I would like to engage my contractor for the following job, but is it too expensive? Especially the hacking of toilet charges?
Please advise!
DESCRIPTION
KITCHEN
1. To supply labour and re-polish existing kitchen Corian solid
surface table top. (Length : 13’) S$500
2. To supply and construct tempered glass panels backing
at kitchen walls where existing cabinets are constructed
including remove existing stainless sheet at cooking area. S$850
3. To supply and replace 6pcs of floor tiles at washing machine
area using back same existing flooring tiles. KIV
SUB TOTAL S$1350
Master Bedroom
1. To supply construct one false wall using partition board
c/w plaster smooth surfaces behind the bed frame.
(Length: 6’). S$380
SUB TOTAL S$380
Master & Common Toilets
1. To supply and lay new floor tiles using non-slip homogenous
tiles at 02 toilets flooring. S$900
2. To supply and tile up new wall tiles to ceiling height at common
toilet. S$1200
3. To supply and tile up new wall tiles to ceiling height at master
toilet. S$1200
4. To supply and apply water membrane at two toilets flooring. S$200
5. To supply and install one exhaust fan at master toilets
included panel & power point. S$340
6. To supply labour to install two toilets bowls. S$140
7. To supply and install black China granite table top at
common toilet. (L:2.5’)
(Basin & tap supply by owner). S$350
8. To supply and install black China granite table top at
master toilet. (Length: 5’)
(Basin & tap supply by owner). S$550
8b. To supply and install one mirror, 3nos of glass shelves &
suspend laminate cabinet at master toilet. (Length: 5’) S$750
9. To supply and install casement temper shower screen for
master toilets. S$540
10. To supply labour to install one rain shower head at master toilet.
(Fittings supply by owner). F.O.C
11. To supply and install shower curtain at common toilets.
(Fittings supply by owner). F.O.C
12. To supply and install new hot/cold stainless steel piping at
Master & common toilets only. S$550
SUB TOTAL S$6720
HACKING
1. To hack existing wall tiles for master and common toilets.
2. To hack existing flooring for master and common toilets.
3. To supply sand and clear all debris.
4. To load up renovation materials.
SUB TOTAL S$1800
OTHERS
1. To supply and seal up existing air ventilation on top
hung of store room using partition boards c/w plaster
smooth finish. S$40
2. To supply labour to growl window below edges at
Living, Guest room & master bedroom. F.O.C
3. To supply labour to patch existing crack lines hair
in plaster smooth finishes at Guest room. F.O.C
4. To supply labour to dismantle existing one open
shelving **** hall. F.O.C
5. To supply labour to dismantle existing exhaust fans at
master & common toilets. F.O.C
6. To supply labour to dismantle existing vanity top, basin
& shower screen for master & common toilets. F.O.C
7. To purchase back existing paint model to paint walls &
at affected areas. S$450
8. To supply labour and apply chemical acid to wash at kitchen,
master & common toilets & clean up whole house. F.O.C
SUB TOTAL S$490
TOTAL RENOVATION COST S$10,740