  1. Thanks for the feedback. Yup, I buy the tile myself. I find the hacking is overpriced.
  2. Hihi, seek your expert opinion on this quotation, renovation for resale 3rm HDB @ Jurong East: 1 To hack off existing sink support c/w sink & tap at Kitchen 2 To hack off existing round edge at Kitchen entrance top corners & partial wall tiles as per discussed 3 To hack off existing floor tiles & skirtings **** room, 02nos. Bedrooms & Kitchen area 4 To hack off existing floor & wall tiles at 02 nos. Toilets 5 To dismantle & remove existing water inlet & outlet pipings at Kitchen & 02nos. Toilets 6 To hack off existing platform & squatting pan at Common toilet area (for conversion to sitting WC) 7 To dismantle & remove existing toilet bowls & all bathroom accessories at 02nos. Toilets toilets 8 To dismantle & remove existing electrical wirings & casing for Whole unit 9 To dismantle & remove existing all electrical power sockets, switches & lightings at Whole unit 10 To dismantle & remove existing aluminium window grilles & windows at Whole unit 11 To dismantle & remove existing aluminium top-hung windows at 02nos. Toilets 12 To dismantle & remove existing timber doors at 02nos. Bedrooms & 02nos. Toilets 13 To dismantle & remove existing timber door & metal gate at Main entrance 14 To dismantle & remove existing rubbish chute at Kitchen Sub-Total for Hacking / Demolition Works (Lumpsum) : $ 3,400.00 15 Supply of raw materials & lay 600mm x 600mm Homogeneous floor tiles c/w skirtings at $ 2,500.00 Living room & 02 nos. Bedrooms 16 Supply of raw materials & lay 300mm x 600mm Homogeneous floor tiles at Kitchen area $ 900.00 17 Supply of 100mm x100mm white porcelain tiles & lay 01rows at new cabinets wall only $ 300.00 18 To do waterproofing using waterproofing membrane (K-11) at Kitchen flooring (water trap area) $ 100.00 19 To construct sink support using hollow blocks c/w metal structures (reinforcement) & tiles $ 950.00 finishings at Kitchen area (Base on L1400mm +L500mm) 20 To construct fridge & washing machine base c/w tiles finishings at Kitchen area $ 320.00 21 To construct cabinet base c/w tiles finishings at exposed surfaces at Kitchen area $ 200.00 22 To do plastering at all affected walls & make good after hacking at Kitchen entrance $ 250.00 23 To lay Homogenous floor tiles at Kitchen top after installation of Carpentry works $ 300.00 Master Toilet & Common Toilet 24 To do cement screedings at walls at 02nos. Toilets (for laying of wall tiles) $ 1,000.00 25 Supply of raw materials & labour to lay 300mm x 600mm Ceramics wall tiles at 02nos. Toilets $ 2,200.00 26 To do conversion of outlet waste for squatting pan to sitting WC at Common toilet $ 300.00 27 Supply of raw materials & labour to lay 300mm x 600mm Homogeneous floor tiles c/w kerb $ 900.00 (entrance) at 02nos. Toilet floorings 28 To do waterproofing using waterproofing membrane (K-11) at 02 nos. Toilets floorings $ 180.00 Sub-Total for Masonry Works / Wet Works : $ 10,400.00 29 Wiring of new lighting pts / fan pts c/w installation of light fittings (10nos. $60.00 /no) $ 600.00 -01no. Ceiling light **** room -01no. Ceiling fan c/w lighting **** room -02nos. Ceiling lights at Master & Common bedroom -02nos. Wall lights at Master room -02nos. Ceiling lights at Kitchen area -02nos. Ceilings lights at Master & Common toilets 30 Wiring of new 1x13amp Single sockets (06nos $55.00/no) $ 330.00 -02nos. Single sso **** room (general area) -02nos. Single sso at Master & Common bedroom (Bedhead area) -02nos. Single sso at Master & Common toilet (Heater) 31 Wiring of new 2x13amp Double sockets ( 07nos. $65.00/no.) $ 455.00 -02nos. Double sso **** room (TV area) -01no. Double sso at Common room (TV area) -02nos. Double sso at Master room (TV & Computer area) -01no. Double sso at Kitchen (Fridge & Washing Machine) -01no. Double sso at Kitchen (Kitchen Cabinet area) 32 Wiring of new Telephone pt / Fax pt **** & Master room (02nos. $60.00/no.) $ 120.00 33 Wiring of new SCV socket (RG 6 cable) **** & Master room (02nos. $110.00/no) $ 220.00 34 Wiring of new Aircon pt (20amp) (01no. $ 110.00/no) $ 110.00 35 Wiring of new Cooker hood/hob pt (20amp) c/w heater switch (01no. $110.00/no) $ 110.00 36 Wiring of new Door bell pt c/w installation of Doorbell (01no. $6 0.00/no) $ 60.00 37 To do earth bonding (6mm cable) (01lot. $100.00/no) $ 100.00 Sub-Total for Electrical Works : $ 2,105.00 38 To run new exposed stainless steel piping (cold water) to Kitchen & 02nos. Toilets $ 1,200.00 39 To install & connect 01no. Kitchen sink & tap c/w outlet pipe (PVC) at Kitchen area $ 180.00 40 To install & connect 01no. Washing machine tap c/w outlet pipe (PVC) at Kitchen area $ 100.00 41 To install & connect 02nos. wash basins & taps c/w outlet pipe (PVC) at 02nos. Toilets each $ 240.00 42 To install 02nos. Toilet sitting bowls at 02nos. Toilets each $ 200.00 43 To install 02set bathroom accessories at 02nos. Toilets each F.O.C F.O.C 44 To install & connect 02sets Instant heaters at 02nos. Toilets each $ 160.00 Sub Total for Plumbing Works : $ 2,080.00 45 Supply labour, equipments , Nippon/Maltex emulsion paints & oil-based sealer to $ 1,100.00 paint whole unit interior walls (max. 5 colors) & ceilings (white) - Base coating for whole unit interior walls & ceilings using white emulsion paint (Maltex) - Nippon emulsion paints (Vinilex 5000 series) at all interior walls - Door frames in glossy paints (Bodelac 9000 series) 46 Supply labour & materials to do box-up wire casing & pipings **** & Kitchen area $ 350.00 $ 350.00 Sub Total for Fibrous Plasterings Works & Painting Works : $ 1,450.00 Supply labour, eqiupments & materials to install for the followings using Aluminium frames (BA/NA/BL c/w black tinted glass) 47 To install 01set Sliding window (2-tier) **** room (Base on L1400mm xH1100mm) $ 270.00 48 To install 01set Sliding window (2-tier) at Common Bedroom (Base on L1400mm xH1100mm) $ 270.00 49 To install 01set Casement window at Master room (Base on L1200mm xH1100mm) $ 280.00 50 To install 01set Sliding window at Kitchen area (Base on L2600mm xH1100mm) $ 550.00 51 To install 02sets Casement top-hung window at 02nos. Toilets area (Base on L600mm xH450mm) $ 300.00 52 To install Fixed window grilles for whole unit (Base on L6600mm x H1100mm) $ 640.00 53 To install 02sets Bi-fold doors c/w lockset at Master & Common toilet (L900 xH2100mm) $ 400.00 54 To install 01set Sliding doors at sink support (Base on L1600mm x H800mm) $ 330.00 55 To install 01set Wrought Iron gate c/w galvanized iron at Main entrance $ 600.00 (Base on L950mm xH2100mm) Sub Total for Aluminium & Wrought Iron Works : $ 3,640.00 56 56 To install 01set Designer Veneer plywood door c/w press lockset at Main entrance $ 650.00 (Base on L900mm xH2100mm) 57 57 To install 02sets Designer Veneer plywood door c/w knob lockset at 02nos. bedrooms entrance $ 780.00 $ 780.00 (Base on L900mm xH2100mm) Sub Total for Timber Doors & Frames Works : $ 1,430.00 $ 1,430.00 59 To install Full-height cabinets at Kitchen area (Base on L600mm +L800mm) $ 1,800.00 $ 1,800.00 60 To install Top & Bottom cabinets (Base on L4850mm) $ 2,080.00 61 To install timber base support for tiles worktop finishings c/w 25mm bullnose (timber strip) $ 500.00 profile at Kitchen cabinet (Base on L2425mm) -01set of drawers c/w 3way tracks & soft closers hinges F.O.C -01no. of cutlery tray F.O.C 61 Installation of Cooker Stove & Hood F.O.C F.O.C Sub Total for Carpentry Works / Furniture Fittings : $ 4,380.00 62 Sand & Haulage fees (uploading of sand/material and downloading of debris) $ 800.00 $ 800.00 63 Debris container for removal of debris to M.O.E approved dumping site $ 500.00 $ 500.00 64 Floor protection cardboard for Living area & Passageway flooring $ 150.00 $ 150.00 65 General cleaning for whole premise & Chemical washing at Kitchen & 02nos Toilets $ 500.00 Sub Total for Miscellaneous Works : $ 1,950.00 Total Amount : $ 30,835.00 Discount : $ (835.00) Grand Total Amount : $ 30,000.00
×