  1. Precisely -"If the quality/ workmanship is good to begin with, there won't be rectification needed." they made mistakes, and the things are not what we want and caused inconveniences to us, poor workmanship, careless, forget, overlook... and we can only compromise. And then they tried to turn everything become owner's fault. the mistakes made by the workers and ID, the delay due to the ID... now all pushed it to the owner! I found the receipt that I made the payment in their documents presented to the referee, they never do any rubbish chute for me but stated they did it in the invoice (I engaged Maxden to do for me after the renovation and paid $570), few invoices with dustpan and broom + transportation $20 for each invoice, some invoices with no company name..., I don't have L box in my living room but this item appeared in the invoice... still have more... they hacked the lobby area which is under management n hv to buy the granite to replace it and also push this to owner. the PE endorsement only cost $400 but they told me $700 and I paid them $700. I only knw it's only $400 few days ago (I hv the receipt). They NEVER touch-up the slanted tv cabinet, top hung kitchen cabinet and 2 tall unit but claimed as touch up many times just not up to owner expectation . Same for the floor tiles, the skirting, the holes in the grout lines, diff gap sizes of the grout lines, uneven floor tiles... for all kind of stains that's found on the wall tiles, floor tiles, toilet bowl, toilet paper holder, cabinets, bathtub..., now they told the referee there were no stains when they handed over to the owner. i think they had forgotten the communication with the owner and also the messages that's the owner still able to show, if needed! i was very upset with this ID company, and also upset with the whole system !!!
  2. I would like to share but they said I am tarnishing their reputation and will file a case to protect. No, that's the "end product". No reply from them even still within the warranty period :((
  3. I collected the key from the legal firm in early Nov 2015 and excited about the renovation that's going to start in end Nov 2015. But the renovation which supposed to be excited about my dream home comes true became a nightmare at the end. I met 3 IDs and picked up one from that and went into details discussion. Then I kept received the call from an ID called Bxx asking me to give him a chance to meet up. That was a big mistake I ever made in my life. He convinced me with the photo shooting at the end of the reno to publish in a magazine that made me believe the good quality and workmanship he promised to deliver. When we went into the discussion on all the details, I realise that he is very careless and forgetful. Always make mistake here and there in the quotation, drawings etc.. Even my daughter also commented him. He and his boss told me the condo reno takes about 2 months (hacking started end Nov 2015) and it should not be any problem as my moving date was on 14 March 2016. The tilers and the ID kept making mistake since started the reno. The 1st huge mistake - the kitchen was lower than the dining hall by abt 1 inch and I requested and reminded the ID many times to further lower the kitchen as I wash the kitchen regularly. The outcome was they made it same level and did not realise until I pointed out to ask. His manager, Ixxxx was there and one of the solutions suggested was put some thick towels to block the water. When I finally get mad and wanted to hold back the 4th payment, Ixxxx asked me to make the payment and he promised will rectify all the problem and keep telling me " 有我在 你放心". The ID told me to buy storage heater tanks which I did not require, the worker hit the gas pipe and gas leakage without informing me (luckily I got Citygas to check on my gas pipe)..., all the things they admitted but twisted the story after that. The ID took a long time and can't come out the drawing with the correct measurement and asked me to sign on the wrong drawing. Luckily I refuse to sign on it. I hv to check on every detail and was so stressful that I miss out the mistake he makes... I regretted not taking down all the things they agreed and admitted on paper and ask them to sign. My moving date kept postponing til 9 April 2016 (can't postpone anymore as have to pay a penalty of 50% to mover). Painting condition incomplete and no chemical wash as quoted in the contract when handed over on 8 April. The unit was handed in incomplete and defective. That's a long long reno story... and I have to compromise with all the mistakes they made. It's no longer my dream house! Advice to all, do not believe what the ID says, include everything in the contract. If they make mistake and make sure they amend it. For my case, I kept telling the ID to amend but he tends to forget and then told me its ok will deduct on final payment. For my case, all the mistake they had done and things they had promised, were not in the contract and they deny everything... even I have it in whatsapp messages. Anyone can offer me some legal advice would be very much appreciated.
  4. hi, if you are referring to the photos posted by Hoholawong, it's by another ID company at Ubi Road.
  5. hi, if you are referring to the photos posted by Hoholawong, that was NOT done by Space Living, it's by another ID company at Ubi Road.
  6. hi, if you are referring to the photos posted by Hoholawong, that was NOT done by Space Living, it's by another ID company at Ubi Road.
  7. This was NOT done by Space Living, it's by another ID company at Ubi Road.
×