I wanted vinyl flooring for my kitchen, living hall and bedrooms. My cement screed was done at a lower height, shortage abt 7mm - 10mm from my kitchen existing tiles. I was unable to have my vinyl levelled between kitchen and living hall. They have to put on an pvc cap between kitchen and living hall. Is there anyway to fix this? I was expecting the whole flooring to be of the same level.