Atrina-er
Members-
Content Count
8 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout Atrina-er
-
Rank
Member
Previous Fields
-
Gender
Male
-
My Done-up Curtain 2/6/08 From Malaysia
Atrina-er replied to flyersummer's topic in RENOVATION WORKS
Hi flysummer, can u pm mi e contacts?? tks... -
Hi, anybody can let me koe the market rate for Bomb shelter feature wall w laminate finish. mine is approx around 6 1/2ft. tks.
-
GPlan
Atrina-er replied to admin's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Hi, can I have Kelvin's contacts as well. tks.. -
Hi, I've juz got tis quote from an ID firm for my 4 RM Prenium flat ( 90 sqm ). Is it reasonable??? Miscellaneous Works 1. Painting all internal wall & ceiling using NIPPON/ICI - $1200 2. Supply & lay floor protection for 03 x bedrooms - $90 3. provide acid washing for whole unit tiled area - $150 4. General washing of whole unit upon handover - $60 5. Supply & install aluminum window grilles for Service Yard - $180 6. Supply & install sandblasted top hung sliding dr for - $890 kitchen entrance Ceiling works 1. Supply & install L Box est 60ft length for living room - $360 2. Supply & install L Box est 50ft length for MBR - $300 3. Supply & install est 40sqft False Ceiling for Foyer area - $100 4. Supply & install est 60sqft FAlse Ceiling for MBR - $150 Plumbing Works 1. Supply & install new stainless steel/copper piping for - $550 kitchen & 02 x WC 2. To connect inlet/outlet point for 02 x basin - $60 3. To connect inlet/outlet point for sink - $30 4. To connect inlet/outlet point for washing machine - $30 Carpentry Works 1. Fabricate & install 6 1/2ft length feature wall for - $1200 Bomb Shelter 2. Design & construct 20ft kitchen cabinet with solid top - $2100 Total - $7450 Additional 1. Supply & lay lighting wiring point with casing per point - $30 2. Supply labour to install lighting per point - $8 3. Supply & lay single socket power point with - $45 casing per point 4. Supply & lay double power point with - $60 casing per point 5. Supply & lay heater point with casing per point - $100 6. Supply & lay Air con point with casing per point - $100 * GST waived.
-
Hi, I've juz collected the keys 2 my pad last wk. Found some scratches on the timber floor in my bedrooms. May I koe how 2 remove them? Can I ask HDB 2 rectify them?? Oso how shd I check if my floor tiles r even?? will appreciate any tips...
-
Housing Loan
Atrina-er replied to Atrina-er's topic in Renovation Contractors, Interior Designers & Suppliers Reviews
Sorry, I meant renovation loan..