Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ttttt

Members
  • Content Count

    4
  • Joined

  • Last visited

Community Reputation

0 Neutral

About ttttt

  • Rank
    Newbie

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Laminate choice for MBR wardrobe: Bedroom ceiling light: Pendant lights for dining area: Vinyl floor installation:
  2. Sharing the renovation process photos: From BSC touch-up and repairs: Aircon piping installation: Kitchen carpentry installation: MBR wardrobe carpentry sitting in living room: Painting of walls:
  3. Sharing some photos of when we first opened the unit. From the initial bare stage, with default HDB fittings and opt-ins:
  4. Hello all, We have managed to do a simple cozy looking, somewhat between nordic+minimalist renovation, nearing 22k. We met with a few contractors and 1 ID, and decided to go ahead with the contractor that a good friend of mine had enagaged. The whole renovations took about 3 months, as some items were out of stock and had to wait for it to be manufactured and shipped in. Here are the work items covered by my contractor: Living Room/ dining area 1. Vinyl flooring ****/dining areas and all bedrooms 2. L-box with cove light holder, including installation of down-lights and cove lights 3. Installation of ceiling fan with led light 4. Installation of pendant lights for dining area 5. Additional switches and relocation of electrical points 6. Painting for the whole house Kitchen 1. Top and bottom cabinets, total of 31ft 2. Kompacplus cabinet top and backsplash 3. Kitchen cabinet kerbs 4. Installation of kitchen accessories, including kitchen sink+tap, hood+hob+oven and an open shelf 5. Additional switch and relocation of electrical points Bathroom 1. Shower kerb for master bathroom 2. Installation of Ikea bathroom accessories for common and master bathrooms 3. Installation of Ikea sink and vanity drawer at master bathroom 4. Installation of down lights and cove lights MBR 1. Full height 6ft casement wardrobe at MBR 2. Installation of wall fan Bedrooms 2 and 3 1. Installation of wall fan 2. Additional switch for wall fan Items that I liased with direct vendors/suppliers 1. Whole house window grills and service yard window 2. Master bathroom glass shower screen 3. Aircon installation 4. Bomb shelter store rack 5. Slide arm for main door Will share more photos and details later on. Cheers!
×