Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Anz85

Members
  • Content Count

    6
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Anz85

  • Rank
    Member

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Thanks sir... Really appreciate.. Called hdb yesterday.. we "the buyer" will settle the bomb shelter issues n need to pocket out by our own as we cannot afford to wait for the seller ex husband staying the house to drag anymore time.. we got 2 kids n cramping in a super small room queen size bed with 2 adult n 2 kids sleeping.. As per HDB... If the seller fail for the inspection.. they will continue to extend the date... Which is rediculous for us.. extend whole year we the "buyer" faint.... HDB should imposed fine or penalty for this type of seller seriously.. they must feel the pinch... Haiz.. they can just move on without any issues.. where my whole family now hang dangling for the last min.. Lucky HDB accept my proposal to give me settle the bomb shelter issues... But now is my butt on fire..
  2. Hi.. does anyone knows where to get contractor to reinstate the whole set of metal ventilation for bomb shelter?? Just 1 will do.. I don't really know whether only the plate missing or the whole set the ex owner remove.. so I prepare for the worst which will be whole set.. Unfortunately for us that we just get to find out last minute from hdb as we checking on our appt time as only left 4 days and we are wondering why no text or letter from hdb.. As per hdb, the 6 years old resale flat we buying got inspection issues on the bomb shelter ventilation which they cover both the 2 holes... The seller (the ex husband) dragging the time n requires extension for the contractor to reinstate.. Our take over date is 3rd December 2018.. the seller (ex husband) seems to be "Bo chap".. and we really need the house on 3rd December 2018... 
  3. Hi.. does anyone knows where to get contractor to reinstate the whole set of metal ventilation for bomb shelter?? Just 1 will do.. I don't really know whether only the plate missing or the whole set the ex owner remove.. so I prepare for the worst which will be whole set.. Unfortunately for us that we just get to find out last minute from hdb as we checking on our appt time as only left 4 days and we are wondering why no text or letter from hdb.. As per hdb, the 6 years old resale flat we buying got inspection issues on the bomb shelter ventilation which they cover both the 2 holes... The seller (the ex husband) dragging the time n requires extension for the contractor to reinstate.. Our take over date is 3rd December 2018.. the seller (ex husband) seems to be "Bo chap".. and we really need the house on 3rd December 2018...
  4. Hi.. I bought resale... Completion on December... May I know for Jade spring, hdb provide it with rj45 cat5e or rj11 telephone wire?
×