Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

unLucky2

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About unLucky2

  • Rank
    Newbie
  1. This is what happened to me when I engaged True Value Sketches Pte Ltd; 1. Went through list of works to parts of my house. Verbally, he (Terrance Ang) said, everything is ok. And estimated completion date was given too. Nothing was said about not able to do the requested. Measurements were taken at 2 different occasions. 2. Quotation is not the cheapest but his reasoning makes him sound experienced so choice was made to go with him and his company. 3. Chat group was form with his designer and him. His words from start was always about, even after payment of deposit, and if proposal is not done satisfactory, he will still accept as low as $1,000 reno job, even from any cost reno job, after many revisions to the designs. 4. He gave schedule of works, but he cannot fulfill it. The words he always use is; "hope that next week can arrange the date". The thing is...'hope' to come to a time when he has time to arrange for the work to be done. 5. Hacked down my window but new window not done, and since we are ground floor, left us to security issues which he puts up boards after making sure we know its payable. Why not hack only when new windows are ready? 6. Designs done by his designer, after amendments, which was sent to the chat group, finally after wasting lots of time, he said, his designs cannot be done, cos there is no such hardware available in the market. (My new contractor got it done). 7. Gave date as to when things will need to come in the till the renovation part but he doesnt bother to do the painting, until that day when the things comes in. So painting was 1 coat and many parts left out and badly done. His painter even dragged the plastics on my flooring and my flooring is currently powdery due to layer of coating is scratched out by his guys when they drag out their things on my floor. Much damage was done. 8. He then added he cannot find hacker and tile people and had to delay cos we delayed, which we did not (I dont know how could we delay when it is his guys who made the mistakes and he coming in to say no finally). 9. Even setting up the fans and lights, his guys are not capable to get it correct and I had to bring in another person who can get it correct. His guys kept saying we are missing some parts. But the guy I called to come in to solve, only took 5min to 10min and resolved it, without any extra parts. It cost me $50 for the other guy, and he refused to admit that his guys couldnt get it correctly set up for 2 days. 10. A lot more things... 11. Finally, asked him to return my money as many things are not done. I have paid about 45%. 12. I took photos of all those not done, even vanity set was done halfway and he charges the whole amount. He said he will not come back to do it. Just deduct but he still charged in full. I told him to come down since he says he has photos from his guys, which they took from far away, and it doesnt show correctly what was not done. Even does not show that the 2nd coating was not done and many other touch ups. 13. He came up with his non-negotiable amount of refund to us, and I said he seems to leave me with no choice. I did not accept the amount. And he just insisted to come to my house to pass us a cash cheque but crossed. This is absurd as it means he wants to put me through the pain of having to get to the bank. I kept saying to just transfer the money but he refused. 14. The wrong amount cheque went through and he deemed that accepted. And though i had kept at asking for the remaining sums, which I had even disregard the damages done to my floor and many other little details, he kept at saying that he has proof to all the work done. Main thing; 15. I have been trying to get him to come down to talk to him about the details wrong that his workers came down, and not once he comes down to get the work correct. He left everything to his guys to manage and we had to tell them what to do, but at some point, they kept saying they are not told to do this / that. He refused to come down to even check the difference between our photos and his guys' photos for him, as ours clearly shows the work not done. I waited for him to come down, gave him more than 10 days and many messages to tell him that we are about to start painting and he cannot see the proof for himself already, but he refused to come down. I had to carry on to finish my reno by the next contractor as the house is in a mess for some time by then. His English is very good, to sneak around his words and he would point out that he had never promised you but hope only, to get back to u with an answer. 16. He even blocked my husband's number as he dont want to answer fast. His replies are many days after or weeks. He just drags the time and delay everything. This was what happened. It was agonizing that we had to live with the mess for so long and every day, we walked to bed with all the concrete powdery feel on our feet, to get to our beds to sleep. If you want more details, I can provide.
×