Jump to content
Find Professionals    Deals    Get Quotations   Portfolios
Sign in to follow this  
h4happy

My Sweet Home

Recommended Posts

5 room:

1) Living room window view:

f_IMG9198m_95eb724.jpg

2) Bedroom view.....aiyo forgot to take mbr view....

f_IMG9203m_e9c9b5f.jpg

Another bedroom view...

f_IMG9204m_17e32b8.jpg

4 room:

1) Living room view....

f_IMG9228m_94ba441.jpg

2) Living room another angle...can see blk26c and blk 27b...

f_IMG9225m_6065cd9.jpg

Did not take much as checking for defects....will take again when meet up with FSM.

Hey, my defects not many. About 3 items...

Edited by h4happy
 

Share this post


Link to post
Share on other sites
Looking for good contractors? Click here for your request
2) Living room another angle...can see blk26c and blk 27b...

f_IMG9225m_6065cd9.jpg

Did not take much as checking for defects....will take again when meet up with FSM.

Hey, my defects not many. About 3 items...

hey if u can see 27b, then you must be the side facing west... it's quite hot on your side in the afternoon...

 

Share this post


Link to post
Share on other sites

Hi MAKE

Yes will be hot in the afternoon, that is why I have installed ceiling fans instead of standing fan.

No air con in the living room.

Will install 1 single unit at the mbr.

HAPPY

hey if u can see 27b, then you must be the side facing west... it's quite hot on your side in the afternoon...
 

Share this post


Link to post
Share on other sites

Hello HAR and JAZZ

Yeah, on the high level.

Units have been audited by FSM.

Now, going to submit defects...I wonder casting not properly glue consider defects??

After that tong tu and can start reno liao.

HAPPY

 

Share this post


Link to post
Share on other sites

Thanks JAZZ...need to do it fast or else the reno already on hold....hehehehe

Hi Happy,

Anything u can submit. If u think not satisfied then report. No harm reporting one :unsure:

 

Share this post


Link to post
Share on other sites
Thanks JAZZ...need to do it fast or else the reno already on hold....hehehehe

Hi Happy,

you still can go ahead with ur reno thou they haven finished their reno.. the lady at blk 27B say its ok as lo9ng as you had reported it then they will do it.. :notti:

My wet works will also start next week.. now they are doing the electrical works.. look luck for both our reno ya!:bangwall:! :):yamseng:

 

Share this post


Link to post
Share on other sites
Hi Happy,

you still can go ahead with ur reno thou they haven finished their reno.. the lady at blk 27B say its ok as lo9ng as you had reported it then they will do it.. :notti:

My wet works will also start next week.. now they are doing the electrical works.. look luck for both our reno ya!:bangwall:! :):yamseng:

i wish i know earlier stupid me jus sit on it for 2 weeks waitin for hdb defects...

hehe

how come electrical before wet works? just wondering

gd luckz to all!

Happy--are you doing bomb shelter racks?

Edited by linggie
 

Share this post


Link to post
Share on other sites

Hi LING

I have just submitted my defects to them this morning.

I dont know I have miss out anything as I just glance thru' only.

Tomorrow 11am to 12pm will be at my units to wait for the pub to activate the water and electricity.

Only then can check the toilet and basin and whatever pipes we have (just pour water on it and hope that the water can drain down the pipe):dunno:!

Wondering why electrical cable is lay on the floor before wet works begin? What if it was demage?

Most likely doing shelter racks in HSS as my present house got so many barang barang especially childrens things.

HAPPY

i wish i know earlier stupid me jus sit on it for 2 weeks waitin for hdb defects...

hehe

how come electrical before wet works? just wondering

gd luckz to all!

Happy--are you doing bomb shelter racks?

 

Share this post


Link to post
Share on other sites
Hi LING

I have just submitted my defects to them this morning.

I dont know I have miss out anything as I just glance thru' only.

Tomorrow 11am to 12pm will be at my units to wait for the pub to activate the water and electricity.

Only then can check the toilet and basin and whatever pipes we have (just pour water on it and hope that the water can drain down the pipe):dunno:!

Wondering why electrical cable is lay on the floor before wet works begin? What if it was demage?

Most likely doing shelter racks in HSS as my present house got so many barang barang especially childrens things.

HAPPY

haha can i tag on you if you are doing? i am very lousy at bargaining...

:P

 

Share this post


Link to post
Share on other sites

Sure LING...no problem...I will call you when about to buy the rack.

Have to wait until reno finish first.

haha can i tag on you if you are doing? i am very lousy at bargaining...

:dunno:

 

Share this post


Link to post
Share on other sites

If u got ID better let the ID settle the defects prob of the new hse. DUn wait for HDB to complete first. Coz HDB take ages to do it. :help: Tis is wat i personally experience it heehee.... anyway i not hurry so haahaa let then drag.

Anyway congrats to happy and linggie u going to start reno liao :help:!

 

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
Sign in to follow this  

×