elaine1205 0 Report post Posted December 20, 2007 (edited) its been quite a waiting process from day 1 when we select the flats till we collect the keys on 19th Nov 07..finally, a month later, we are going to start the renovation now!after much sourcing around for contractors, we engage Impress 21 as our renovation contractor. we need the flat by end of Feb 08 for our wedding in March, so we are crossing finger that the work will commence smoothly as possible!WORK SCHEDULE1-Start Work - 10th December 07 (Completed)2-Tiles ,sand and other materials - arrived on 18th December 07 (Completed)3-2nd discussion - 19th dec, to discuss the elec and lighting point, discuss on the fridge/machine base, type of cooker hoob, layout of tiles..we are to decide the type of laminating, paint colors etc by 3rd discussion. (Completed)4-Tiling - start work on 21st December . (Completed on 29 Dec 07)5-Airconditioning 1st installation- trunking on 24 Dec 07. (Completed)6-3rd discussion on carpentry works - Completed7-Citygas installation with Rinnai Heater- 29 Dec 07 (Completed)8-Painting-Starting on 31 dec 079-Carpentry starting on 31 dec 07-target 3 to 4 weeks .(jan 08)10-Lightings-installation on 5 jan 08 Edited December 30, 2007 by elaine1205 Share this post Link to post Share on other sites
elaine1205 0 Report post Posted December 20, 2007 Visit on 19th December 07[/b]Living RoomDoor EntranceLighting Pointlighting control switchVisit to house on 19th December 07 (Contd)close up on floor tiles (living/dining/foyer)Close up on floor tile (bedroom)MasterbedroomKitchen Share this post Link to post Share on other sites
applefreak 1 Report post Posted December 20, 2007 welcome to renotalk Share this post Link to post Share on other sites
h4happy 1 Report post Posted December 20, 2007 2nd to spam here!Welcome ELAINE!Really nice to your on going renovation.Good luck!! Share this post Link to post Share on other sites
Zlia 0 Report post Posted December 20, 2007 3rd to spam! Hoping I can confirm a ID and start reno soon also. Share this post Link to post Share on other sites
elaine1205 0 Report post Posted December 20, 2007 (edited) 20-12-2007Did alot of damage at courts tampines today.Bought a new tv, fridge and Washing machine. The TV we bought is a promotional set (only 10 sets) . We think is a bargain therefore bought it, Samsung LA40M81BX..heehee.However no free gifts attached due to too cheap as per the salesman.http://www.samsung.com/sg/consumer/detail/...&fullspec=FThe Washing machine is Tecno TWA 880s. Hmm..seems a reasonable deal which includes a $70 ntuc courts voucher + a 30L Electric oven..This model is make in Korea. We heard is a pretty good power saving washer .Quite quiet too for a Auto washerhttp://www.tecnogas.com.sg/product_details...6-60A58D65C5C0}As for the Fridge, We decided to choose Fisher and Payel as this is quite a established brand in fridge industry. It flexibility in changing the position of tempered glass shelves makes us decided this is the one that we need. However as according to the salesman, there could be a change of production plant. Usually,they are manufactured in New Zealand but the salesman is saying that they are moving to Thailand due to cheap labour cost. Hope our fridge is a Kiwis. hahahttp://www.fisherpaykel.com.sg/refrigerati...435698E99817C20 Edited December 31, 2007 by elaine1205 Share this post Link to post Share on other sites
Simpleboi 0 Report post Posted December 20, 2007 Hi Elaine!!Spamming here too..and congrats congrats hehe Hope the whole reno process goes smoothly for u and will be ready by ur expected date Share this post Link to post Share on other sites
nemofc 0 Report post Posted December 20, 2007 SPAM here!!Congrats! Share this post Link to post Share on other sites
Yang Guo 7 Report post Posted December 20, 2007 good to see another blog coming up lalala Share this post Link to post Share on other sites
jasch 0 Report post Posted December 20, 2007 Visit on 19th December 07[/b]close up on floor tiles (living/dining/foyer)Close up on floor tile (bedroom)MasterbedroomCool another neighbour starting reno!! good luck for your reno ya!! Btw we sld be using the same tiles for all our bedroom as urs leh!! Share this post Link to post Share on other sites
elaine1205 0 Report post Posted December 20, 2007 (edited) del Edited December 20, 2007 by elaine1205 Share this post Link to post Share on other sites
h4happy 1 Report post Posted December 20, 2007 One thing I find is that is it different tiles using different boxes?What are you going to do for your door enterance? Use a special tiles for it? Share this post Link to post Share on other sites
elaine1205 0 Report post Posted December 20, 2007 Thanks alot ,Dear neighbours..Welcome any comments or talks here.Good luck in all your planning and renovation works. Well, my skirting for the living room is also using the brown parquet type laminates homo.Hope the contrast is good . My living room tiles is abit pinkish.I guess the pic is not clear enough . Will be posting more along the way. My tilers told me that by next fri,they are able to complete the tiles.We do not know they are working today .When we reached our unit, we were shocked to see our door open. After opening the doors, saw my tilers at full force working. we were very surprised as they are supposed to start tomolo. Will be buying hao liao for them next time when we visit them as a form of reward for their commitment..heehee.My air con guys are coming in on 24/12 to do trunking works. Well,quite a Bz week ahead .Hopefully all turns out good. Share this post Link to post Share on other sites
h4happy 1 Report post Posted December 20, 2007 Wow, that is really fast for your renovation.It seem like yesterday you told us going to renovate...how time flies!Thanks alot ,Dear neighbours..Welcome any comments or talks here.Good luck in all your planning and renovation works. Well, my skirting for the living room is also using the brown parquet type laminates homo.Hope the contrast is good . My living room tiles is abit pinkish.I guess the pic is not clear enough . Will be posting more along the way. My tilers told me that by next fri,they are able to complete the tiles.We do not know they are working today .When we reached our unit, we were shocked to see our door open. After opening the doors, saw my tilers at full force working. we were very surprised as they are supposed to start tomolo. Will be buying hao liao for them next time when we visit them as a form of reward for their commitment..heehee.My air con guys are coming in on 24/12 to do trunking works. Well,quite a Bz week ahead .Hopefully all turns out good. Share this post Link to post Share on other sites
elaine1205 0 Report post Posted December 20, 2007 One thing I find is that is it different tiles using different boxes?What are you going to do for your door enterance? Use a special tiles for it?Well, there will be no special tiles for the entrance as we felt that the foyer is too small .If we purposely create a special tiles for it, it will makes the house looks more smaller .We guess we prefer a uniformity tiles color.As for the skirting, we will be using our bedroom tiles for the whole house. Share this post Link to post Share on other sites