Hi all,
I just bought a 2 bedroom condo (969 soft) and will be getting keys in mid-September. Our plan is to move in November (preferably by 1 Nov), with minor renovation to be done - whole kitchen (small), hack old tv console/build new one, repaint all the walls, repolish marble floors. When should we start shopping around for contractors? how much time is needed to do the above works? How much more time is needed if we decide to hack the flooring and redo flooring (change to engineered wood)?
Thanks!