Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
piggiedearz

Jurong West St 64 Residents - (july 07 Ballot)

Recommended Posts

Hi junxian,

so you going to hack your mbr walls? from your 3D drawing, i thought they are building a fake wall beside the bomb shelter... so you do not intend to change the floor tiles and toilet wall tiles? does the price include curtains and aircon?

 

Share this post


Link to post
Share on other sites

Join 46,923 satisfied homeowners who used renotalk quotation service to find interior designers. Get an estimated quotation
Hi junxian,

so you going to hack your mbr walls? from your 3D drawing, i thought they are building a fake wall beside the bomb shelter... so you do not intend to change the floor tiles and toilet wall tiles? does the price include curtains and aircon?

yup. hacking the MBR wall to make space for WIW. floor tiles wise.. will re-lay parquet at the WIW area. Toilets .. due to budget constraint and also cant hack/can only overlay ... so never do anything. :sport-smiley-018:

Nope doesn't include curtain / air-con :no:

 

Share this post


Link to post
Share on other sites
yup. hacking the MBR wall to make space for WIW. floor tiles wise.. will re-lay parquet at the WIW area. Toilets .. due to budget constraint and also cant hack/can only overlay ... so never do anything. :sport-smiley-018:

Nope doesn't include curtain / air-con :no:

oic... thanks for your reply... so do you intend to take any bank loan? was wondering which bank offers the least interest...

 

Share this post


Link to post
Share on other sites
oic... thanks for your reply... so do you intend to take any bank loan? was wondering which bank offers the least interest...

Hey, I go for Hitachi Credit, they should have the lowest interest rates and the procedure is quite straight forward, no hassle. I just go there once and signed the agreement, the whole procedure take less than 15 minutes.

When ur house reno complete almost 80-90%, just call them down to investigate the reno status, they will only release the money to contractor when we are satisfied with the renovation, otherwise they won't release the money.

 

Share this post


Link to post
Share on other sites
oic... thanks for your reply... so do you intend to take any bank loan? was wondering which bank offers the least interest...

hi. ya taking bank loan.. as me and wtb kind of just started working not long. 8|

Hey, I go for Hitachi Credit, they should have the lowest interest rates and the procedure is quite straight forward, no hassle. I just go there once and signed the agreement, the whole procedure take less than 15 minutes.

When ur house reno complete almost 80-90%, just call them down to investigate the reno status, they will only release the money to contractor when we are satisfied with the renovation, otherwise they won't release the money.

For fixed rate, hitachi is one of the best, for me.. should be RHB monthly reducing basis.

actually don't look at the interest... just look at how much u paying per month / or the total !

 

Share this post


Link to post
Share on other sites

hi all,

just collected my keys...

675A : samluvbliss, toothytooth, apprye

675B : Spotkev, Alexter, greenskyiv, frances02

676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt, thomnjan

676B : crazygirl48, roseberry, shutiao06, popeye gal, ed12, helenteepl, Gemini06, stay

677A : cyanide, bpheng, vin13

677B : shootmie, piggiedearz

677C : inuya5ha, junxian, norah, baby_ayumi

678A : teodami, Commando, bubbletan, jogal, baby_whyme, jjcian

678B : rav3n, GraCieGaL

678C : missyling, adathong, reds79, rafflesjay, payretep

678D : dar80, NiVleK, Flare, JLEO207

wondering if anyone has the same prob with me with regards to the MBR...like not enough space to put wardrobe leh...some of the IDs i spoke to proposed hacking one wall so that the location of the MBR door can be changed...

 

Share this post


Link to post
Share on other sites
hi all,

just collected my keys...

675A : samluvbliss, toothytooth, apprye

675B : Spotkev, Alexter, greenskyiv, frances02

676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt, thomnjan

676B : crazygirl48, roseberry, shutiao06, popeye gal, ed12, helenteepl, Gemini06, stay

677A : cyanide, bpheng, vin13

677B : shootmie, piggiedearz

677C : inuya5ha, junxian, norah, baby_ayumi

678A : teodami, Commando, bubbletan, jogal, baby_whyme, jjcian

678B : rav3n, GraCieGaL

678C : missyling, adathong, reds79, rafflesjay, payretep

678D : dar80, NiVleK, Flare, JLEO207

wondering if anyone has the same prob with me with regards to the MBR...like not enough space to put wardrobe leh...some of the IDs i spoke to proposed hacking one wall so that the location of the MBR door can be changed...

Hi , Welcome ! :yamseng:

Is yours corner or corridor unit ? I supposed its corner since corridor unit actually a few ft place for a BIW ?

enjoy your reno process !

 

Share this post


Link to post
Share on other sites
What? No free parking on Sunday? Then who dare/want to visit me during weekends especially on Sunday?

****!

ok i heard from 1st Oct, Sunday will be free parking here.

hehehe... just to check will the season parking be cheaper?

i think the town council are looking at erecting the entrance sign very soon too.

 

Share this post


Link to post
Share on other sites
ok i heard from 1st Oct, Sunday will be free parking here.

hehehe... just to check will the season parking be cheaper?

i think the town council are looking at erecting the entrance sign very soon too.

why are they erecting?

 

Share this post


Link to post
Share on other sites

Oh great to have free parking on sunday. Felt uneasy that it wasn't!

Because most visitors will miss the very obscure entrance to our estate right after turning from the slip road.

 

Share this post


Link to post
Share on other sites

I am happy that they finally opened the divider for the exit BUT, anyone having difficulty using that for turning right? Especially during peak hours. At times, I can wait up to 10 mins because there is no yellow box!!

 

Share this post


Link to post
Share on other sites
I am happy that they finally opened the divider for the exit BUT, anyone having difficulty using that for turning right? Especially during peak hours. At times, I can wait up to 10 mins because there is no yellow box!!

ha ha.now then u realised. Rumi has sent out the feedback email to the one incharge on 5 aug. (cos i asked for help too.. )

 

Share this post


Link to post
Share on other sites
ha ha.now then u realised. Rumi has sent out the feedback email to the one incharge on 5 aug. (cos i asked for help too.. )

I realised it long ago. But, no time to post or reply to so many PMs.

And, it is really getting on my nerves.

 

Share this post


Link to post
Share on other sites

why not just turn left and then u-turn for now. haha. i know it defeats the purpose of that opening. But dunno when they going to paint the yellow box.. maybe we help them paint faster.haha

Anyway i know someone posted this before. after showering at the destinated shower area the water somehow streams into the supposedly dry toilet area.. Is that a defect? If it is , did hdb contractor manage to resolve for u all? If hdb contractor tell u that is like that one, what did you all do to resolve this?

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  


×