nemofc 0 Report post Posted March 10, 2008 Ok maybe I try to search for the cd...you notice that the main door is different from the present one. And the kitchen is squarish instead of our present long type.As we are on the enbloc, this is the very first floor plan release to us. orhhh i see... so you like which floor plan? current / previous? Share this post Link to post Share on other sites
jazznpop 0 Report post Posted March 10, 2008 wow previous floor plan is for 5 rm?So many corners. Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 10, 2008 Hi NEM & JAZZThis is a 4 room unit.Actually I prefer the 1st one as the kitchen is big and living room also big. But in the end, they change it.HAPPY Share this post Link to post Share on other sites
jazznpop 0 Report post Posted March 11, 2008 ic icBut if its tis design i may not wan. heehee The shape **** room n dinning room abit odd. Unless they draw it a full rectangle then its big!...aiya they shld revise the actual plan, to have less visible pillars . Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 11, 2008 Day 7...HSS almost done. Left with skirting.Day 8..mbr in progess... Share this post Link to post Share on other sites
nemofc 0 Report post Posted March 12, 2008 happy,so fast hor , tiles are done. Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 12, 2008 Hi NEMYeah, this morning went down and my unit tiles are completed. Except kitchen tiles.And they need to grind off the wax, grind the gount line to smooth and wash the floor before moving to the next steps. So far, very impress and happy with the tiles work. Fyi...Gina only ask 1 tilers to do my unit and my sister unit where normally there are 2 tilers. I will take post the pic.The 4 room tiles work has began....HAPPYhappy,so fast hor , tiles are done. Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 14, 2008 (edited) Day 8....Finally my flooring is done.Manage to get the tiler name: Ah SengOne man operation...for my entire unit!Now waiting for 'grinding' the wax off and wash.Very happy with the worksmanship, cannot feel any cut leg feeling.Eagerly waiting for their next step (That is kitchen tiles). Edited March 14, 2008 by h4happy Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 18, 2008 Hi EverybodySorry abit blur......Did you read the latest chinese U magazine?The unit belong to my mum!Hui master told me it is the first time they came to Jalan Membina and he told me he will write an article about JM.....Hm....guess have to wait for another week??HAPPY Share this post Link to post Share on other sites
kriegs 0 Report post Posted March 19, 2008 Hi EverybodySorry abit blur......Did you read the latest chinese U magazine?The unit belong to my mum!Hui master told me it is the first time they came to Jalan Membina and he told me he will write an article about JM.....Hm....guess have to wait for another week??HAPPYI saw the picture in the article, it was about FS on kitchens. No wonder the picture so familiar Share this post Link to post Share on other sites
bobo_girl 0 Report post Posted March 23, 2008 (edited) Hello BroSaw your msg about yesterday, its okay no worries, understand that its kinda of overwhelming since you're doing up 2 units concurrently.We were there to meet up with a ID. Went up to your place thereafter, saw your tiling done, keep it up.... Edited March 23, 2008 by bobo_girl Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 23, 2008 Hi LynnThanks for your encouragement.Yeah, will be asking my id about the materials they gonna use.Phase 1 (flooring tiles done)Phase 2 (Kichen concrete base and cabinet) and Air con installation.This week, they will do concrete support for my 5 room basin and stove. Same as my mum's ktichen.After that, will discuss with Gina about the kitchen cabinet this saturday again.This coming week, air con installation will be underway, probably next Thur or Fri or Sat.So far so good! Just keep my finger cross! Anyway, saw a stainmark in one of the tiles (my mum's and my unit), will put a big notice to ask them to rectify the problem. Other than that, feel happy with the whole process.HAPPY Hello BroSaw your msg about yesterday, its okay no worries, understand that its kinda of overwhelming since you're doing up 2 units concurrently.We were there to meet up with a ID. Went up to your place thereafter, saw your tiling done, keep it up.... Share this post Link to post Share on other sites
nemofc 0 Report post Posted March 24, 2008 Happy,do invite me when done okay?we are targetting the contractor to handover our unit by end of this month. Share this post Link to post Share on other sites
h4happy 1 Report post Posted March 24, 2008 Hi NEMSure sure no problem at all. I will call you.This week they going to do concrete support for the kitchen and the base for fridge, WM and cabinet for my mum and mine.HAPPYHappy,do invite me when done okay?we are targetting the contractor to handover our unit by end of this month. Share this post Link to post Share on other sites
babytan 0 Report post Posted March 28, 2008 more pictures? btw, you asked me about daybed wor..what is that? i duno scratching my head now leh !! Share this post Link to post Share on other sites