gingerbelle 0 Report post Posted December 18, 2007 how long does it take for toilet to be ready for usage after contractor overlay tiles & do shower kerb? cos im onli doing my 2 toilets. Share this post Link to post Share on other sites
joe_ling 0 Report post Posted January 9, 2008 (edited) Miss Gingerbelle,Upon overlay of floor tiles & waterproofing being done. There is no need to remove any toilet bowls & you can used the bathrooms after 24hrs. Edited January 9, 2008 by joe_ling Share this post Link to post Share on other sites