Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

shutiao06

Members
  • Content Count

    246
  • Joined

  • Last visited

Everything posted by shutiao06

  1. Hi, anyone engaged them so far? would like to find out how's their worksmanship, service (both durin reno and post reno). stil waitin for them to revert to us on our appmt this wk. seems like they are quite bz at the moment and a bit slow in respondin...
  2. choonyin, thanks! all the best for ur reno too.. do update and post more pics hee Hi alexter, o reali? hmm so is she doing any designing for any of the flats there? hee. anyway, the other time one of the id we met up also suggested hacking the wall between MBR & LR, then usin tat area for WIW. but i think the idea was a bit diff, cos the new wall was to align with the HSS. so i tink i can understand wat u mean. TV wall to be this wall, which means the wiring, sockets, scv gota redo? the id also proposed this to us, but juz worried duno whether wil cause tv reception to b bad or not hee. hmm for the wall, i cant reali visualise it.. but if it's like a stairs design, i picture it to b like 3 kinda L shaped triangles overlappin? haa pai sei leh i duno ur neighbour can pop in like tat ah hee.. or perhaps we can go visit u? then after tat if ur neighbour's in, u can intro us to her hee saw ur blog, seems like a lot of things done rite... also keen to c the progress of ur reno hee. haa ok i'll try. got 2 more pics to post.. hopefully can upload smoothly oic.. err our toilet big meh? i find ok only leh. the common toilet shower area sooo small haa. wonderin how m i goin to hand wash clothes nex time haa. somemore the wooden doors take up so much space, very inconvenient, tinkin of whether to change to bi-fold doors i actually prefer ur toilet.. cos located at passageway there more convenient and the tiles look nicer too hee. went down last sat to take a look at the rectification progress. yeah! finally our LR grouting is white! feedback abt the kitchen and toilets grouting separately, so wasnt done yet. hopefully they'll do tat for us as well. they also vanished the LR skirtin for us as we complained abt the black patches and uneven tone but i tink not very well done yet, cos some of the dents on the skirtin they did not do anythin abt it, so after the vanish, can stil see the dent when i look from the side. gota feedback again..
  3. hi greenskyiv, no prob la.. where got interrupt..everyone is free to join in to chat chat hee. ya thanks for ur sugg man..wah tat wil b havin the best of both worlds.. actually i kinda like the wooden ones but after seein the glossy type, looks very classy too haha. now tat u mention this, tink tat'll reali b nice mayb can feedback to my id after we find one haha. so have u cfm ur id? icic..so u r our neighbour too.. then feel free to join in in the other thread. i've updated ur name in the list already do come in and chat the link is as follows http://www.renotalk.com/forum/index.php?sh...mp;#entry267260
  4. met up with him last wk.. i would say his initial layout was gd.. it was creative as he tries to maximise the use of our space and try to define each area very nicely.. his was the only diff design i've seen after meetin up with quite a few others.. at least there's somethin diff and it gives us another perception how we can do up our place.. not like any other typical kinda layout.. quite hapi wif the initial layout.. now the only thing is the cost.. cos there are some hackin involved. but durin our initial meetup, i always tell the id we dun wan to hack anythin. but only jeremy dare to propose hacking haa.. hope to see the improved layout after we told him our concerns.. and of cos the quotation. too bad he said he's out of town today.. gota wait til nex wk
  5. yo, tink we'll only b there ard 4pm. ya guess everythg can b seen from ur pics too haha. nvm, if u guys r ard mayb can go over say hi.. u guys can come too if u all wan haa.. chk ur PM wah... black col kitchen top.. cool leh.. i oso kinda like it in black.. but now stil tinkin..duno wana use wood for cabinet or those glossy finish? ok reali gota liao..
  6. wah they r efficient leh..so gd for u wah btw u all always take leave to go down ah? we wkdays no time to go.. very anxious to know how it is..
  7. Hi all, thanks for visiting and the interest hee.. hope u all enjoy the pics.. woah.. took me a long time..ha. hi joyousonline, thanks! i'm in st 64 hee.. but yeah, we're stil near.. same neighbourhood! hope to know more ppl in this neighbourhood.. cyanide, i'm at blk 676b.. corridor unit.. guess urs shld b corridor unit but at the other side (near the staircase) rite? tat's y mirror image of mine hee haroldism, alamak.. dun laugh at me leh.. me abit of IT idiot leh haaha.. but finally the pics are up! hee. but d.amn tired liao...time for bed.. nitez
  8. ya i know.. duno y the rest turned out like tat leh so sad waste my time and effort.. got a few more cant post together.. msg prompted tat i exceeded the no. of pics to post.. but the size of the first pic.. is it ok?? now tryin to do the rest again finally, managed to redo all of them.. are they ok now?? MBR, view from entrance view from MBR showing MBR toilet entrance BR 2 BR 3 Kitchen
  9. Sorry for the delay.. been bz.. Pictures! Finally solve the prob of uploading! Happy viewing! View from main entrance view from main entrance showing corridor window view from LR windows to main entrance view from LR windows into bedrooms
