prelude4

Advice On Quotation And Progress Payment

Recommended Posts

Hi all, i received the quotation and the schedule for progress payment from this ID.

as im only relying on the ID for carpentry work and no hacking or watsoever.

i'm abit unsure about the schedule of payment as it shows that even before they start any work,

i've already got to pay them 90% of the whole cost!?

------------------------------------------------------------------------------------------------------

1 WALL

A To supply and lay decorative wall paper at 1 wall :- Lump sum $780.00

Master Bedroom

2 CEILING

A To supply and install false ceiling :- Lump sum $1,180.00

Living / Dining

3 ELECTRICAL

A To supply electrician to supply and install the followings:- Estimated

1) Lighting / Switch point - new 15 $40.00 $600.00

2) Install Light Fixture 23 $10.00 $230.00

3) Hacking and make good wall Lump sum Verify on site

4 CARPENTRY

A LIVING

a Design and install TV console w/ LCD console in laminate 8 ft $1,920.00

finish

B DINING

a Design and install Wall feature with laminate , stainless steel , 12 ft $3,480.00

part wall paper and mirror

C FAMILY AREA

a Desing and install Bar counter top in semi round c/w/ acrylic 10 ft $2,600.00

finish

b To supply and install Semi-round solid surface 10 ft LS-$800.00 Optional

DESCRIPTION QTY AMOUNT

c Design and install Wine display cabinet in laminate finish 7 ft $1,610.00

D BEDROOM 2

a Design and install Study table in laminate finish 6 ft $720.00

E MASTER BEDROOM

a Design and install Full-height wardrobe to match developer 3 ft $600.00

colour

b Design and install Study table in laminate finish 10 ft $1,200.00

c Design and install Bed side table in laminate finish Est - 2 ft $280.00

5 MISCELLANEOUS

A General cleaning for whole house Lump sum $150.00

B To supply and lay corrugated paper for the whole house Lump sum $200.00

C Deposit to management Lump sum By owner

Grand total $15,550

------------------------------------------------------------------------------------------------

Term of Payment:-

10% upon confirmation

40% upon delivery of material

40% upon progress payment ( Completion of wet works / Upon arrival of Carpentry )

10% upon practical completion

 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
You can always negotiate. But it seems your ID doing more than carpentry.

yah hor..keke..paiseh.. but the key point is im paying up to 90% b4 they actually start work.

anyone got some ideas or experience how shld the payment schedule be like for it to be reasonable?

im not sure how much is reasonable for them to cover starting costs..

 

Share this post


Link to post
Share on other sites

not worth it... paying 90% then they start work.

if hippcups happen? they will bo chap de... since u had pay 90% which is far enough to cover there pricing already.

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×