Search the Community
Showing results for tags '3 room bto'.
Found 2 results
-
Hi all, have been reading renotalk for years but hardly ever made much of a sound except to ask questions. We balloted for our flat in 2010 and patiently waited for our keys. We FINALLY got our keys on the 5th of feb and straight away rush down to open the door. I am very pantang so hubby has to tahan the later change of key collection at Punggol Parcvista. With our frens, we went down to punggol to check out the place. after rolling our pineapple and screaming HUAT AH! at the top of our voices, we stepped in. Its small.. but its our home!! Our flat : We actually wanted to start our reno immediately as soon as possible but our ID just came back from his new yr holiday. What to do? people need to go home.. brain understand but my excitment can get the better of me. I thought he will delay abit longer but he was all rearing to go. the minute he stepped back into singapore, he gave me a call to ask me if he can go to my flat to check the defects. He knows my pattern after liasing with me, that he knows how fussy i am, so he knew it was best tat he went down to check for me if not anything happen, ill have his head!! (lucky i carry the padlock key with me everywhere i go now, if not have to rush home to get it) So yesterday was the billionth time we went down to our flat but this time, it was with our ID to check the defects. and omg.. the number of defects he pointed out was crazy. End up, BSC has to replaster EVERY SINGLE ROOM! even the CEILING. all the walls were uneven, the ceiling had a very obvious uneveness in it ( the middle portion was slopped upwards at a sharp angle then down again..like they ran out of plaster halfway and left the job, probably praying hard i didnt mind). the worst part was my toilet ceiling, in a corner, the brick wall was exposed and cracked. lucky my ID very xi xin and spotted it if not i will never have spotted it because it was hidden behind the pipes! Lucky he suggested to come and check.. because all the time we went up there, we never notice all these things.. i guess... new owners syndrome. blind to all our flat's faults. and these are just SOME of the defects. if i list down all, never ending. although my flat is so humid and hot, he still climb here climb there, stretch here stretch there.. btw.. if you looking for ID remember to find a tall one. our ID is much taller than me and my hubby and he was able to touch the top of the door ways to feel the walls. by the time we were finished, it was quite late, but he still stuck it out with us for more than 2-3 hours to go through the entire house for defects several times and run through what will and can be done. thats what i call good service! while BSC is doing the defects, my ID is going to resend me the amended 3d drawings from our discussion yesterday. so we are now "patiently" waiting for them, trying to keep my crazy down and not calling him everyday to see if its done! *patiently waiting..........*
- 296 replies
-
- 1
-
- defects
- punggol parcvista
-
(and 3 more)
Tagged with:
-
From the album: Project Shoebox
-
- floorplan
- 3 room hdb
-
(and 4 more)
Tagged with: