  1. Depends on material..... the better ones more costly lor. Check your PM.
  2. Horizontal bars cos compromise between view and security/safety. At least the view is not totally blocked with horizontal bars. Yes, 6 this month.
  3. 1.3k for dinning and 3 bed rooms curtains, day and night. Only Dinning and MBR using full length curtain, the other bed rooms about 3/4 length. Didn't do roller blinds cos find it too office like.
  4. I think my MBR is completed; Roman binds at WIW: King size bed: Curtain, greenish gold, need to get double side tape to stick the curtain holder to feature whole: Fostered glass panel to conceal bed from outside: Living hall, fish tank still in progress of setting up;
  5. ya... will be seeing u around. last night my family went down stair to watch ge tai....been 10 years since i last watch it. really something new for my kids. only LPG lah... the seller BS.
  6. Congratulation neighbour. Just curious how much is the val and any cov? L10?
  7. Have you consider contractor, check out my reno t-blog ...
  8. Jessie... i think your common toilet WC is where my shower area is. That's the only difference.
  9. Screw up design. 20+ years ago don't have private developer to design for HDB so got to live with it lor.
  10. Oh, the other thing, my ceilings are higher.
  11. Cos i hacked all tiles, if overlay it will be 4 inches less, so u have to check if the ex-owner got overlay or not. Besides, Zhi Seng tidy up the pipping making more space, that's probably why it looks bigger.
  12. Is this is original layout of your EM? Ya... have to settle in fast cos my elder daughter BD coming very soon.
  13. Normal one but 10mm thickness, so should be able to take a bit of "soft" knocking.
  14. Hood is useless, from past experience we still need to clean up the kitchen after cooking, the hood doesn't work in my case so this time round we decided to do without it. So far so good, the glass panel is able to prevent splashes but it does get oily and requires cleaning after each session. Actually i wanted a full height glass panel but my contractor said it will make cleaning difficult so in the end only about 1 m tall.
  15. It would be much better if the common toilet bowl and vanity top can switch position. That means your shower area is facing the entrance?
  16. Stair light: Dinning light, curtain not up yet: Common toilet: Master bed room toilet:
  17. Kitchen is considered done: India Black Galaxy granite is finally up: A clear glass is installed between the hob and washing machine. Awning and aircon:
  18. I have done the following: 1.To supply & install roof-tile roofing at balcony with waterproofing membrance. ( Use anti-termites and waterproofing chemical paint to vanish timber ) 88sqft 2.To supply & install aluminium casement window at balcony(white P.C) 46.4sqft 3.To supply & install aluminium sliding window grilles at balcony(white P.C) 46.4sqft 4.Supply, hack & lay new homogenous floor tiles & wall tiles up to ceiling for master bathroom complete with waterproofing membrance 5.Supply, hack & lay new homogenous floor tiles & wall tiles up to ceiling for common bathroom complete with waterproofing membrance 6.Supply, hack & lay new homogenous floor tiles & wall tiles up to ceiling for washroom complete with waterproofing membrance 7.To supply & construct shower kerb for Master bathroom. 8.To supply & construct shower kerb for common bathroom. 9.Supply and install shower screen at MBR bathroom. 10.Supply and install shower screen at Common bathroom. 11.Supply and install tempered glass door for MBR entrance. 12.Kitchen Aluminium grilles with white power coated ( 30sqft ) 13.To supply & install 25.5ft long kitchen cabinet in laminate finish. 14.To supply and install 1 pcs sand blasted glass door for kitchen cabinet. 15.To supply and installl stainless steel dish tray for kitchen cabinet. 16.Supply and install Granite kitchen top 14.2ft ( India Black Galaxy ) 17.Supply, hack & lay new homogenous floor & wall tiles up to ceiling for kitchen complete with waterproofing membrance 18.To supply and construct cement base for kitchen cabinet,fridge and washing machine. 19.To supply labour and material to change stainless steel piping for kitchen and 3 bathrooms. ( cold ) 20.To supply labour & material to run washing machine and sink inlet/outlet pipe. 21.To supply and install white powdered-coated Aluminium BI-fold door for 1 bathrooms. 22.To supply & install aluminium sliding window grilles at MBR (White P.C) 23.To supply labour & equipment to polish existing marble flooring at 1st level (excluding utility, balcony and kitchen) 24.To supply labour & equipment to varnish existing parquet flooring at 2nd level Matt finishes. 25.To supply labour & paint to paint whole house wall ,door and water piping. 26.To supply & install top hung sliding door c/w wooden frame and glass panel. 27.Supply and install tempered glass panel at the MBR bedside. 28.Supply and install 7 ft long wardrobe with aluminium frame and glass panel at MBR 29.Supply and custom-made full height wooden panel feature wall at MBR 30.Supply and install wooden shelving with laminate finish for MBR TV. 31.Supply and install 2 x 2.5ft vanity top c/w solid plywood and laminate cabinet at both bathroom 32.Supply and install clear glass panel at kitchen stove 33.Supply and install 4 ft TV console **** area 34.To hacking and dispose of kitchen wall and floor tiles. 35.To hacking and dispose of all bathrooms wall and floor tiles. 36.To dismantle and dispose of existing kitchen cabinet / sink support. 37.To dismantle and dispose of existing both bathroom pedestal pans. 38.To dismantle and dispose of existing both bathroom wash basins. 39.To dismantle and dispose of both bathroom door frames. 40.To supply labour to install 2 sets pedestal pans and wash basins. 41.To supply labour to install storage heater 42.To supply labour to install 2 sets toilet accessories. 43.Application of HDB permits. 44.Lay protection sheet for flooring. 45.Chemical washing for whole unit flooring. 46.Haulage and debris clearance. Electrical wiring and aircon are not in the list cos i deal with his contractors directly.
  19. Yes, they do deliver what they promised. I'm satisfied with their workmanship and they are fast in rectifying problems I highlighted to them. I agreed that he is really busy. He told me on average he has got 4 to 6 projects each month(only him not the whole of Zhi Seng) and work till mid night everyday. Anyway good luck to your coming renovation.
  20. U didn't miss cos i didn't post. Johnson quote me 35.8k.
  21. Yes, the parquet at the staircase has been varnished and the the stair railing has been given a fresh coat of paint.
×