Urgent Need For Contractor To Do Toilets..recommendation Pls!
pro2 replied to gingerbelle's topic in RENOVATION WORKS
To Gingerbelle, 1st of all, I would like to check with you on the location of your Resale HDB apt. 2nd thing is to check with you on the age of your resale hdb apt. If your apt that you've bought over is at least 6yrs old & above, I would strongly recommend you to hack & re-do the floor tiles because: Yes, overlaying will be cheaper as you need not pay for the hacking of the existing tiles. But the problem with overlaying is that cement does not stick well on a smooth surface such as wall tiles even with chemical adhesive added. So theres a possibility of tiles popping out prematurely. You have to decide between saving a thousand plus dollars & risk having tiles falling out / popping out in a year or two or paying a fraction more of the overall amount & having the peace of mind. Design is all about practicality & aesthetics. -
Hi Kuay5, I just pm you. Pls check your pm. Thanks.
-
Is Is Necessary To Do Rewiring For A 12 Yrs Unit?
pro2 replied to Cherry's topic in RENOVATION WORKS
Hi Cherry, I would generally suggest to you to do rewiring for the whole house to save the trouble & hassles in future whether you intend to stay in that place for long term or for short term. -
The Most Reasonable Sequence Of Renovation Work
pro2 replied to plusnplus's topic in RENOVATION WORKS
The proper sequence is: 1. Lay all floor tiles living room, follow by the rooms, kitchen & two bathrooms. 2. Lay wall tiles for both bathroom & the kitchen. 3.Plaster all walls & ceilings 4. Rewiring of whole house 5. Install Aircon & aircon trunking 6. False ceiling / L-Box with light holder if you're doing any. 7. Install all Piping & sanitary wares & bathroom accesscories. 8. Painting of whole house wall & ceiling. 9. Install all carpentry works including kitchen cabinet. 10. Wash up whole house 11. Final Touch Up & return keys to owner. -
Hi Cute elephant, For your information, the hacking of the existing floor tiles & disposal of the debris & haulages will take at least 2-3 days based on zero hiccups. Then the delivery of tiles must be right on the dot + zero problems when you open to check every piece of tiles. Then workmanship must be properly done. Based on methods of laying the tiles either wet / dry method, plus minus, give & take at least 2-3weeks. So once the flooring is done, the washer will come in & do chemical washing for you, and you need another 1-2 days for the place to dry. Thru out the entire process, no one stays in the house. Trust me.
-
You can still used the normal mop, but try to squeeze dry the mop manually (using ur bare hand) or you can buy those commercial pails that comes with the squeezing thing in the bucket to squeeze dry the mop which most cleaners used in shopping malls. I can't recall the brands, too many already. But you can used Dettol (green colour bottle with white cap) 1500ml - Cuts thru dirt & grease - Kills disease causing germs even in diultion - Deodorises with pleasant fresh scent - Suitable for all floors Please follow the instructions / directions for usages.
-
Hi skyy, I would recommend to you to used a not so wet mop to just go thru the place as no matter what, granite is still a porous stone. It will still absord water. Remember, the mop cannot be too wet. Used hot / warm water to mop the floor to quicken the process of floor drying. As for the detergent wise, try not to use those detergents that are too acidic for e.g. like Mr. Muscle The normal blue colour detergent that we used to clean the floor will do.
-
Attention: Icegal Kitchen ---------- 4. Construct fridge and washing machine base 5. Construct cabinet mortar base Make sure it is paid as one LUMP SUM. Make sure ur ID don't charge you seperately. Master Bath/Common Bath --------------------------------- 1. Supply and install 10mm clear tempered glass shower screen No shower kerb stated? U must have shower kerbs done before you can install the framless tempered glass shower screen. Any Hidden cost? Plumbing Works -------------------- Supply labour and material to install: 1 x kitchen sink with kitchen tap 2 sets of bath accessories U can get it for FOC Miscellaneous ----------------- 3. Provide cardboard protection to flooring instal hood & hob You can get for FOC also Most Impt thing is read all the tiny clauses before you sign on the dotted line and please make sure no hidden costs.
