other sites
ahberden 0 Report post Posted January 8, 2008 Use bright red! Your kitchen looks very nice! I also used bright red glass for the backing of my kitchen cabinet... overall white cabinets with a few black glass doors.Which ID did you engage?? Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 8, 2008 Use bright red! Your kitchen looks very nice! I also used bright red glass for the backing of my kitchen cabinet... overall white cabinets with a few black glass doors.Which ID did you engage??hi ahberden,thx for the comment. ur reno seems 95% done as carpentry already installed, any pic of ur new plc?my ID is Candy from ARANUS. Share this post Link to post Share on other sites
ahberden 0 Report post Posted January 8, 2008 hi ahberden,thx for the comment. ur reno seems 95% done as carpentry already installed, any pic of ur new plc?my ID is Candy from ARANUS.yeah... my reno is also complete...Bulk of my furniture will be arriving coming thursday...Only left grinding parquet (Today), cleaning up (Tmr) and the other touching up activities.Hopefully all goes well for today and tmr...Have alots of pictures...just that im kinda of lazy to put it up as we have been really busy... hehe... Share this post Link to post Share on other sites
simpleguy80 0 Report post Posted January 8, 2008 yeah... my reno is also complete...Bulk of my furniture will be arriving coming thursday...Only left grinding parquet (Today), cleaning up (Tmr) and the other touching up activities.Hopefully all goes well for today and tmr...Have alots of pictures...just that im kinda of lazy to put it up as we have been really busy... hehe...Ya i also like bright red cabinets. At least it look brighter. Anyway my tile is pink colour so is better to match with red cabinets. Is it a good choice? Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 8, 2008 Ya i also like bright red cabinets. At least it look brighter. Anyway my tile is pink colour so is better to match with red cabinets. Is it a good choice?i think ur pink floor matches red cabinet better than my creamy floor does. Share this post Link to post Share on other sites
yoyohome 0 Report post Posted January 10, 2008 (edited) design update of kitchen cabinet:reno update:cabinet base, fridge base, washer base, kerbs in both bathrms done. went to take a look, tiling workmanship quite good. plumbing, wall hacking, and electric wiring today... hope everything goes smoothly. Edited January 10, 2008 by yoyohome Share this post Link to post Share on other sites