Search the Community
Showing results for tags 'Property'.
Found 8 results
-
Hi All, I am looking to sell my unit. Need to upgrade to a larger place as my family size has grown. It has 2 bedroom, 2 bathroom, only 4.5 years old. Corner unit. Located just next to Pasir Ris MRT / White Sands Shopping mall. Extremely easy access to amenities nearby - Sports complex, fishing pond and many more! Perfect for couples / newly weds with small family or elderly looking to downgrade to a smaller unit. Move in condition with no renovation required! Price is VERY negotiable and I am open to ALL offers. For more info, feel free to call me at tel: 96543198
- 21 replies
-
Hi Renotalk members, desperately looking for opinions on whether the quote that the contractor has give me is competitive. Just want to do a basic upgrade from 2 to 2.5 stories. The contractor seems like a really genuine so I am really keen on him if the price is right. 1 PELINIMARIES a) Q.P. endorsement for A&A submission only (Not include of government department fees). $ 14,000.00 b) Q.P. endorsement for Re-construction submission only (Not include of government department fees). $ 32,000.00 c) Soil test (drill hole at front garden with machinery) $ 3,500.00 d) Safety, noise motoring machine. $ 3,750.00 e) Surveyor (if require) $ 2,000.00 f) Insurance $ 1,300.00 g) Scaffolding $ 3,800.00 2 DEMOLISHING A) Hack existing attic room walls, floor finishing, existing 2nd storey concrete beam b) Dismantle existing false ceiling, part of railing & dispose away (for new staircase) $ 350.00 3 ROOF a) Fabricate & install new 150 x 50 x 5mm thk mild steel RHS (or equivalent) rafter, 50 x 25 x 3mm thk mild steel RHS batten. Install Parsec foil, German roof tile & necessary accessories for new roof works. $ 29,650.00 4 STRUCTURE a) Fabricate & install new attic floor using mild steel RHS support (200 x 100 x 5mm), bondeck sheet, layer of BRC mesh, 100mm concrete slab. $ 36,750.00 b) Fabricate & install new mild steel columns & beam from attic to roof using 100 x 100 x 5mm SHS. (if require to install down to 1st storey, separate quotation will be impose) $ 14,950.00 c) Fabricate & install new mild steel staircase from 2nd storey to new attic using 125 x 50 x 5mm thk RHS for frame, 4mm thk steel plate base. $ 7,220.00 5 BRICKWORKS a) Construct new brick walls for new attic area. $ 6,165.00 6 WALL FINISH a) Cement plaster to new brickwalls for internal & external (use non shrink cement) $ 9,360.00 7 CEILING a) Install 9mm thk gypsum plaster board ceiling for new attic area. $ 2,938.00 b) Make good 2nd storey ceiling due to new works. $ 1,230.00 8 WINDOWS a) Fabricate & install 2 Nos of new aluminium window 2000 x 1200mm for front façade. $ 1,550.00 9 FLOOR FINISH a) Install 20mm thk plywood base for mild steel staircase, installed normal parquet c/w skirting. $ 3,400.00 b) Install 250 x 50 x 12mm thk parquet c/w skirting for new attic area. $ 7,936.50 10 DOOR / DOOR FRAME a) Fabricate & install new nyatoh door & door frame c/w varnish finish. $ 650.00 11 PAINTING a) ICI emulsion painting to internal walls, white emulsion to ceiling & Nippon weatherbond for external walls. $ 2,300.00 12 RAILING a) Fabricate & install new mild steel railing from 2nd storey to new attic area. $ 1,500.00 13 TOILET a) New brick wall,wall & floor tiles, waterproofing, door & door frame, tempered glass shower screen (toilet size 1500 x 1800mm) Install new stach pipe, copper supply pipe & install sanitary wares. $ 9,200.00 14 BOOTER PUMP SYSTEM a) Install 1000 x 1000 x 1000mm PVC fiber tank, 2 Nos of horizontal multistage centrifugal pump, 1 No of pressure vessel tank c/w control panel. Install new incoming copper pipe (25mm) from main meter to new water tank area. Install new 20mm copper pipe outlet to existing 2nd storey toilets & new attic toilet. (1st storey remain unchanged) $ 13,890.00 15 Dismantle existing master & 2 bedrooms wardrobe, re-install after concrete beam been hack, make good external housing corner veneer. Including alter family hall book cupboard door. $ 980.00 16 NEW METER COMPARTMENT a) Construct new concrete footing, brick walls, cement plaster, new aluminium door, PVC pipe sleeve for external (under the drain) and internal (from new compartment to building external wall area) make good damage floor tile. Relocate existing water meter to new compartment area. $ 6,850.00 17 GATE & FENCING a) Fabricate & install new wrought iron swing gate and auto swing motor system. (Malaysian Made) $ 4,890.00 b) Fabricate & install new wrought iron fence to replace existing. $ 950.00 c) Cement plaster existing low wall & column. $ 990.00 18 WOODEN DECK FENCING & CEMENT SCREED a) Dismantle, demolish existing brick wall fence and dispose away. $ 450.00 b) Construct 95 x 95mm wooden column, 100 x 50mm