Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Chawn Phats

Members
  • Content Count

    1
  • Joined

  • Last visited

Community Reputation

0 Neutral

About Chawn Phats

  • Rank
    Newbie

Previous Fields

  • Gender
    female

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

  1. Design Works Space planning & Optimization Project planning, Supervision & Management All Necessary Authority permit Application A Living area 1 Demolition Works 1.1 Supply labour & tools to demolition built-in furnitures $ 450.00 2 Flooring Work . 2.1 Supply labour and materia to fill new grouting for floor tiles $ 600.00 B Kitchen area 1 Demolition Works 1.1 Supply labour & tools to hack off existing wall tiles, flooring & skirting $ 700.00 1.2 Supply labour & tools to dismantle existing kitchen top cabinet . $ 150.00 2 Flooring Work . 2.1 Supply labour and materials to lay selected designer homogeneous floor tiles $ 1,200.00 includes cement screeding, chemical adhesive cement w/ skirting . (Tiles @ $3.00) 2.2 Supply labour & materials to provide HDB regulated water proofing membrane $ 300.00 layer using quic-seal 104 chemical & non-shrink screed . 3 Wall Work . 3.1 Supply labour and materials to plaster smooth kitchen wall $ 1,000.00 4 Carpentry work. 4.1 Design, fabricate & install (01) unit top kitchen cabinet . $ 1,490.00 *3D computerized perspective drawing provided Top cabinet Measurement: L 3400mm x D 300mm x Ht 900mm Materials: Solid plywood c/w high pressure laminate finishes & ABS edging door internal carcass in white PVC finishes . 5 Glass work 5.1 Supply & install (01) unit 6mm thk tempered glass backing for kitchen $ 400.00 in spray paint finish Measurement: L 3400mm x Ht 600mm C COMMON BATHROOM 1 Demolition Works 1.1 Supply labour & tools to hack off existing wall & floor tiles. $ 500.00 2 Masonry Works 2.1 Supply labour & materials to provide HDB regulated water proofing membrane $ 400.00 layer using quic-seal 104 chemical & non-shrink screed . 2.2 Supply labour & materials to lay selected designer matt surfaced $ 500.00 homogeneous floor tiles including cement, chemical adhesive cement, chemical strengthened bonding(W1) & colour grouting for tiles gap. (Tiles @ $3.00) 3 Wall Work . 3.1 Supply and lay selected designer homogeneous wall tiles $ 2,500.00 includes cement screeding, chemical adhesive cement, chemical strengthened bonding membrane ( W.1 ), grouting for tiles gap. (Tiles @ $3.00) 4 Plumbing Works 4.1 Supply labour & materials to lay conceal PVC drainage piping for wash basin & $ 150.00 shower area. 4.2 Supply labour & materials to provide installation of:- - toilet bowl x 01 $ 110.00 - wash basin x 01 $ 60.00 - gallon heater x 01 $ 120.00 - toilet accessories x 01 set $ 50.00 5 Doors & Window Work 5.1 Supply & install (01) unit white powder coated aluminium Naco window $ 180.00 5.2 Design, fabricate & install (01) unit PD door for toilet $ 500.00 5.3 Design, fabricate & install (01) unit 10mm tempered glass frameless fix panel $ 240.00 to separate toilet bowl & shower Measurement: L 600mm x Ht 1900mm D MASTER BATHROOM 1 Demolition Works 1.1 Supply labour & tools to hack off existing wall & floor tiles. $ 500.00 2 Masonry Works 2.1 Supply labour & materials to provide HDB regulated water proofing membrane $ 400.00 layer using quic-seal 104 chemical & non-shrink screed . 2.2 Supply labour & materials to lay selected designer matt surfaced $ 500.00 homogeneous floor tiles including cement, chemical adhesive cement, chemical strengthened bonding(W1) & colour grouting for tiles gap. (Tiles @ $3.00) 3 Wall Work . 3.1 Supply and lay selected designer homogeneous wall tiles $ 2,500.00 includes cement screeding, chemical adhesive cement, chemical strengthened bonding membrane ( W.1 ), grouting for tiles gap. (Tiles @ $3.00) 3.2 Supply labour and materials to construct 2 inc shower kerb $ 200.00 4 Plumbing Works 4.1 Supply labour & materials to lay conceal PVC drainage piping for wash basin & $ 150.00 shower area. 4.2 Supply labour & materials to provide installation of:- - toilet bowl x 01 $ 110.00 - wash basin x 01 $ 60.00 - toilet accessories x 01 set $ 50.00 5 Carpentry Works 5.1 Design, fabricate & install suspendered vanity using solid plywood c/w high pressure $ 300.00 laminate finish, ABS edging doors & internal carcass in white PVC finishes Measurement: L 600mm x D 550mm Measurement : 5.2 Supply labour & material to install solid surface work-top $ 200.00 Measurement: L 550mm x D 550mm Model : 6 Doors & Window work 6.1 Design, fabricate & install (01) unit PD door for toilet $ 500.00 6.2 Design, fabricate & install (01) unit 10mm tempered glass sliding door w/ fix panel $ 650.00 shower screen Approx. Measurement: L 1300mm x Ht 1900mm 6.3 Supply & install (01) unit white powder coated aluminium lourve window $ 180.00 E Painting work 1 Supply labour & materials to paint whole house 4+1 colour $ 1,500.00 F Miscellaneous/ Other works 1 Supply haulage to building materials & renovations debris FOC 2 Supply labour to disposal of construction debris to dumping ground FOC 3 Supply labour & materials to Lay corrugated protective sheet to all affected area $ 800.00 4 Supply labour for washing for entire unit $ 800.00 Sub Total: $ 21,000.00
×