-
Hi all, Roof top terraced, you can simply lay chengai wood over the entire roof top flooring like a platform and making use of the same timber to construct an Al Fresco Style decking and used out door furnitures with simple things like umbrella, chairs and tables (beach style), potted plants are okay and does not require approval.
-
Please read our Forum Rules on Badmouthing, Slandering and Personal Attacks. Didn't you read the T&C when you register in this forum? On one hand you sms to please me, and yet you badmouth behind my back. If I knew this would happen, I wouldn't have taken up your project in the first place, and let the project dragged over 3 months which usually is completed within one & a half month. And in the end, allowing you to damage my 11yrs of clean record & reputations. I'm deeply sadden & hurt by your remarks. I don't expect any credit from you, but please don't slander me. In any forum, anyone also have the right to post their views because I don't see that you're helping or giving any form of TIPS to anyone in here.
-
Hi Chris & everyone First of all, I would like to thank my faithful & loyal client to inform me of this forum that is circulating about me & my company. I'm really very thankful to those out there as my supporting customers. I am Candy, manager & also one of the director from The Interior Place. I am very new to this kind of forum & in fact this is my first time reading it but I have heard about this forum & never have the time & chance to read. Very sad & disappointed to see what Chris had badmouth about me. After all I have been in this industry for 11 years, this is the 1st time I come across this type of issue. Since you've all heard his version & now I would like to explain my version (instead of just listening to his side of the story... ...) Since I want to be true & transparent so there's some words which you might not like to hear. Just hope for your kind understanding.... Quote - 5 Apr As you mentioned, you came to me because someone RECOMMENDED us to you & you ARE IMPRESSED by our workmanship. Lets begin with the 1st day of reno : I specified to you & your wife that both of you must be around on the 1st day of work for job briefing but to my surprised you were not present for such important biefing and left my tiler and myself including my electrician to run through the details with your father-in-law, your wife & her brother. Under normal circumstances, it should be ok but somehow things do not turn out to be. Maybe you are not aware how they changed the entire layout during the briefing.. Can anyone imagine when all tiles have been already been sent to the jobsite & just because of certain comments made by a 3rd party, everything has to be changed right down to the selection of tiles and even scolded me "stupid" for suggesting a certain layout... That certain 3rd party kept questioning why this have to be in this position & why that has to be in that position??? I mean, everything was discussed and confirmed in the office before we started the reno works. I understand that sudden 3rd party involved is never easy (or I should say 4th party involved) & even let them decide there and then to change whatever they want. I know that this is my job & I will have to be 101% patient & try to fulfill their requirements as much as possible. Actually, I really think that you & your wife including her family do not not trust us at all, since you mentioned that you trust us!! Quote - 6 Apr With regards to selection of tiles ; the tile showroom that we brought you to is about 25,000 sqft! I would like to emphasize here that you want me to be as detailed / transparent as possible & you mean you dont know that from the begining my quote for the tiles is at $3psf? The cost of the tiles were specified in the very 1st quote! During our discussion, we agreed to have a top up if any tiles cost more than $3. Its very reasonable in this market. I am someone that will not take extra amount which is not mine. Just like I transfered the extra $300 which you overpaid to your bank a/c before CNY. Till date, I still want to maintain my trustworthiness & keep our responsible reputation. Plumbing issue : Yes, you were supposed to have a site briefing together with our plumber, but you were so late that my plumber had to go ahead first as they have to rush to another job site after yours. As for taking away anything from the bathroom, I really wonder how much would our plumber earn after taking away those existing pvc pipes to sell or to re-use? maybe 10 cents or 20 cents? I wonder abt the current value of pvc pipes! I thought everything went well when I rec'd your sms to say the plumber did a very good job, I was so relieved to hear that. But why are you making sure a comment here??? As for the water valve, I really do not know why it suddenly cracked. Everyone, pls figure out, we checked every connection for leakage during hand over (last day), yourself, your wife & I together with the plumber agreed that everything was completed & was done to your satisfaction and then you made the last payment.. I really doubt that you will pay me if the works were not completed. Morever, you & Lynn did a thorough check infront of us & I'm sure you had done your inspection as well. After all, I think is a small misunderstanding. Regards to the changing of the base wood of the vanity. I never say no to your