  1. hi. just move in less than 2 months. shall upload pics when i am free.
  2. Now waiting for the carpentry to be rectified as spotted a few faults.
  3. thanks for your support in my blog. looking foward to ur carpentry
  4. nearing completion pending final coat of painting,aircon installation,ceiling fan,plenty of mirror and glass. By next weekend should be move-in ready
  5. By next week, most of the renovation works should be completed. Will post updated pictures than. This is my first renovation journey, hopefully will stay here till old.
  6. this is quartz from lian hin. $220 psf. with regards to the bomb shelter. need to make additional feature wall with additional door. pretty pricey
  7. Today is the 8th day of renovation. Up till date, works have been smooth. Carpentry will be stated to take place after CNY, so all misc works should be completed before CNY.
  8. purchase 2 of this phillips outdoor light for my balcony This is the bedroom 2 which is converted to a WIW. Hacked the original door opening on the left side of the room and recreating a new door frame measuring 1300 right in the middle This is the new MBR door frame which is recreated approximately 3 and 1/2 living room floor tile in front of its original position. Because of this, i have to hack of the original floor tile and replace it with parquet or else when i enter the MBR, the flooring would be different. Making good of the half-hack wall separating kitchen and living room. Common toilet~~ wall tiles worls halfway into it.
  9. All debris have been clear away and everything inside both toilet have been removed. Next up will be electric works and ceiling works followed by air con works next week.
  10. Bedroom 2 hacking. Will be a WIW,so decided to hack the original door and recreate a new door opening in the middle measuring 1350. The wardrobe will be evenly on both side as well as covering the entire window. This will be a half hack wall separating the kitchen and living room. the V&B bathtub which i ordered
  11. Missus found a fridge she wants thou my objection against the price was overruled. Hacking will start next tue.
  12. Went to lian seng hin to select tiles for overlay. considering this as kitchen top
×