  10. wow haroldism & graciegal, glad to pics of ur reno in progress!! seems like ur reno is making gd progress.. envy u.. hope everythg wil go well for u..do keep the pics coming, guess all of us are excited to c more pics btw, ur kitchen cabinet wil b black? the base which is black in colour looks cool ya.. it's not a suspended one rite? seems like now suspended is not in ah.. cos abt 1yr+ back when my mum was renovating theirs, seems like suspended is the in thing? tink i notice ur flooring not covered with protective sheets? need to get them to cover not..in case the rectified tiles gets stained or scratched again... mayb u wana ask ur id abt it wil u all b there tomolo? can i buay pai sei ask to go c c look look at ur place? haa
  11. hi haroldism, oic ok.. tomorrow we goin down to check on the progress of the rectification work. din go down at all after goin down to submit my keys this mon. hopefully they have done somethin to the groutin hee. if stil no progress tink i muz go make noise at BSC already too so gd ur one has been done swee swee for u... envy envy.. ic.. so she's reali very helpful wil try to look for her too haa..but for the defects, i thought gota settle b4 commencing reno? can do after reno one ah? ok wil go view ur blog.. wah so gd.. tat time was PM-ing graciegal abt the ID and so fast ur reno started liao. we reali like tortoise, til now have even cfm any ID. haiz. but after cny, all of them seems to have disappeared.. now stil waitin for quotations. haiz. stil need me to chase after them... this kinda service i oso scared scared to let them do... kiki, think muz reali insist on it. we've already paid a premium price for the flat so i dun c y they shld not do it for us. even though the flat has been there for more than 5yrs, but i dun tink tat's an excuse to say tat we shld accept the state of the flat now. since they kept it for so long, they shld do the necessary and hand over it in gd condition rite.. so muz reali ask hdb to rectify everything. keep pesterin them else complain directly to hdb. i tink email hdb usin their feedback form or wat might help. but anyway, glad to hear tat ur floor tiles issue has been resolved wah the door can change new one ah.. i oso wan leh ha.. but i tink they purposely say gota wait 3 mths to scare u la.. regardin my windows, they oso told me windows if wan them to do can.. but gota wait for mayb one mth... reali crap.. wil update u guys again after we go down to check this wkend.. keepin my fingers crossed
  12. Hi jogal, welcome to renotalk can juz add in ur name into the list, but anyhow, here's the updated list 675B : Spotkev, Alexter 676A : ilovecoffee, kiki2004, TinyEyes, mysotic, sengkt 676B : crazygirl48, roseberry, shutiao06, popeye gal 677A : cyanide, bpheng 677B : shootmie 677C : inuya5ha 678A : teodami, Commando, bubbletan, jogal 678B : rav3n, GraCieGaL 678D : dar80
  13. Hi all, finally rem to bring our camera down when we went down last wkend. wanted to upload the photos here but seems like there's some prob..very slow and i'm sleepy wil do it tomorrow nite nite
  14. hi kiki, hmm they actually willing to change all the tiles in ur living room for u ah..then i guess urs shld b quite major prob. cos mine they din even bother to check all the masking tapes i labelled on our parquet. wonderin whether they'll reali rectify everythin one or not. but i've got a Q... after they do the rectification on whichever part we indicated, would they remove the maskin tape? and if they do, and remove all the tapes, how can we verify whether they reali rectify all the defects? muz go thru one more round of inspection ah? wah piang then i faint ah chk one time already so d.amn tiring liao... hmm i tink the price they wana charge u very ex leh. they base the price on wat they wil charge for doin 600mm tiles for the livin room or got take into consideration tat urs is rectification? thought they shld like give a discounted rate? cos i heard from an ID previously tat his owner last time got a lot of defects too but end up they liaise with contractor direct to redo the whole house flooring. need to pay only 500. but i not sure true or not la.. and duno how long ago tat was and for which area. try to complain again lor. cos i tink it's not fair for them to ask us to bear the cost if in the first place they din even do much quality control. i'll c wat they do to our feedback. if stil cant work gota pester them again or mayb email to complain to hdb? hmm ok. so far we never go down to BSC to look for the officers. always submit online. mon i first time go there ah. but din c her ard. i believe she shld b the one who called me. so u mean the other newly found defects even u dun submite online, juz tell her abt it then she'll also get the contractor to do for u? so gd.. wow tat's very fast leh. they redo kitchen and toilet as well? din know tat can b done as well. i juz added tat to my list of defects on sun only. duno they'll take note or not for parquet, u have any scratches or gaps uneven parquet? hope ours can b settled soon. when r u all startin reno? ya lor.. tat's y so disappointed tat they have such sloppy finishes for premium flat. make us pay so much stil give us substandard work. the officer stil dare to tell me tat before handling over, they already did inspection but diff ppl got diff expectations. omg.. dun tell me for their own house they can accept stained grouting, uneven parquet, gaps, holes, cracks, rusty hinges etc etc sure... wont compromise one...muz make sure we get wat we paid for hee o ya i agree.. the price also wasnt discounted. the more i tink abt it, the more angry i become
