Hi all, I've recently just booked my new 4-rm SBF flat and I'll be getting my keys soon. My flat does not comes with flooring for living room and 3 bedrooms. Only HDB default floor and wall tiles in kitchen and 2 toilets.
I will be going for resilient vinyl flooring all living room and 3 BRs. Kitchen and toilet floor and wall I'm going for homogeneous tiles. I will be appealing for HDB cement screeding in order for me to lay the vinyl flooring.
I will also plan to hack down partial of the kitchen wall and 1st bedroom wall.
Can any laojiaos here provide me a checklist of the renovation process I should check or receive from renovation contractors? (not going for ID)
Some people say flooring goes first, electricity goes first, wetwork/masonry works goes first, plumbing or aircon piping etc. But I am not too sure for my case.
The renovation should involves the following, if I'm not wrong:
1) hacking of walls,
2) vinyl flooring installation / homo tiles overlaying,
3) aircon piping,
4) aluminium/glass work for hacked walls,
5) kitchen table top,
6) blinds,
7) electricity/lightings,
8) carpentry (kitchen cupboards, wardrobes etc)
9) painting (walls),
10) plumbing
I'm not too sure which one should comes before/after each. Please feel free to add in to the checklist. For all your advices! Thanks.