Alphard
Members-
Content Count
2 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout Alphard
-
Rank
Newbie
Recent Profile Visitors
The recent visitors block is disabled and is not being shown to other users.
-
Hi there , need advice from everyone. Millions thanks . My house is 4room resale , floor area is 950sf +- . Got a quote from my friend contractor. Is it the quote reasonable? Millions thanks again . Hacking 1 . Supply material and labour to hack floor and wall tiles for whole unit. 2 . Supply material and labour to hack sink support. 3 . Supply material and labour to remove kitchen cabinet and room wardrobe. 4 . Supply material and labour to hack wall for store room. 5 . Supply material and labour to hack door frame for store, 3 bedroom and toilets. 6 . Supply material and labour to hack kitchen entrance wall . 7 . Supply skip tank and remove rubbish. 8 . Supply material and labour to remove unwanted cornices. Item 1 to 8 $3000 . Wet works 1 . Supply material and labour to lay cement screeding and smooth cement plastering for living and 3 bedroom flooring $2000 . 2 . Supply material and labour to lay floor waterproofing for kitchen and 2 toilet $100 . 3 . Supply material and labour to make good damage cement wall ( hacking area) $200 . 4 . Supply material and labour to lay cement screeding with floor and wall tiles for kitchen and 2 toilet $5400 . 5 . Supply material and labour to construct base for washing machine and cabinet $250 . 6 . Supply material and labour to construct 3 room door frame $450 . 7 . Supply material and labour to replace new Dustbin $150 . Plumbing works 1 . Supply material and labour to install s/steel piping ( hot and cold ) for kitchen and 2 toilet $1200 . 2 . Supply labour and tool to install 2 sitting bowl , 1 wall hung basin and 1 vanity basin $350 . 3 . Supply labour and tool to install 2 instant heater, 2 rain shower set and accessories for 2 toilet $200 . Plastering/ painting 1 . Supply material and labour to plaster wall and ceiling for whole unit $2500 . 2 . Supply material and labour to paint wall and ceiling for whole unit with Nippon 5000 emousion paint $1000 . Rewiring 1 . Single power point x 3 $150 . 2 . Double power point x 10 $550 . 3 . Data point x 2 $160 . 4 . Lighting point x 12 $360 . 5 . Heater point x 2 $180 . 6 . Fix light x 12 x $180 . Vinyl flooring 1 . Supply material and labour to lay 5mm vinyl tiles with skirting for living hall, 3 bedroom and kitchen ( top up area ) $2800 . Door 1 . Supply material and labour to install Soild laminate door for 3 bedroom with lever lock set $750 . 2 . Supply material and labour to install fire rated Soild laminate door for main entrance with lever lockset $650 . Carpentry works 1 . Supply material and labour to install 30’ top and bottom cabinet, pipe box up cabinet, build-in fridge cabinet , dish tray cabinet with glass door, internal with color pvc laminate, abs door trimming , soft closet and 1 roll drawer with laminate finishing $3300 . 2 . Supply material and labour to install 6’ sliding door wardrobe for 3 bedroom $4320 . Quartz top 1 . Supply material and labour to install 10’ quartz table top for kitchen cabinet $850 .
-
Hi there , need advice from everyone. Millions thanks . My house is 4room resale , floor area is 950sf +- . Got a quote from my friend contractor. Is it the quote reasonable? Millions thanks again . Hacking 1 . Supply material and labour to hack floor and wall tiles for whole unit. 2 . Supply material and labour to hack sink support. 3 . Supply material and labour to remove kitchen cabinet and room wardrobe. 4 . Supply material and labour to hack wall for store room. 5 . Supply material and labour to hack door frame for store, 3 bedroom and toilets. 6 . Supply material and labour to hack kitchen entrance wall . 7 . Supply skip tank and remove rubbish. 8 . Supply material and labour to remove unwanted cornices. Item 1 to 8 $3000 . Wet works 1 . Supply material and labour to lay cement screeding and smooth cement plastering for living and 3 bedroom flooring $2000 . 2 . Supply material and labour to lay floor waterproofing for kitchen and 2 toilet $100 . 3 . Supply material and labour to make good damage cement wall ( hacking area) $200 . 4 . Supply material and labour to lay cement screeding with floor and wall tiles for kitchen and 2 toilet $5400 . 5 . Supply material and labour to construct base for washing machine and cabinet $250 . 6 . Supply material and labour to construct 3 room door frame $450 . 7 . Supply material and labour to replace new Dustbin $150 . Plumbing works 1 . Supply material and labour to install s/steel piping ( hot and cold ) for kitchen and 2 toilet $1200 . 2 . Supply labour and tool to install 2 sitting bowl , 1 wall hung basin and 1 vanity basin $350 . 3 . Supply labour and tool to install 2 instant heater, 2 rain shower set and accessories for 2 toilet $200 . Plastering/ painting 1 . Supply material and labour to plaster wall and ceiling for whole unit $2500 . 2 . Supply material and labour to paint wall and ceiling for whole unit with Nippon 5000 emousion paint $1000 . Rewiring 1 . Single power point x 3 $150 . 2 . Double power point x 10 $550 . 3 . Data point x 2 $160 . 4 . Lighting point x 12 $360 . 5 . Heater point x 2 $180 . 6 . Fix light x 12 x $180 . Vinyl flooring 1 . Supply material and labour to lay 5mm vinyl tiles with skirting for living hall, 3 bedroom and kitchen ( top up area ) $2800 . Door 1 . Supply material and labour to install Soild laminate door for 3 bedroom with lever lock set $750 . 2 . Supply material and labour to install fire rated Soild laminate door for main entrance with lever lockset $650 . Carpentry works 1 . Supply material and labour to install 30’ top and bottom cabinet, pipe box up cabinet, build-in fridge cabinet , dish tray cabinet with glass door, internal with color pvc laminate, abs door trimming , soft closet and 1 roll drawer with laminate finishing $3300 . 2 . Supply material and labour to install 6’ sliding door wardrobe for 3 bedroom $4320 . Quartz top 1 . Supply material and labour to install 10’ quartz table top for kitchen cabinet $850 .