  15. Hi haroldism, yap saw ur pic and also other neighbour's posts tat the grouting prob can be rectified, tat's y we also feedback tat prob to hdb. however, duno y for our case, they seem to b reluctant to do it and keep finding excuses. nvm, shall wait and see wat happens since we also submited 3 lists of defects online. if they stil dun do anythin by this wkend i'm goin to the office to pester them liao o is the lady's name "A**a"? cos she was the one who called me up. however, called her yday but she was on leave so cant get her. went down yday afternoon to submit the padlock key. btw, how long they take to do the groutin ah? and other defects have they finished doin?
  16. hi, juz some updates here... we met up with the hdb officer to do the joint inspection last sat. however, gives me the impression tat they kinda this cant rectify tat cant rectify like tat. cos when we told them abt the rusty window hinges, the more senior looking guy was sayin o actually windows not included in the rectification one leh.. u wash already then ok la... rusty wash already oso rusty wat.. he kept sayin oh cant help it leh... when u buy the flat u shld know the flats r there for 5yrs already rite then even uneven parquet or some parts are actually "bloated", he also said cant do anythin much..cant help it one... omg.. duno is it cos now they have a lot of units to rectify tat's y juz wana get over it and tell us all those cant be helped... as for the stained grouting, also feedback to them.. from wat i read from the forum, they would redo it for us rite? but he sort of reluctant to do it when i ask him abt the colour of grouting. i asked it shld b white rite? then the officer said no lah not white one.. white already nex time also wil become black. hear already i reali very angry then we asked him no matter wat gota do it.. then he said ok they'll try to clean it.. but colour wil b peach not white.. omg.. hubby was sayin mayb the technical term for the colour is "peach"? i hope so... dun wan my floorin to turn out stil the same with stained grouting. anyone encounter such prob?
  17. hihi welcome.. yap better late than never haa.. my MBR ok la..WIW might have quite a prob. although those IDs we visited said can b done. but most likely wont b doin tat due to prob constraint haa. guess a BIW wil do hee. we actually wanted a 4room but all taken up already and no new ones ard west ard durin the time we applied. 4room better leh. more rebates etc spinball - thanks for visiting..do drop by to spam often haa LLhome - nope, we haven cfm with ideal house. waitin for Mr K to come back cos need to meet him up again regardin the quotation. now bz with defects checkin. haiz duno how long then the defects wil b rectified. sure, wil check out ur pics hopefully i can post more pics here but always 4got to bring camera when we go down hee. ya we also had tat prob.. gota do everythin b4 sun sets.. tat's y wana ask wat others did but too bad we dun have an existin standin lamp..
  18. hmm ok. cos we din reali knock on every piece of the parquet to c if they are hollow or not. checkin for gaps, scratches etc already took quite a while but the darker colour tones are not those natural dark wooden colour cos i understand wood there might b some diff in colour. but these are dark patches a bit blackish in colour. was wonderin possible to b some kind of mould or not? btw, wat wil hdb do for gaps ah? gaps meanin between 2 pieces of parquet slabs, can see a line whereby there's this layer or harden glue is it? actually hubby said those are the joints with glue duno wat hdb can do. but i told him juz label first then feedback to them see how lor. haa. we oso duno which are actually defects which can b rectified. guess we gota wait til this sat's inspection to ask the officer wat can b done..
  19. hi, juz to check for the parquet flooring defects, do u guys actually go and check each and every piece for hollow tiles or gaps? find it so d.amn tedious to check on the flooring arrggh so far i tink we managed to finish mainly the MBR parquet only. then the skirting is it meant to b hollow? it's like so many parts with the hollow sound man... and also anyone experience different tones on the skirting and also top of skirting turned kinda black in colour and some parts of the skirting also had these black colour tones..omg..
  20. err u mean the gas pipes have not been fixed yet? or u mean to connect to our hob.. hmm tat can b done by the contractors not?
  21. rav3n - ok, appreicate tat.. can PM it to me if it's convenient. thanks! applefreak - ic.. hmm but we dun have existing one. actually was tinkin whether can get hubby to fix a light bulb since there are existing lighting points haa.
  22. yo, pls do update ur rectification progress. finally rec'd a call from the officer yday but our joint inspection appmt gota wait til nex sat wait wait and wait nvm, wil make use of the time to spot and report more defects ya, agree tat washin the floor reali shiong man.. we washed twice but stil leave our feet black everytime we go down btw, parquet cant be mopped with too wet mop is it.. wil the parquet pop up?
  23. me stil waiting for him to get back to me cos we can only make it on wkends but he's quite tied up this sat. haiz. tink gota wait another wk already
×