Hihi, seek your expert opinion on this quotation, renovation for resale 3rm HDB @ Jurong East:
1
To hack off existing sink support c/w sink & tap at Kitchen
2
To hack off existing round edge at Kitchen entrance top corners & partial wall tiles as per discussed
3
To hack off existing floor tiles & skirtings **** room, 02nos. Bedrooms & Kitchen area
4
To hack off existing floor & wall tiles at 02 nos. Toilets
5
To dismantle & remove existing water inlet & outlet pipings at Kitchen & 02nos. Toilets
6
To hack off existing platform & squatting pan at Common toilet area (for conversion to sitting WC)
7
To dismantle & remove existing toilet bowls & all bathroom accessories at 02nos. Toilets toilets
8
To dismantle & remove existing electrical wirings & casing for Whole unit
9
To dismantle & remove existing all electrical power sockets, switches & lightings at Whole unit
10
To dismantle & remove existing aluminium window grilles & windows at Whole unit
11
To dismantle & remove existing aluminium top-hung windows at 02nos. Toilets
12
To dismantle & remove existing timber doors at 02nos. Bedrooms & 02nos. Toilets
13
To dismantle & remove existing timber door & metal gate at Main entrance
14
To dismantle & remove existing rubbish chute at Kitchen
Sub-Total for Hacking / Demolition Works (Lumpsum) :
$ 3,400.00
15
Supply of raw materials & lay 600mm x 600mm Homogeneous floor tiles c/w skirtings at
$ 2,500.00
Living room & 02 nos. Bedrooms
16
Supply of raw materials & lay 300mm x 600mm Homogeneous floor tiles at Kitchen area
$ 900.00
17
Supply of 100mm x100mm white porcelain tiles & lay 01rows at new cabinets wall only
$ 300.00
18
To do waterproofing using waterproofing membrane (K-11) at Kitchen flooring (water trap area)
$ 100.00
19
To construct sink support using hollow blocks c/w metal structures (reinforcement) & tiles
$ 950.00
finishings at Kitchen area (Base on L1400mm +L500mm)
20
To construct fridge & washing machine base c/w tiles finishings at Kitchen area
$ 320.00
21
To construct cabinet base c/w tiles finishings at exposed surfaces at Kitchen area
$ 200.00
22
To do plastering at all affected walls & make good after hacking at Kitchen entrance
$ 250.00
23
To lay Homogenous floor tiles at Kitchen top after installation of Carpentry works
$ 300.00
Master Toilet & Common Toilet
24
To do cement screedings at walls at 02nos. Toilets (for laying of wall tiles)
$ 1,000.00
25
Supply of raw materials & labour to lay 300mm x 600mm Ceramics wall tiles at 02nos. Toilets
$ 2,200.00
26
To do conversion of outlet waste for squatting pan to sitting WC at Common toilet
$ 300.00
27
Supply of raw materials & labour to lay 300mm x 600mm Homogeneous floor tiles c/w kerb
$ 900.00
(entrance) at 02nos. Toilet floorings
28
To do waterproofing using waterproofing membrane (K-11) at 02 nos. Toilets floorings
$ 180.00
Sub-Total for Masonry Works / Wet Works :
$ 10,400.00
29
Wiring of new lighting pts / fan pts c/w installation of light fittings (10nos. $60.00 /no)
$ 600.00
-01no. Ceiling light **** room
-01no. Ceiling fan c/w lighting **** room
-02nos. Ceiling lights at Master & Common bedroom
-02nos. Wall lights at Master room
-02nos. Ceiling lights at Kitchen area
-02nos. Ceilings lights at Master & Common toilets
30
Wiring of new 1x13amp Single sockets (06nos $55.00/no)
$ 330.00
-02nos. Single sso **** room (general area)
-02nos. Single sso at Master & Common bedroom (Bedhead area)
-02nos. Single sso at Master & Common toilet (Heater)
31
Wiring of new 2x13amp Double sockets ( 07nos. $65.00/no.)
$ 455.00
-02nos. Double sso **** room (TV area)
-01no. Double sso at Common room (TV area)
-02nos. Double sso at Master room (TV & Computer area)
-01no. Double sso at Kitchen (Fridge & Washing Machine)
-01no. Double sso at Kitchen (Kitchen Cabinet area)
32
Wiring of new Telephone pt / Fax pt **** & Master room (02nos. $60.00/no.)