requested & had changed it immediately & its at my own cost. Quote - 6 Apr from chris to brightred I'm very glad that you went to the wall paper company directly because it will become their liability. You will then understand that you had to do all co-ordination & be prepare for any other hiccups. We often get into trouble with the wall paper company when they failed to do a proper job or irresponsible applicator which then indirectly damage & affect our reputation. It become our costing if the wall paper company not going to rectify any faults which they seem accpetable. In these scenario, we had to engage another applicator to rectify at our own cost. With regards to your own electrician & Aircon man ; I really had a very very hard time to chase after you everyday for a date from your own contractors. As I had mentioned during the 1st day briefing before letting your wife sign the schedule that we have to stick accordingly to our schedule as its the peak season before CNY. My schedule stated very clearly on which day & when should your own contractor work. To my surprise, you didn't even bother to inform me that your own contractors could not make in time. In the end, I have to redo & at my own cost for something that its not my fault. I think you forgot again ! The top up you make is as per my sms , is for the L-box depth that you want. I couldn't complete your reno as per schedule just becos of your contractors again & again delay & can't even fix a date. Do you know its hard for me to book my other group of workers & I had to changed the timing again & again as I need to book them 1 week in advance as explain to you through sms. Just like to share with you, that I almost got into depression due to your project but I fully understand that I had to fulfill my job no matter how tough it will be. If I'm just anyone (sales designer) I think I will be the first to resign & just escaped from it. But I didn't do that & still serve you with my best. Quote - 7 apr I really tried my very best to be as cautious as possible as I know your expectation & we agreed everything to be black & white. As everytime you will tell me its ok but things don't turn up to be that way.. Just like you mentioned in your sms to me that you were SATISFIED with the GOOD JOB DONE BY OUR CARPENTER. Didn't know that you have a different view now! Dear Chris, if you are not satisfy with our job, pls come directly to me/my company, we will definitely do up whatever the defects are. We are not someone that will try to escape. Based on my responsibility & reputation of company, we are definitely looking into long term business. But due to your comments, it will definitely put us on a stage higher to view from higher & different perspective. I'm not trying to win any sympathy votes from anyone. I just hope that everyone here will understand from my position. I would not dare to say that everybody here must share the same view but I just want to explain the whole story from my side so that everyone will have a clearer scenario. Please kindly think back : Will I do something like what he say to spolit my reputation? I don't think so rgt... ... Please do not hesitate to contact me @ hp : 96868 050 should anyone have doubts in any issue... Tks for the listening ear Once again, pls do not hesitate to look for me instead of badmouthing, slandering & personal attack me behind my back. As I will not hesitate to take legal action.
-
The Interior Place
pro2 replied to LGG's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Hi Chris & everyone First of all, I would like to thank my faithful & loyal client to inform me of this forum that is circulating about me & my company. I'm really very thankful to those out there as my supporting customers. I am Candy, manager & also one of the director from The Interior Place. I am very new to this kind of forum & in fact this is my first time reading it but I have heard about this forum & never have the time & chance to read. Very sad & disappointed to see what Chris had badmouth about me. After all I have been in this industry for 11 years, this is the 1st time I come across this type of issue. Since you've all heard his version & now I would like to explain my version (instead of just listening to his side of the story... ...) Since I want to be true & transparent so there's some words which you might not like to hear. Jus hope for your understanding.... Quote - 5 Apr As you mentioned, you came to me because someone RECOMMENDED us to you & you ARE IMPRESSED by our workmanship. Lets begin with the 1st day of reno : I specified to you & your wife that both of you must be around on the 1st day of work for job briefing but you were not able to be around and left my tiler and myself including my electrician to run through the details with your father-in-law, your wife & her brother. Under normal circumstances, it should be ok but somehow things do not turn out to be. Maybe you are not aware how they changed the entire layout during the briefing.. Can anyone imagine when all tiles have been already been sent to the jobsite & just because of certain comments made by a 3rd party, everything has to be changed right down to the selection of tiles and even scolded me "stupid" for suggesting a certain layout... That certain 3rd party kept questioning why this have to be in this position & why that has to be in that position??? I