Search the Community
Showing results for tags 'reno quote'.
Found 1 result
-
Hi, I am planning to reno my resale 3 BR 1600 sq ft condo apartment. Existing condition very "original" with heavy woodwork. I got following quote from contractor. This is based on my requirements. Can anyone please tell me if the pricing is right and if not, then what would be a corrected price? For e.g. in debris removal, I dont have any sand to remove, only broken tiles, and wood work. Would that bring the price down. Also I see that no electrical work is included as I did not ask for special light fittings, however once reno starts, i am sure some electrical rewiring etc will come up. How much should I budget for this. Please help ! A Demolition Work Provide labour to hack existing Master Bathroom floor and wall tiles. $ 1,000.00 Provide labour to hack existing long bath at Master Bathroom.$ 150.00 Provide labour to dismantle existing TV feature wall **** $ 200.00 Provide labour to dismantle existing Kitchen cabinet.$ 300.00 Provide labour to dismantle existing wardrobe and headboard feature wall at Master Bedroom.$ 600.00 Provide labour to dismantle existing study table cum wardrobe at Bedroom 1. $ 500.00 Provide labour to dismantle existing display cabinet at Dining.$ 200.00 Provide labour to dismantle existing timber beading for whole unit.$ 150.00 Provide sand, haulage service and debris removal.$ 600 Sub-Total :$ 3,700.00 B Masonry Work Provide labour and material to lay full height wall tiles at Master. $ 2,000.00 Provide labour and material to lay floor tiles at Master.$ 1,000.00 Provide labour and material to lay water proofing membrance at Master.$ 180.00 Sub-Total :$ 3,180.00 C. Plumbing Work Provide labour and material to lay conceal copper piping at Master.$ 1,100.00 Provide labour to install 01 no. Storage Heater. $ 150.00 Provide labour to install 01 no. wash basin and tap.$ 100.00 Provide labour and material to lay water outlet pipe at Master. FOC Sub-Total :$ 1,350.00 D Carpentry Work Design and fabricate 30ft bottom Kitchen cabinet using Solid-ply in selected laminated finish. Include ABS trimming for all door panel.$ 3,600.00 To supply and install 19ft Solid surface kitchen top.$ 1,615.00 Design and fabricate 4ft suspended Vanity cabinet at Master Bathroom To supply and install 4ft Solid surface vanity top.$ 340.00 Design and fabricate 4ft storage mirror cabinet at Master Bathroom.$ 720.00 Design and fabricate 7ft full height ( 2.7M ) casement wardrobe in selected laminated finish at Master bathroom $ 2,030.00 Design and fabricate 8ft full height ( 2.7M ) casement wardrobe in selected laminated finish at Master. $ 2,320.00 Design and fabricate 6ft full height ( 2.7M ) casement wardrobe in selected laminated finish at Bedroom 1.$ 1,740.00 Design and fabricate 6ft full height ( 2.7M ) casement wardrobe in selected laminated finish at Bedroom 2. $ 1,740.00 Design and fabricate 6ft suspended Study table c/w drawer in selected laminated finish.$ 960.00 Design and fabricate 8ft full height ( 2.7M ) TV feature wall $ 1,875.0 Design and fabricate 6ft suspended TV console in selected laminated finish$ 900.00 Design and fabricate 5ft display cabinet in selected laminated finish at Dining Area$ 1,500.00 To supply and install 3ft full height mirror at Master bedroom $ 350.00 Design and fabricate full height shoes cabinet at main entrance.$ 800.00 Sub-Total : $ 20,490.00 E Window Grilles Work To supply and install aluminium sliding window grilles at 3 Bedroom and dining area $ 850.00 To supply and install aluminium sliding window grilles at Service yard. $ 120.00 Sub-Total : $ 970.00 F Painting Work Provide labour and material to paint internal wall and ceiling with Nippon Paint. ( 5 Colour )$ 1,600.00 Sub-Total : $ 1,600.00 G Air Con Work To supply and install Mitsubishi system 2 Inverter unit $ 4,500.00 To supply and install Mitsubishi system 3 Inverter unit at 3 Bedroom.$ 4,000.00 Sub-Total : $ 8,500.00 H Miscellaneous Work Chemical washing and general washing for whole unit.$ 350.00 Provide labour to revanish 3 Bedroom parquet floor and skirting.$ 1,500.00 To supply and install 01 no. Wrought iron main gate.$ 1,000.00 To supply and install 02 nos. Bi-fold door at Yard.$ 450.00 Sub-Total : $ 3,300.00 Grand Total : $ 43,090.00