Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Dominic

Members
  • Content Count

    8
  • Joined

  • Last visited

Everything posted by Dominic

  1. Hi,. Can I have the contact for your contractor? my email: dominicngyk@gmail.com Thanks....
  2. HI guys, recently been actively looking for ID or contractor for my resales 5rm flat. This is the recent quotation from one of the ID i approached. Can kindly help me to go thru to see whether is worth the value quoted? thousand thanks for your time and effort. =) A. Foyer Living & Dining Room 1 Supply labour & material to install "L" box with cove light structure in painting finishing L.S 920.00 $ B. Kitchen 1 Supply labour & equipment to hack exisitng Kitchen top & bottom cabinet, sink and accesoriess L.S 450.00 $ 2 Supply labour & equipment to hack existing kitchen fridge & washing base L.S 200.00 $ 3 Supply labour & materials to construct 50mm ht, Cabinet, Fridge & washing Machine mortar base L.S 580.00 $ 4 Design & Fabricate to install 20'L Kitchen top & bottom cabinet c/w soft close casement doors & '- , frosted pull up glass door, dish rack and external laminate finishing L.S 2,400.00 $ 5 Supply & Fabricate to install 10'L Quartz Surface work top on Kitchen bottom cabinet. L.S 1,100.00 $ 6 Supply labour & material to dismantle all existing water pipe @ Kitchen L.S 180.00 $ 7 Supply labour & material to install and rerun stainless steel expose pipe & drainage ( cold water only) L.S 450.00 $ 8 Supply labour to install new washing sink & connecting with Kitchen water tap and drainage paip L.S 250.00 $ 9 Supply labour to install new Kitchen hood & hod 01 set FOC C.Common bathroom 1 Supply labour & equipment to hack exisitng WC , basin and accesoriess L.S 200.00 $ 2 Supply labour & equipment to dismantle the existing water piping. L.S 180.00 $ 3 Supply labour & material to overlay heavy duty ceramic wall tiles at existing Bathroom walls ( base -on within $3.00 per sq ft tiles) (base on 8'ft height ) L.S 2,190.00 $ 4 Supply labour & material to overlay heavy duty homogeneuos tiles at existing Bathroom floor ( base -on within $3.00 per sq ft tiles) L.S 840.00 $ 5 Supply labour & material to replace and install new expose stainless steel cold water pipe for -whole bathroom. L.S 450.00 $ 6 Supply labour & equipment to install new 01 nos W.C, 01 nos washing basin, 02 nos of taps - & shower head L.S 320.00 $ 7 Supply labour & equipment to install new 01 nos of instant heater. 01 nos 70.00 $ 8 Supply labour & equipment to install simple bathroom accessories. (exclude rain shower) 01 set FOC D.Master bedroom 1 Supply labour & material to install "L" box with cove light structure in painting finishing L.S 690.00 $ 2 Design & fabricate to install approx 5'L x full height Tv feature wall in external laminate finishing 01 nos 1,060.00 $ 3 Design & fabricate to install approx 3' dressing table and mirror cabinet in external laminate finishing 01 nos 950.00 $ 4 Design & fabricate to install approx 7'L x full height wardrobe with casement doors , 3nos drawers , shelving, hanger, bars and external laminate finishing. 01 nos 1,820.00 $ E. Master bathroom 1 Supply labour & equipment to hack exisitng WC , basin and accesoriess L.S 200.00 $ 2 Supply labour & equipment to dismantle the existing water piping. L.S 180.00 $ 3 Supply labour & material to overlay heavy duty ceramic wall tiles at existing Bathroom walls ( base -on within $3.00 per sq ft tiles) L.S 2,190.00 $ 4 Supply labour & material to overlay heavy duty homogeneuos tiles at existing Bathroom floor ( base -on within $3.00 per sq ft tiles) L.S 840.00 $ 5 Supply labour & material to replace and install new expose stainless steel cold water pipe for -whole bathroom. L.S 450.00 $ 6 Supply labour & equipment to install new 01 nos W.C, 01 nos washing basin, 02 nos of taps - & shower head L.S 320.00 $ 7 Supply labour & equipment to install new 01 nos of instant heater. 01 nos 70.00 $ 8 Supply labour & equipment to install simple bathroom accessories. (exclude rain shower) 01 set FOC F. Master bathroom Qty Amount I. General works scope and materials 1 Supply labour and Nippon emulsion paint for whole house walls & ceilings L.S 1,500.00 $ 2 Supply labour and material to lay of Flooring Protection L.S 300.00 $ 4 Supply labour to upload building material. L.S 450.00 $ 5 Supply labour & transport to disposal of debris to NEA designated dumping site L.S 300.00 $ 6 General cleaning for the Whole Apartment before handing over of project L.S FOC Total : $22100.00
  3. Hi, Can i know how much the renovation cost u? and can i have the contact as well? thanks! my email is dominicngyk@gmail.com
  4. HI Jimmy, your quotation seem very attractive. can i get the ID co. from u? thanks..
×