Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Dreamz

Members
  • Content Count

    6
  • Joined

  • Last visited

Everything posted by Dreamz

  1. Please advise where to purchase cheap storeroom rack? Thanks and Appreciate lots!
  2. Dear All, Any advise on where to get the store room racks and what is good? Any contacts to advise? Thanks
  3. You should call your contractor and ask him to change the tiles for you. I experience the same senario as you as the sub-contrator fix up the towel holder without asking for our opinion on the position. We called the main con. and asked him to change the tiles for us and they did so
  4. thanks tofler my fiancee's place is veri near yr place 2 we saw a few flat in the area, nice area and the floor area is big too hehe ... polishing of kitchen top should be << lesser that yr flooring cos so much lesser surface area. what's yr quotation for yr toilet?
  5. thanks for all the feedback All the prices are ok, except for the hacking=$1800 and polishing of Corian kitchen table top=$500. Expensive? What kind of tempered glass showerscreen design, brand or price should I consider? 10mm thickness? Frameless? What kind of tiles range should I ask for ? <$3 per square feet? Please advise thanks
  6. I would like to engage my contractor for the following job, but is it too expensive? Especially the hacking of toilet charges? Please advise! DESCRIPTION KITCHEN 1. To supply labour and re-polish existing kitchen Corian solid surface table top. (Length : 13’) S$500 2. To supply and construct tempered glass panels backing at kitchen walls where existing cabinets are constructed including remove existing stainless sheet at cooking area. S$850 3. To supply and replace 6pcs of floor tiles at washing machine area using back same existing flooring tiles. KIV SUB TOTAL S$1350 Master Bedroom 1. To supply construct one false wall using partition board c/w plaster smooth surfaces behind the bed frame. (Length: 6’). S$380 SUB TOTAL S$380 Master & Common Toilets 1. To supply and lay new floor tiles using non-slip homogenous tiles at 02 toilets flooring. S$900 2. To supply and tile up new wall tiles to ceiling height at common toilet. S$1200 3. To supply and tile up new wall tiles to ceiling height at master toilet. S$1200 4. To supply and apply water membrane at two toilets flooring. S$200 5. To supply and install one exhaust fan at master toilets included panel & power point. S$340 6. To supply labour to install two toilets bowls. S$140 7. To supply and install black China granite table top at common toilet. (L:2.5’) (Basin & tap supply by owner). S$350 8. To supply and install black China granite table top at master toilet. (Length: 5’) (Basin & tap supply by owner). S$550 8b. To supply and install one mirror, 3nos of glass shelves & suspend laminate cabinet at master toilet. (Length: 5’) S$750 9. To supply and install casement temper shower screen for master toilets. S$540 10. To supply labour to install one rain shower head at master toilet. (Fittings supply by owner). F.O.C 11. To supply and install shower curtain at common toilets. (Fittings supply by owner). F.O.C 12. To supply and install new hot/cold stainless steel piping at Master & common toilets only. S$550 SUB TOTAL S$6720 HACKING 1. To hack existing wall tiles for master and common toilets. 2. To hack existing flooring for master and common toilets. 3. To supply sand and clear all debris. 4. To load up renovation materials. SUB TOTAL S$1800 OTHERS 1. To supply and seal up existing air ventilation on top hung of store room using partition boards c/w plaster smooth finish. S$40 2. To supply labour to growl window below edges at Living, Guest room & master bedroom. F.O.C 3. To supply labour to patch existing crack lines hair in plaster smooth finishes at Guest room. F.O.C 4. To supply labour to dismantle existing one open shelving **** hall. F.O.C 5. To supply labour to dismantle existing exhaust fans at master & common toilets. F.O.C 6. To supply labour to dismantle existing vanity top, basin & shower screen for master & common toilets. F.O.C 7. To purchase back existing paint model to paint walls & at affected areas. S$450 8. To supply labour and apply chemical acid to wash at kitchen, master & common toilets & clean up whole house. F.O.C SUB TOTAL S$490 TOTAL RENOVATION COST S$10,740
×