Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Goodenf

Members
  • Content Count

    20
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by Goodenf

  1. Yes we did and you are right. We are selling back to the grid. I lucked out because I found a really good guy to do this work. He has a lot of passion in getting the job done right and best cost. I’m very happy with him. PM me if you like his contact.
  2. So what happened? I have a same recent experience with mine. It’s horrible to hire inexperienced company.
  3. Hi, I’m looking for a contractor to finish up some work left by my previous hopeless contractor. Willing to pay slightly higher price to get that done nicely. Please contact me.
  4. I would like to give an update on the progress of my A&A on inter terrace. We bought a 2070 sqft land with 1500 build up terrace and needed to extend front and back of the house to add build in area with additional ensuite bedroom. The search for a builder was daunting because we have architect that quoted us almost $750k to builders quoted $150k. In the end, we went with the second lowest quote because we are more comfortable with this builder. Our requirement was to be functional, minimize wastage, build the space we need and deliver on time. We wanted progressive updates matches with the payment schedule. Avoid variation orders and open communication. I have to say, my experience so far with my builder has been excellent. He is not perfect but he has a good attitude and most importantly trust worthy. He gives us comfort that he is always watching out for us and provide us with budget conscious options. The subcontractors he uses are reliable and the entire project was always need and tidy. He cultivate good relationships with my neighbors which make things easy for us. Where there are VO, the quote he source for us have been very competitive ( yes I did my comparison and research). We had to put in an RC Trench and chose to upgraded 3 phase electrical connection. We are scheduled to complete by Christmas for move in. So far he gave us confidence of the progress. Of course it's yet to be seen but I wanted to give him a fair comment up to this point. I have to agree with some of the comments that this experience is very dependent on picking the right people to work with and so far we have been quite lucky. That said, on our part, we recognize that we have to be reasonable ourselves, be collaborative and work on making this a pleasant experience for everyone. I will continue to provide updates as I progress along i hope this is helpful for anyone going through this same process as us. I am happy to help answer any questions to the best of my knowledge.
  5. Actually my builder managed to find me a pretty good deal and I'm very happy working with him so far. We are scheduled to move in before Christmas and looking at the progress I am confident that will be achievable.
  6. My contractor initially factored $5k for electrical on a A&A contract for our inter terrace Reno but then ask if we want to change from single to 3 phase with additional amount of $3800.
  7. Hi, anyone has any experience with changing their house from single phase to three phase wiring? Anyone knows if this is a good idea to change and how much would i normally cost? Thanks in advance for any advice.
  8. Thanks Snooze. My contractor quoted me $10K for mine but mine is 1m deep.
  9. Hi Snooze, can I ask how much did you eventually had to pay for your RC trench? I am having the same problem and like to know the cost. Very unfortunate. thanks, goodenf
  10. Hi Metalstab, Would you mind share your builder with me? I am looking for a good reliable Design and build to handle my A&A. Much appreciated goodenf@live.com
  11. Hi, Yes, I am interested to know your experience with the builder too. Would you be willing to recommend your builder? Much appreciated
  12. hi John, Did you like your builder? would you recommend them? I recently bought a inter terrace and looking to add a bedroom with ensuite bathroom + some build in area on the 1st floor too. Would be great to have some recommended builder. Much appreciated.
  13. Hi, i only have the plan bought from BCA but that really does not tell me anything. Through speaking with the architect, he asked me to pay for a QS to come and draw one. It will cost me about $2-3K. Is that correct guys? Sorry i don't have experience in this. Can anyone help advice?
  14. Hi all, I am in the process of closing my purchase of an interterrace and evaluating the cost it takes to make room for my family. We are looking to add a bedroom with ensuite bathroom on the second level as well as adding some build space to the 1st floor. We are trying to keep everything else in the house that are useable as is. Land size is approx 2070 and build in space is approx 1500. Suffice to say we are looking to add about 750-1000 sqf to build in. Our requirement is very basic and functional. No design required. I’m even open to reminder materials from Builders other projects. An archrect currently quote me me $400k for construction and estimate $80k for all fees (including his fee of $40k). He said adding a slab with piling at the back for the room extension would cost $200k already. can someone tell me this is reasonable? From what I read here, my first instinct is on the high side but not certain ( for about $500k to add 1000 sqf comes up to $500 psf). thanks.
  15. Hi all, this tread is particularly of interest to me. I recently found on property guru a corner terrace house I would consider to buy. It is a very old unit currently housing workers quarters. I have a few concerns need address before I dare make the offer. 1. I do not wish to make an offer only to find out I have foundation issues and structural issues which are big cost ticket items to fix. But the owner agent tells me Iit is not industry practice to add these as deal breaker in the OTP to get full refund of deposit. 1. I will have to be able add another 1/2 floor to it (currently 2 floor) to make space for my family. . I think it is legally allowed since the neighbor is a 2.5 sty. I need to know if the current structure will allow this addition or if I need to do a recon which I'm trying to avoid due to budget. can someone give me some advice how I should proceed please? thanks.
  16. Hi guys, can you or anyone share your view here? I have the same question. thanks in advance
×