Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Meowoofoink

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Meowoofoink

  • Rank
    Newbie

Previous Fields

  • Renovator Engaged
    Gplan design
  • Gender
    Female
  1. Hi all bros and sistas, i have signed up with Aaron from Gplan, below is my agreement contract signed... A) MASONRY WORKS 1 Construct kitchen cabinet base 2 Construct fridge base 3 Construct washing machine base 4 Laying of homogeneous floor tiles ****, dining & household shelter c/w skirting (I chose $3.90 tiles) B) Laminate flooring 1 Laying of Power dekor laminate flooring for 3 bedrooms c/w skirting C) Gypsum board partition works 1 Construct partition wall c/w beam at kitchen entrance 2 Construct Box up at dining area as per design 3 Construct simple cornice for whole unit less foyer area 4 Construct false ceiling c/w mirror at foyer area as per design D) Plumbing works 1 Install bathroom accessories at 2 bathrooms 2 Install kitchen sink & tap 3 Extension of washing machine tap 4 Install storage heater 5 Laying of concealed drainage piping for sink & washing machine E) Painting works 1 Painting of whole unit internal walls with ICI pentalite paint (3+1) F) Carpentry works 1 Custom made 26ft kitchen cabinet 2 Custom made 7ft full height wardrobe sliding door 3 Custom made 12ft low height shoe cabinet c/w centre tinted mirror design 4 Custom made CORIAN worktop for kitchen cabinet G) Misc works 1 Laying of corrugated paper for whole unit 2 General cleaning and chemical washing of whole unit 3 Daikin Inverter aircon system 3 (with thicker insulation) Total Damage = $18305 At least i feel this ID is honest enough to tell me there will be hidden costs such as electrical power points, fittings & fixtures (All these he will ask his company's electrician to give me a quote on the site) and charges such as a haulage fee and city gas connection . The other ID's i went to at IMM all tried to push their luck and make me sign on the spot to lock in the promotion packages. i went down to my house today afternoon to see what's going on at my house... woo haa, my tiling is already 90% completed with the grout lines at only 1mm thin... saturday they sent the tiles, cement and sand to my house... yesterday they started work and now left with only the kitchen cabinet base and some near the window bay area... there were 3 workers working on it and i should say they are very fast and good... this thursday the electrician and air con trunking is going to install...
×