Jack L
Members-
Content Count
25 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by Jack L
-
Electrical works quote
Jack L replied to Kellhound's topic in Landed & Condo Private Properties Renovation Discussion
Thanks for the info. -
Electrical works quote
Jack L replied to Kellhound's topic in Landed & Condo Private Properties Renovation Discussion
Any idea where to buy pop up floor power socket? I searched over the internet for them with Safety Mark, but unable to find. -
Electrical works quote
Jack L replied to Kellhound's topic in Landed & Condo Private Properties Renovation Discussion
Where does the OpenNet termination point usually locate in a landed house, meter box or inside the house? I am planning for a new bulid. Guess this determines where I should put the router. Thanks. -
Electrical works quote
Jack L replied to Kellhound's topic in Landed & Condo Private Properties Renovation Discussion
Thanks, @AWS, very detailed information. I'll buy all 3 types of SPD by myself in that case BTW, it seems to me that most of the electricity safety measures rely on the grounding - so proper grounding is super important. -
Electrical works quote
Jack L replied to Kellhound's topic in Landed & Condo Private Properties Renovation Discussion
Thanks for the sharing, @AWS. For the surge protection devices, should one buy them and pass to the electrician for installation or request the electrician to source and install? Try to understand the common practice here 😅 -
PE proposed UC beam and the height will be around 350mm. For the P trap issue, will see how it will be worked around later. Thanks for bringing it up, @snoozee. You are quite right. URA allows protrusion up to 0.5m. BCA enforces SS 550:2020 compliance for all plans submitted after 1 July 2021, which requires even higher headroom. Schindler raised the min headroom from 3.5m to 4.1m due to this code. Small players requires min 3.5m. My architect suggests getting a waiver from URA for higher protrusion. I have been shopping around and found that a 1m/s traction glass lift with 5 stops costs from 60K to 90+K, annual maintenance is from 2K to 3K.
-
Yes, mezzanine is above the 1st storey. The house is located in a 2-storey semi-detached control area so the total height can't exceed 12m. Really admire your detailed analysis 👍 Exactly the case. Will attend the meeting tmr with the architects and PE to see how they address the issue. Yes, stacked toilets are easy. Will need to see how to handle the unstacked ones. Thanks for highlighting this important issue
-
Hi friends, my architect designed 2-flight stairs around lift (8 stairs + 9) as below. I heard that 3-flight will be more comfortable to walk (6 + 5 + 6), after all the green part is passageway. What's your thoughts? @snooze @George Yeo @AWS and all the great people in the forum. Thank you in advance