sengkt
Members-
Content Count
52 -
Joined
-
Last visited
Community Reputation
0 NeutralAbout sengkt
-
Rank
Silver Member
Previous Fields
-
Renovator Engaged
Orange Cube
-
Gender
Male
-
Actually OC didnt really overcharge me a lot. With my limited budget i've gotten my place nicely done up. Not bad No choice, what paid cannot be unpaid. Me and my wifey love the curtains a lot, though it's a but overpriced...
-
Shouldn't use plastic sheet to cover the table top la, spoil the look. You might want to get some windows film, similiar to car's solar film and DIY yourself, That way it almost look invisible Hmm.. Shop8 charges me $1800 for these items, I think it's kind of expensive too 1) Living room, day and night curtain - day curtain similiar to yours on the pic but only silver color, from both side 2) Total dark out roman blind for MBR, 2 pcs 3) normal roller blind for BR 2 and 3. Should be able to get better bargin elsewhere.
-
Very impresive 3D work. I got my home done up by Ornage cube and is 100percent completed. Overall quite please though they are a bit overpriced. Mind sharing your total quote for the reno?
-
Yup, my wifey likes that a lot. initally i'm worried that it might attract fingerprints but turn out it's quite easy to clean off. hey, your curtain looks very much like mine. I got it thru OC recommendation from a guy call Frankie. I didn't do anything to it. save $$ no choice
-
That is acutally a build in trashbin i bought from Poh joo. The interesting part is there's an water outlet at the bottom so we can wash it down with water
-
It's been a long time since I last update. We are almost completing our renovation and here's the pictures. Do leave your comment. :0) Foyer area and dining http://s284.photobucket.com/albums/ll38/se...DSC05588_64.jpg Dining and bomb shelter http://s284.photobucket.com/albums/ll38/se...DSC05591_64.jpg Living http://s284.photobucket.com/albums/ll38/se...DSC05594_64.jpg Kitchen http://s284.photobucket.com/albums/ll38/se...DSC05586_64.jpg MBR BIW http://s284.photobucket.com/albums/ll38/se...DSC05599_64.jpg Overall, nice job done up by my ID..
-
I'm using them. Serivice so far so good. I'm currently doing my carpentary, my kitchen cabinets laminate got lots of bend mark on it when we on the lights and see the reflection. I'll see how they gonna retify this for me... Carpentary work is so so only but design is good. Will update further as my house is not completed yet... might have to retify here and there.. Rgds
-
I encounter BAD service from them. We asked for a Class 0 totaline material, BUT on the day of the installation, the workers bought along Class 1 material, which is the cheaper ones. Called the Salesman who wrote on the invoice as CLASS O and he try to give all sort of excuses, in the end, after I treaten to take them to CASE, he agreed to give me the CLASS 0 totaline as per invoice. GUESS WHAT... As the worker did not bring along the right material (CLASS 0), we were advised to make another appointment date to install the piping. THAT means 2 weeks for the 1st time, and now another 2 weeks of wait because of HIS MISTAKE that the wrong material was bought..TOTAL of 4 weeks to do up the PIPING.... give me the reason that all the schedule are packed... GUYS, you might want to be there during the installation date to make sure that they don’t cheat on you on the material...be it on purpose or not...which unfortunately happens to me... HAI, this kind of customer service really cannot make it...
-
Comments About Allbest Aircon Co.
sengkt replied to tomatolander's topic in Electronics & Electricals
I encounter BAD service from them. We asked for a Class 0 totaline material, BUT on the day of the installation, the workers bought along Class 1 material, which is the cheaper ones. Called the Salesman who wrote on the invoice as CLASS O and he try to give all sort of excuses, in the end, after I treaten to take them to CASE, he agreed to give me the CLASS 0 totaline as per invoice. GUESS WHAT... As the worker did not bring along the right material (CLASS 0), we were advised to make another appointment date to install the piping. THAT means 2 weeks for the 1st time, and now another 2 weeks of wait because of HIS MISTAKE that the wrong material was bought..TOTAL of 4 weeks to do up the PIPING.... give me the reason that all the schedule are packed... GUYS, you might want to be there during the installation date to make sure that they don’t cheat on you on the material...be it on purpose or not...which unfortunately happens to me... HAI, this kind of customer service really cannot make it... -
Yo chop chop share some pictures with us. Hmm.
-
Anyone had install instant water heater in our bathroom. Our Prefab toilet seem like cannot be drilled as it sound hollow. I'm worried that it might crack.
-
oh your TV console wall paper looks nice.
-
I intend to wall mount BOTH my LCD TV and DVD player in my MBR false wall to save some space as I dont intend to have any TV console. So far I think only Philips offer wall mount DVD Player. Anyone used it before ? I like to know if it is user friendly.. DVP6620 Hmm... Nice and slim ya, performance wise I don't expect much...
-
Sorry to hear that... Have a speedy recovery