Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Yy2008

Members
  • Content Count

    22
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Yy2008

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Female

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. @love4040 @Jagan Augustine can you see my reply above? There is error when I posted the reply
  2. Hi all, sorry I have been stopped updating here as I thought there is no ppl interested in.. Here i will just summarize my renovation experience with Jaden from Exqsite. Renovation started early May and ended mid June. About 7weeks in total. Overall cost is 50-55k for tiling, carpentry, electrical and plumbing work, false ceiling, painting, window grill, 3 sliding doors (1 for kitchen, 2 for bathroom), demolish wall between kitchen / dining and make it a window, and some cleaning works. We moved in on 30 June. So far so good. Friends that visited us commented great workmanship and worth the value. About the ID Jaden. I think he is a professional and reliable ID. For me, his strength is approachable and fast response, great work organising and clear + precise in answering questions. I just relied on him on almost everything. The one that I needed to do my own homework is the design. Somehow Jaden’s design was abit “standardised” for me so I had to describe my requirements as much as possible and provided ideas copied from Pinterest or google and he is quite accommodating. Haha and here is the outcome! Hope that this info is useful for you guys! All the best in your renovation journey!4 living room Dining area Master bedroom Common room 1 common room 2 Kitchen toilet
  3. Tiling wiring and false ceiling done!
  4. Change the laminate Color of bedroom 1 to a brighter one. So looking forward!
  5. Got the 3rd revision today. Change the wardrobe in room 1 to box cabinet around window. Everything looks fine for me now. Time to decide the paint Color. Can’t wait to see the real outcome!
  6. Tiling started last Tuesday 8May. Went to have a look on Friday evening and this is how it looks. According to the tiler, tiling could be done by 17May.
  7. Received 2nd revision of 3D drawing from my ID last Saturday 28Apr. The theme of the living room and kitchen is just.....not so right but I can’t tell what’s wrong with it..seemingly we need a good talk with our ID.
  8. Got our first 3D drawing from my ID yesterday. We selected light blue+yellow because I wanted the feel as shown in picture below. But it seems challenging to carry such combi unless we add in more details just like what the picture showing. Might give up this combi and go with woody theme for safety sake What I had in my mind 3D drawing of entrance 3D drawing of living room 3D drawing of study area 3D drawing of kitchen 3D of MBR 3D of room 1 3D of room 2
  9. The progress is managed nicely! Mind to share the outcome?
  10. Collected key yesterday finally! Went for defect check with our ID Jaden from ExQsite. Will share my renovation journey here accordingly. Hope everything goes smoothly! living room Bedroom 1 Bedroom 2 Masterbedroom kitchen Service yard
  11. Was searching for ID and found this company ExQsite interior design quoted very good price. Visited their showroom. The workmanship looks good and the designer seems experienced. The only concern I have now is that they are very new and still in the midst of registering under hdb. And or course not yet under case trust too. Anyone try them before? Can share the review?
  12. Hi Joanne, can u pls share which ID do u engage? I’m looking for an ID for my bto and yours seems doing a great job! thanks yy
  13. Hi Wendy, may I have the contact information if your contractor? thanks.
  14. Hi Joanne, nice post and nice ID u have! May I have the contact information of your contractor pls? Thanks!
×