Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Dracula

Members
  • Content Count

    366
  • Joined

  • Last visited

Everything posted by Dracula

  1. hi mi lor, Very nice curtains u got there! Ware u got ur curtains from? are they roman curtains? how much u got it for ah?
  2. Nice and long kitchen layout ah..... Wah if you hack down bedroom 2 and main bedroom.... Woooo.... Big! But not many will sacrifice the space ah. I like your house layout Good luck in space management.
  3. He will sure forget, but his accounts girl will chase him for it when its time to... Hehe... I wish too ah
  4. Yeah... but he is getting old too... always seem to forget stuffs. Haha....
  5. Thanks euphobear, Haha... yeah man... He is also doing hotel reno now, so his schedule kind of pack. Even my 40% before commencement also forgot to collect till recently.
  6. Today they did the whole house tile and skirting already. They re-cut the curved tile again. Now it is perfect Living Room Tiles & Skirting all Done! Master Bedroom Wall all Done! I wonder whats next....
  7. Hi, Yeah the cement screeding is done by HDB for laminate flooring, which is in my bedrooms only ah. For tiles, i think they got to apply a base coat first then apply another thin coat to stick onto the present cement base. Anyway it could be wrong too Yeah the tile was quite difficult to cut from what i have heard from my ID. But then my tile was cut wrongly, it was suppose to be more curvy. So the poor tiler got to cut again till the correct angle is formed My Foyer Tiles Living Room Tiles Complete Next should be either painting or aircon installation already.... Stay Tuned
  8. Mine was supposed to be 04.06.08 9am - 1pm. But i changed it to 14.06.08 because my place still under renovation ah. They will be here this week then will be back again 2 weeks later, thats wat they told me ah.
  9. Hi jacky, Think it must be me which is fussy and wants all to be curvy instead of sharp edges ID was scratching head for a few days before committing if he can be able to process what i wanted... Hehe... Hopefully all turns out well. I am also looking forward to the end product Thanks groovygenie! My ID is like a friend to me... We can chit chat on anything and will he will discuss with me if any problem comes up so that it can be resolved. Most important is you must be able to communicate well and trust what your ID can provide for you. Thats what i think ah. Hehe... Yeah mine was done with cement first then lay the tiles. Cant comment on which is better, guess it must be each tiler have their own methods of doing it ah.
  10. Haha... yeah man. It was not easy to have a curved tile. I did not see them cut the tile, but it must have took them very long to cut them. groovygenie, The curve tile is to accommodate my curved feature wall which took us quite some time planning it out The remaining blank space beside the bomb shelter will be glued pebbles below the feature wall Hopefully all turns out well. My ID is very patient and was there most of the time to co-ordinate the important details.
  11. Yesterday my tiles were about 50% up! Living Room Floor Tiles Kitchen Cement Base Kitchen Cabinet Wall Tiles I forgot to take photos of the foyer tiles... will post it up again tomorrow Thats all for now!
  12. Yeah sure! Next week will only have ceilings and floorings.... so nothing much to see yet. Got to wait till 3rd week of june then the carpentry starts to come in... hopefully
  13. Yeah hopefully ah. my walk-in-wardrobe is just beside the toilet, thats why need to remove the moisture as much as possible before my clothes get moldy That is if i remember to on the switch too... Hehe...
  14. Hi Vlanze, Welcome Welcome to the forum I am also from the Feb 08 bi-monthly. Did you get the upper or lower floors? I am also from 79E. If you followed the units closely, you should know which floor is mine. Hehe.... Happy sourcing for ID's and shopping for home stuffs
  15. Yeah thats what i did to the wiring too. It went straight to the heater switch The diameter of the fan is 8" if i did not remember wrongly.
  16. I got it from Jasmine @ Central Aluminium. My ID quoted me around 200+ too but some unknown brand, so i did not take it and source it from another forumer. If you want the contact can PM me
  17. Haha... ok sure The 3-D Drawing is out but it is not to our expectations yet, so will post it up once its amended
  18. After the wall was hacked! The Floor was hacked at the same time Tomorrow is the day my flooring will be up! Yeah!
  19. Hi ryuki, The KDK fan include installation is $214 nett
  20. Hehe... I also watching now. but the DVD not the TV. As the episode progress, it is quite interesting
  21. Meowie, the method u mentioned is correct. I got it mixed up. Hehe... Sorry ah....
  22. Congratulations! Its a new beginning
  23. Yeoman, You are right. 2 way switches will always be opposite each other. So if Switch A is in the "on" position, then Switch B will be in the "off" position. if both are in the "on" or "off" position, it means that the light is on and not off. Hope it helps
  24. Ceiling is almost done. Living Room Ceiling is done! Next would be the wall hacking and flooring
  25. Strange enough, my unit or block is not under Ms Siti but under Mr Ng. My ID also finds it weird. My MBR wall is going to be hacked to merge with bedroom 2 ah. Otherwise its too small to even move around ah. Yeah, we got the exact same floorplan. Thats why i wanna see how your aircon piping is run and your layout too
×