$ 120.00
33
Wiring of new SCV socket (RG 6 cable) **** & Master room (02nos. $110.00/no)
$ 220.00
34
Wiring of new Aircon pt (20amp) (01no. $ 110.00/no)
$ 110.00
35
Wiring of new Cooker hood/hob pt (20amp) c/w heater switch (01no. $110.00/no)
$ 110.00
36
Wiring of new Door bell pt c/w installation of Doorbell (01no. $6 0.00/no)
$ 60.00
37
To do earth bonding (6mm cable) (01lot. $100.00/no)
$ 100.00
Sub-Total for Electrical Works :
$ 2,105.00
38
To run new exposed stainless steel piping (cold water) to Kitchen & 02nos. Toilets
$ 1,200.00
39
To install & connect 01no. Kitchen sink & tap c/w outlet pipe (PVC) at Kitchen area
$ 180.00
40
To install & connect 01no. Washing machine tap c/w outlet pipe (PVC) at Kitchen area
$ 100.00
41
To install & connect 02nos. wash basins & taps c/w outlet pipe (PVC) at 02nos. Toilets each
$ 240.00
42
To install 02nos. Toilet sitting bowls at 02nos. Toilets each
$ 200.00
43
To install 02set bathroom accessories at 02nos. Toilets each F.O.C
F.O.C
44
To install & connect 02sets Instant heaters at 02nos. Toilets each
$ 160.00
Sub Total for Plumbing Works :
$ 2,080.00
45
Supply labour, equipments , Nippon/Maltex emulsion paints & oil-based sealer to
$ 1,100.00
paint whole unit interior walls (max. 5 colors) & ceilings (white)
- Base coating for whole unit interior walls & ceilings using white emulsion paint (Maltex)
- Nippon emulsion paints (Vinilex 5000 series) at all interior walls
- Door frames in glossy paints (Bodelac 9000 series)
46
Supply labour & materials to do box-up wire casing & pipings **** & Kitchen area $ 350.00
$ 350.00
Sub Total for Fibrous Plasterings Works & Painting Works :
$ 1,450.00
Supply labour, eqiupments & materials to install for the followings using Aluminium frames
(BA/NA/BL c/w black tinted glass)
47
To install 01set Sliding window (2-tier) **** room (Base on L1400mm xH1100mm)
$ 270.00
48
To install 01set Sliding window (2-tier) at Common Bedroom (Base on L1400mm xH1100mm)
$ 270.00
49
To install 01set Casement window at Master room (Base on L1200mm xH1100mm)
$ 280.00
50
To install 01set Sliding window at Kitchen area (Base on L2600mm xH1100mm)
$ 550.00
51
To install 02sets Casement top-hung window at 02nos. Toilets area (Base on L600mm xH450mm)
$ 300.00
52
To install Fixed window grilles for whole unit (Base on L6600mm x H1100mm)
$ 640.00
53
To install 02sets Bi-fold doors c/w lockset at Master & Common toilet (L900 xH2100mm)
$ 400.00
54
To install 01set Sliding doors at sink support (Base on L1600mm x H800mm)
$ 330.00
55
To install 01set Wrought Iron gate c/w galvanized iron at Main entrance
$ 600.00
(Base on L950mm xH2100mm)
Sub Total for Aluminium & Wrought Iron Works :
$ 3,640.00
56
56 To install 01set Designer Veneer plywood door c/w press lockset at Main entrance
$ 650.00
(Base on L900mm xH2100mm)
57
57 To install 02sets Designer Veneer plywood door c/w knob lockset at 02nos. bedrooms entrance $ 780.00
$ 780.00
(Base on L900mm xH2100mm)
Sub Total for Timber Doors & Frames Works : $ 1,430.00
$ 1,430.00
59
To install Full-height cabinets at Kitchen area (Base on L600mm +L800mm) $ 1,800.00
$ 1,800.00
60
To install Top & Bottom cabinets (Base on L4850mm)
$ 2,080.00
61
To install timber base support for tiles worktop finishings c/w 25mm bullnose (timber strip)
$ 500.00
profile at Kitchen cabinet (Base on L2425mm)
-01set of drawers c/w 3way tracks & soft closers hinges
F.O.C
-01no. of cutlery tray
F.O.C
61
Installation of Cooker Stove & Hood F.O.C
F.O.C
Sub Total for Carpentry Works / Furniture Fittings :
$ 4,380.00
62 Sand & Haulage fees (uploading of sand/material and downloading of debris) $ 800.00
$ 800.00
63 Debris container for removal of debris to M.O.E approved dumping site $ 500.00
$ 500.00
64 Floor protection cardboard for Living area & Passageway flooring $ 150.00
$ 150.00
65 General cleaning for whole premise & Chemical washing at Kitchen & 02nos Toilets
$ 500.00
Sub Total for Miscellaneous Works :
$ 1,950.00
Total Amount :
$ 30,835.00
Discount :
$ (835.00)
Grand Total Amount :
$ 30,000.00