Hmm.. I've read some of the t-blogs here.. So its time for me to contribute.. To share our experiences in this home reno journey. We collected our keys on 11 March 2014.. Signed everything & there goes our CPF balances~ Here is our floor plan.. Here are some pictures of how our house looked before the check.. This the 3rd week since we collected our keys but we have not submitted our feedback form to the BSC. There are so much to check and I wondered how to complete checking within 7 days. With the help with an ID, we finished checking & will be submitting the form in today. Now my house is full of masking tapes to show the defects. Our project is the developer’s first HDB project. While checking, my id was shocked by the quality of the work being done. We have slanted switches, uneven & rough walls, lots of gaps between top & bottom of wood skirtings, badly filled grouting, leaking toilet bowl, cracked floor tiles, missing window screws, all the windows cannot be opened smoothly and dent window frames, chipped walls, and many more.. Will post some photos on the defects later.