Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

redknapp39

Members
  • Content Count

    213
  • Joined

  • Last visited

Everything posted by redknapp39

  1. U've made the right choice. I've seen my MIL house reno and I'm glad Roy is not like their contractor/ID. That contractor/ID planning was not up to standard, time management skills sux and he didnt even prepare any eqp when he wanted to do the reno. Imagine asking the home owner for a ladder or chair or screw driver so that he can do some work. What crap. Family fren some more. Nevertheless, have faith in Roy. He may seem busy but he'll make sure ur house is done sui sui!!!
  2. U can meet him elsewhere. Unless u need to do some finalisation of plans. I've PMed u his contact.
  3. Thx!!! All the best for ur reno!!!
  4. Hi bubble-ling, remember me. The guy with the same house layout as urs. Chk out my blogspot for latest pics. Enjoy nasir-liza-reno.blogspot.com
  5. Finally, pics of my home are up. Credit must go to Roy (Inzen) for making our home a beautiful one!!! Chk them out on my blogspot, nasir-liza-reno.blogspot.com or simply click on the link => OUR HUMBLE ABODE for more pics.
  6. Finally, pics of my home are up. Credit must go to Roy (Inzen) for making our home a beautiful one!!! Chk them out on my blogspot, nasir-liza-reno.blogspot.com or simply click on the link => OUR HUMBLE ABODE for more pics.
  7. I'll update my pics soon. Been busy with work, fasting and Hari Raya celebrations.
  8. Hi buble-ling! It is interesting to note that we have exactly the same floor plan! But my unit is slightly smaller though, 124sqm. You can check out my blog below to see more. I was also as excited as you 4 months back, hehe...now I've moved in already but haven't had the time to update and post pics of my inhabited house. Enjoy the whole reno process!
  9. Finally move in last Sat. Wife n me were **** excited. Finally, we get to have our own home. Freedom. Hee hee. Stay tune for more pics. Cant access internet from home cuz i dun have a CPU or laptop up yet. Hopefully, we'll get the CPU from Sim Lim by this weekend.
  10. Hey skywolf, the door on the right is my MBR door. I shifted it there because I extended the bedroom next to it to make study and WIW. Thanx, babytan! Roy really didn't disappoint me. Hi dtft, I've PM you.
  11. hehe...initially we were thinking og doing the pole system too but in the end decided with the normal type of wadrobe.
  12. Thanx, virgo! Ya, a lot of carpentry. When I came to see house last week, Roy's carpenters were hogging both lifts, haha...had to wait for about 15-20 mins for them to bring up all the carpentry stuff before I could go up. Thanx, smartfool! haha...copy lor. it was roy's idea actually.
  13. Study (display shelves going to have mirror behind and wall where table and lights are going to be pasted with full height wallpaper) Living room feature wall & balcony (the uncovered part of the feature wall is going to be pasted with wallpaper) Passage to kitchen (feature wall cum store on the left, mirrors on the two empty panels yet to be installed) Kitchen Passage from kitchen View from entrance of store with tic-tac door opened Full height storage unit on the left of store Full height storage unit on the right of store Dining window grills Door cum entrance to WIW WIW from entrance WIW from the side of window nearer to the door WIW from the side of window further from the door Mirror on the other side of door Everything turns out the way we want except for some minor things that are definitely rectifiable. Oooh...and the doors to the 2 bedrooms can't close properly. So we have decided to change all the doors. Which means more damage, heh. I simply can't wait to move in! My long wait for carpentry is definitely worth it! 3 thumbs up for Roy!
  14. Hey kopitehc, Nice house you got there. My wife likes ur dresser drawer thing. I guess it's a girl thing, huh?
  15. Hi everyone. Carpentry is 90% done. So far, very satisfied with the workmanship. And the turnout is as per what we want. The house is starting to feel so cosy that I didn't feel like going home when I went there yesterday. Anyway, here are the pics. Enjoyz. Main door and gate View of study from the entrance. black glass going to be installed in that rectangular space. View of shoe cabinet on the right of entrance Front view of shoe cabinet and satee
  16. Never too late to start a T-blog
  17. More pics posted on my blogspot, My Humble Abode. Get ready for more pics on carpentry tom after i've visited my home today.
  18. Same here. Hopefully, my carpentry will be good.
  19. Skywolf, take more pics of ur house la. I want to see more
  20. Here u go: Kong Tai 65658924/65658970 Blk 504, Jurong West St 51, #01-221
  21. Welcome to the Inzen Club!!!
  22. It's something i regret telling him. Anyway, I've already set a deadline for him to handover the house. Think i may not even be able to move in b4 Hari Raya. I got reservist till 20 Aug. Wife will be busy during Sept holidays. Then, during fasting month, where got so much energy to shift so many stuff from Jurong (my parent's place) n Bedok (my in law's place). Sian. Super sian
  23. aves, Aiyah, just mix n match all the ideas from various IDs. It's ur house anyway. By the way, u can drop by to see the tiling, plumbing and electrical work. If u're not convinced, just drop by again the following week. I can show u my place myself. But must go on Sat or Sun. I got reservist till 20 Aug. Wont be free on weekdays. dtft, It's normal. I also had to wait for my revised quotation for more than 2 weeks. All i can say is Roy is very busy. If u really want him to do ur house, u have to be patient.
  24. Im in no rush to move in. So i told Roy to take his time
×