Search the Community
Showing results for tags 'simplereno'.
Found 1 result
-
**Very long post** Hi All, I've been a silent reader (albeit not registered) of Renotalk t-Blog for the longest time (since 2010 - 2011), I have learnt so much and garnered so much inspiration for my 3rm BTO @ Tampines, that, I've decided to share with all of you my reno journey. I would like to apologise in advance if it seems boring, somewhat a repetitive of what you've probably seen before over the years active in this forum / somewhat similar to your reno journey and if I can't be much help. However, I do hope that my contribution will somewhat inspire someone just like how all of the t-blogs have inspired and helped me with my decisions. First up, this is our 3rm flat floorplan: We have gotten our keys in September, after a grueling 3 years wait hohohoho. But it was, to us, good timing as our wedding was in Jan 14’ and we had ample time to prepare prior to receiving the keys. Of course, ID / Contractor hunting wasn’t all that easy. Weeks after key collection, we have not made any decision to which ID / Contractor we were going to engage. It looked like we were somehow taking our own sweet time. DH decided that we both did not have the luxury of time if we were to engage contractors (he works shifts, while I was in the Oil&Gas shipping line **not anymore fr me**) therefore we agreed on engaging an ID. Truthfully, I have started ID hunting on my own 3 years prior to getting our keys. Looking at reviews, testimonials, the work they did, experience of homeowners in renotalk. Researched enough to know what I want and to know what to look for. I only started asking for Quotations late 2013. Of 5 quotations, we met only ONE (we didn’t go ahead with them). & Just about when I wanted to settle with D**s&T**s (meeting the ID and signing the contract), I stumbled upon what would be our ID right now. It’s important that DH feels comfortable with the ID and the price. Design Profession gave us Assurance, Competitive price & Friendship. Most importantly, they can deliver our wants towards the design. I didn’t want our house to be cluttered i.e: to put decorations just for the sake of putting them. DH & I are more towards practicality (cleaning time, dust problems etc etc) than aesthetic (ok maybe 50% aesthetic) so our house should be a balance of both. We wanted industrial theme but I would like for it to be towards being minimalist. Therefore, we embarked on our Minimalist industrial theme (no craftstone brickwall, no cement screeding flooring – due to fear of it cracking in the future and no unnecessary decorative wall etc). Our reno journey started in October 2014, spearheaded by our ID, Rae Foo from Design Profession. He has given us a lot of suggestions, kept up with my questions (I ask A LOT of qns) and is very efficient. In fact, we only go to our house for checks on weekends. The rest of the days, Rae will be there and will update me with pictures. Right now, the renovation has slowed down as we are waiting for our bedroom lights to arrive and for the painting to be done. ANYWAY! Pictures time!! (feel free to ask me any qns and I will be glad to answer them) P.S: I will update in sequence later on the type of floorings, lightings, appliances, painting, air-con & carpentry. For now, an update of our house thus far. =) 1. Before Overlaying of Kitchen Tiles 2. After Overlaying of Kitchen Tiles 3. Laying of living room
- 33 replies
-
- minimalist
- industrial
-
(and 4 more)
Tagged with: