Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Emilita Lim

Members
  • Content Count

    8
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Emilita Lim

  • Rank
    Member

Previous Fields

  • Gender
    Female

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. @Hwmook ya i was wondering about that too.. but the rest seems reasonable enough right?
  2. How about this? This is from another firm..
  3. @Hwmook any suggestions on how to bargain for lower prices?
  4. @Taz89 did you signed with them in the end? Who is your ID?
  5. Hi forumers, I need your help, to see if the reno company's quotation is reasonable. Let me know your thoughts. A Demolition Works A.1 To hack off existing Wall at kitchen area(balance 1m from floor keep) 720 Approx Size: L2200mm H1600mm A.2 Submission of professional engineer FOC A.3 Haulage services 750 A.4 Removal & disposal services FOC A Subtotal 1470 B Masonry Works*Inclusive of the use of prepacked materials mandated by HDB(excluding tiles) B.1 To supply materials & labour to lay 60 x 60 polished homogeous tiles/w skirting at floor of Living & 3630 dining room. *based on $3.00 psf tile B.2 To supply materials & labour to lay 60 x 60 polished homogeous tiles/w skirting at floor of master 1990 bedroom. *based on $3.00 psf tile B.3 To supply materials & labour to lay 60 x 60 polished homogeous tiles/w skirting at floor of bedroom 2 1320 *based on $3.00 psf tile B.4 To supply materials & labour to lay 60 x 60 polished homogeous tiles/w skirting at floor of bedroom 3 1290 *based on $3.00 psf tile B.5 To supply materials & labour to make to good hacking area wall(kitchen) excluding tiles 500 B.6 To supply materials & labour to construct 50mm cement kitchen cabinet base 550 B.7 To supply materials & labour to construct shower curb at master bathroom 180 B Subtotal 9460 C Plumbing Works C.1 To supply labour to install kitchen sink & tap after carpentry work 120 C.2 To supply materials & labour to install 2 nos hot water points 200 C.3 To supply labour to install 2 nos Shower mixer 180 C.4 To supply labour to install 2nos water heater or instant heater 120 C.5 To supply labour to install 2 nos toilet spraygun 80 C.6 To supply labour to install bathroom accessories FOC C Subtotal 700 D Aluminium / Glass Works / Wrought Iron D.1 To supply materials & labour to install fixed panel 10mm tempered glass at kitchen area 570 Approx size: L2100mm H1600mm D.2 To supply materials & labour to install 5mm clear mirror for shoe cabinet 250 Approx size: L500mm H2000mm D.3 To supply materials & labour to install fixed panel with casement 10mm tempered glass shower 480 screen at master bathroom. Approx size: L1500mm H1800mm D.4 To supply materials & labour to install sliding door with fix panel with 10mm tempered glass at 750 kitchen entrance area. Approx size: L1100mm H2100mm D Subtotal 2050 G Miscellaneous G.1 To supply materials & labour to paint whole house ceiling & wall using Nippon Venillux 5000 1450 emulsion paint.( 5 colors including white) G.2 To supply materials & labour to paint whole house gate, door, door frame, pipe & etc FOC G.3 To supply materials & labour to lay cardboard protection at areas of work FOC G.4 General Cleaning for whole house upon completion 250 G.5 Acid washing for whole house to remove stains 250 G.6 To supply materials & labour to install Mitsubishi system 4 inverter at master, common 2 , 3 & study room (4A28VAMSY. GE10VA *3MSY. GE18VA*1) 3950 G Subtotal 5900 H Budgetary Carpentry Quotation ( Prices are subjected to change at final design & material stage ) Kitchen H.1 Design, fabricate & install top & bottom Kook's kitchen cabinet . 3260 • Designer Kitchen Cabinet • ABS Laminated Door • Aluminium glass door • Coloured PVC Internal Finish • slow close/anti-slam hinges • slow close/anti-slam drawers • 1 set "BLUM Aventos" Pull Up Slow Close Door • 1 No Stainless Steel Dish Rack • solid plywood Approx sze: L6200mm x H850mm x D600mm/D350mm H.2 To supply material & install selected 15mm Quartz worktop. 1370 Approx sze: L3100mm x D600mm H.3 To supply material & install selected 12mm'' Bellus''solid-surface worktop 450 Approx sze: L1500mm x D600mm Living Area H.4 Design, fabricate & install full height shoe cabinet w/settee and display with solid plywood/finished 1820 in color PVC, laminate. Approx Size: L 1000mm H2550mm D450mm Master Bedroom H.5 Design, fabricate & install built-in full height sliding wardrobe with solid plywood finished in color 4650 PVC & laminate. Approx size: L4500mm H2550mm D600mm H.6 To supply materials & labour to construct one step platform(Include 1 small step to platform) with 2350 storage at side and top in selected laminate finish at master bedroom. Approx size: L2800mm x D2200mm X H300mm Dining Room H.7 Design, fabricate & install island w/settee and display with solid plywood/finished in color PVC, 1250 laminate. Approx Size: L 1500mm H750mm D600mm H Subtotal 15150 Please let me know asap....
  6. Hi Jimmya, can share me your contractor details, loving ur designs!! My email: emilitalim07@gmail.com
×