So I have been reading up lots of Reno t-Blogs ever since we had balloted for our flat. It had been a long four years wait when we finally got our keys. We got our keys in late July this year and got our shortlisted IDs/contractors to come down for actual site measurements and to revise their quotations accordingly. In the end, we decided on an ID though he does not have the cheapest quotation.
Our unit layout:
The main reason we chose him was that he seemed to be able to visualize the house that we wanted. I had a certain idea on how I want my house to be but there were some parts where I am unsure on the practicability of them. With the 3D drawn, we started the renovation on end Sept 2016.
The main colours that we are going to use in the house is oak wood, white and black. I do not think that there is any specific theme. I am hoping that the house will look simple and clean.
First off, tiling started! We had decided to lay the same floor tiles (black with light grey stripes) for living and bedrooms. Grouting is black but currently it looked white as the dust had accumulated =.=.
Next off, black floor tiles and marble-like wall tiles for both bathrooms, For the wall tiles, due to budget constraints, we only overlay the default feature wall ( black for master toilet, white for common toilet)