truss and 95 x 28mm desk strip. $ 10,500.00 c) Construct 95 x 20mm, wooden strip fencing. $ 6,400.00 d) Cement screed & base to existing floor. $ 840.00 19 ELECTRICAL WORKS a) Install new teak wood panel for new meter compartment. $ 320.00 b) Install 10mm x 3 main cable + 10mm earth cable from new compartment to new DB area. $ 2,850.00 c) Install new DB c/w 48 ways + earth pit $ 2,930.00 d) Install 10mm x 3 main cable + 10mm earth cable from 1st storey DB to 2nd storey DB $ 2,350.00 e) Install new sub DB c/w 32 ways + earthling. $ 1,750.00 f) Install 3 Nos of cat 6 and 2 Nos of 2 core cable from new compartment to new DB area. $ 950.00 g) Install new RG6 cable from new compartment to new DB area. $ 620.00 h) Install PVC pipe sleeve for open Net cable from new compartment to new DB area. $ 300.00 i) Install lighting conductor aluminium strip c/w 2 Nos of copper earth pit & inspection box. Including PE endorsement $ 3,800.00 j) Install new light point @$60.00 k) Install new 1x13A socket @$80.00 l) Install new 2x13A socket @$90.00 m) Install new telephone point @$100.00 n) Install new LAN point @$100.00 o) Install new SCV point @$105.00 p) Install new 15A heater point @$180.00 q) Install new 15A heater point (2 ways) @$260.00 r) Install new 20A Isolator @$230.00 s) Install new 32A Isolator @$280.00 t) Install light fitting @$12.00 u) Install ceiling fan @$40.00
- 9 replies
-
- reconstructionA&A
- Quotation
-
(and 4 more)
Tagged with:
-
Hi everyone I am the real estate guy in Singapore. I do not see myself selling properties to people. Rather, I listen to the needs and wants of my clients. Not everyone has the same need or want. Young couples aspire to get their new homes but are in a dilemma whether they should get BTO, resales HDB or even Executive Condominiums. They are always at a loss because as this is their first home so they will be extremely careful with their choice, yet often than not, they need genuine real estate advice as to what is their best choice given their current situation. I have joined this forum to know the needs of people while they are planning to buy a property.
-
- property
- real estate
-
(and 3 more)
Tagged with:
-
Here are some of the projects by SP SETIA In Johor Properties Here: http://www.cascadia.com.my/ http://www.setiaecogardens.com.my/property.aspx http://www.setiatropika.com.my/ http://www.spsetia.com/en-us/ Anymore list you guys wanna add?
-
Will 3-Month Sibor Continue To Increase? Time To Re-Finance?
Guest posted a topic in Finance and Insurance
The experts have said that 3-month Sibor will continue to increase until 1.75 per cent in a year's time. I'm still within a lock-in period with my current mortgage loan, but I'm afraid I don't refinance now, I may stand to lose more in the LT. Would you pay the penalty fee and refinance now?- 7 replies
-
- #sibor
- mortgage loan
-
(and 3 more)
Tagged with:
-
***** Are you looking to transform a room or space in your house but just haven’t had the time to think about getting your project started?We’re here to help!Beach House Pictures is looking for interested candidates who would like to receive assistance in styling their space from one of the region’s leading Interior Design firms. Whether it be a bedroom that needs more functional space, to a living room that’s crying out for comfort and class, or a bathroom that just needs a professional touch – we want to help you to achieve your dream! Interested candidates should send in the following to joe@beachhousepictures.com: Name Contact Details A short write-up about yourself and the space you’re looking to style NOTE: Interested candidates should already have a budget – our professionals will step in and do the rest! *****
-
Hi All, Above is total a time consuming action required from hectic working adults like us. However we tend to rather absorb this additional task to our already stressful life in turn to save $ to engage the subject matter experts thinking we rather save the money for other things which need to be purchase upon getting keys! Now my question to you all out there is, how many have you all tried to do this on your own and yet realised there was oversight/overlooked detailed things due to lack experience and ended up paying more after the warranty period to get the renovation company to resolve your issues???????????????????? Would you have engaged the service before after going through the difficulties for NOT engaging one after your key collection and rushed into staring the RENO works???? Some defects list can go up to 80+ defects. Should one consider this a little investment for the long run? Defects here can be so detailed that we can realise them only after moving into your new home during rainy weathers such as where the floor leveling problem surfaces for an instance.