mean, everything was discussed and confirmed in the office before we started the reno works and on the 1st day of work, everything was changed after certain comments were made.. I understand that sudden 3rd party involved is never easy (or I should say 4th party involved) & even let them decide there and then to change whatever they want. I know that this is my job & I will have to be 101% patient & try to fulfill their requirements as much as possible. Actually, I really think that you & your wife including her family do not not trust us at all, since you mentioned that you trust us!! Quote - 6 Apr With regards to selection of tiles ; the tile showroom that we brought you to is about 25,000 sqft! I would like to emphasize here that you want me to be as detailed / transparent as possible & you mean you dont know that from the begining my quote for the tiles is at $3psf? The cost of the tiles were specified in the very 1st quote! During our discussion, we agreed to have a top up if any tiles cost more than $3. Its very reasonable in this market. I am someone that will not take extra amount which is not mine. Just like I transfered the extra $300 which you overpaid to your bank a/c before CNY. Till date, I still want to maintain my trustworthiness & keep our responsible reputation. Plumbing issue : Yes, you were supposed to have a site briefing together with our plumber, but you were so late that my plumber had to go ahead first as they have to rush to another job site after yours. As for taking away anything from the bathroom, I really wonder how much would our plumber earn after taking away those existing pvc pipes to sell or to re-use? maybe 10 cents or 20 cents? i wonder abt the current value of pvc pipes! I thought everything went well when I rec'd your sms to say the plumber did a very good job, I was so relieved to hear that. As for the water valve, I really do not know why it suddenly cracked. Everyone, pls figure out, we checked every connection for leakage during hand over (last day), yourself, your wife & I together with the plumber agreed that everything was completed & was done to your satisfaction and then you made the last payment.. I really doubt that you will pay me if the works were not completed. After all, I think is a small misunderstanding regards to change the base wood of the vanity. I never say no to your requested & changed it immediately & its at my own cost. Quote - 6 Apr from chris to brightred I'm very glad that you went to the wall paper company directly because it will become their liability. You will then understand that you had to do all co-ordination & be prepare for any other hiccups. We often get into trouble with the wall paper company when they failed to do a proper job or irresponsible applicator which then indirectly damage & affect our reputation. It become our costing if the wall paper company not going to rectify any faults which they seem accpetable. In these scenario, we had to engage another applicator to rectify at our own cost. With regards to your own electrician & Aircon man ; I really had a very very hard time to chase after you everyday for a date from your own contractors. As I had mentioned during the 1st day biefing before letting your wife sign the schedule that we have to stick accordingly to our schedule as its the peak season before CNY. My schedule stated very clearly on which day & when should your own contractor work. To my surprise, you didn't even bother to inform me that your own contractors could not make in time. In the end, I have to redo & at my own cost for something that its not my fault. I think you forgot again ! The top up you make is as per my sms , is for the L-box depth that you want. I couldn't complete your reno as per schedule just becos of your contractors again & again delay & can't even fix a date. Do you know its hard for me to book my other group of workers & I had to changed the timing again & again as I need to book them 1 week in advance as explain to you through sms. Just like to share with you, that I almost got into depression due to your project but I fully understand that I had to fulfill my job no matter how tough it will be. If I'm just anyone (sales designer) I think I will be the first to resign & just escaped from it. But I didn't do that & still serve you with my best. Quote - 7 apr I really tried my very best to be as cautious as possible as I know your expectation & we agreed everything to be black & white. As everytime you will tell me its ok but things don't turn up to be that way.. Just like you mentioned in your sms to me that you were SATISFIED with the GOOD JOB DONE BY OUR CARPENTER. Didn't know that you have a different view now! Dear Chris, if you are not satisfy with our job, pls come directly to me/my company, we will definetly do up the whatever defects. We are not someone that will try to escape. Based on my responsibility & reputation of company, we are definetly looking into long term business. But of course our company 1st case by you will definetly put us a stage higher to view from higher & different perspective. I'm not trying to win any sympathy votes from anyone. I just hope that everyone here will understand from my position. I would not dare say that everybody here must share the same view but I just want to explain the whole story from my side so that everyone will have a clearer scenario.