-
Content Count
122 -
Joined
-
Last visited
Content Type
Profiles
Forums
Gallery
Everything posted by slashmylove
-
Day 50 (no picture update) Last Saturday, went to our unit to clean a bit cos the fridge and washing machine were going to be delivered.. at least the area there need to be clean so bo bian we had to clean.. lol.. the whole house reno is completed. ID requested us to lend him till end Nov as showroom so we also don't know when can we move in, cos I want my curtains to be up before arranging the furniture delivery. Must ask for discount la!! cos he using my unit as showroom is affecting my move-in.. lol Had managed to contact Vincent who had many positive reviews on this forum and he responded really fast. Took measurements etc and said that it would be ready by end Nov. Quite good so far! No pictures cos nothing else changed.. except that the kithen's glass door and common toilet's shower screen up. that's all for now!
-
Day 36 Seems like more or less done.. left with the glass in common toilet and kitchen glass door. And painting touch up again... I have a question though, I remembered seeing one T-blog with a similar issue - is this gap for the cooker hood acceptable? It's gonna be difficult to clean right? :x The other issues raised earlier were more or less fixed. The "empty" switch - fixed a light at the original light point cos cannot re-direct the electrical wiring liao. My photos all very blurred so no photos haha! The connecting joint between the tiles & bedrooms' vinyl cannot be put cos it would be too high, and the door would not be able to close. Have to live with it, although the joining part between the tiles and MBR vinyl is a little ugly... sigh... Finally settled my curtains! After searching high and low, finally got Vincent's contact through a fellow forummer and contacted him. Messaged him last week & he called back shortly after, fixed an appointment last Saturday (5 Nov 2016). Took measurements, decided on material and agreed on price. He said it would be ready for installation by end Nov, which the chemical washing have to be done by then, cos he would directly hang the curtains liao. No issues with us though.
-
Our First Reno Journey
slashmylove replied to osiris7777's topic in Reno t-Blog Chat - HDB BTO Interior Design and Renovation
Havent seen the unit but I don't think so cos he said the gap is too small, if do, need to change door -.- -
Our First Reno Journey
slashmylove replied to osiris7777's topic in Reno t-Blog Chat - HDB BTO Interior Design and Renovation
Mine initially had the joining between the tiles and vinyl.. But now cannot put, the ID said it's too high, if put will block the door. Sigh. I would expect the ID, being the professional, to foresee this and let us know in advance lor.. Cos the joining between the tiles & MBR vinyl is quite ugly to me -
Quick update as of Day 31 Anyway, pertaining to my previous comments, the ID had fixed it but we haven't gone to check (very busy with wedding stuff). The TV wall laminate issues - will change the laminate. The MBR wardrobe laminate issue - the switch will cover so no problem. Slanted cabinet door in kitchen will be fixed. The empty switch **** room - will fix a light at the original lighting point cos now cannot connect to the downlight liao but no additional charge, just that we have to buy another light. Think that's about it. Till this weekend then I go see then can update again.....
-
Hi, I'm using Nippon Paint. For living room & MBR - smoky (light grey) and dauphin grey (the darker grey). BR 2 - I cannot find the name, the code number should be 5065. BR 3 - peach silk (but looks more pink than what I would have preferred - wanted a really light pink but this was recommended by ID cos he said the colour nicer). HTHs!
-
If only I'd seen your T-blog earlier! Now that my reno is coming to a close I don't think I would bother to change anything in the near future (lazy) so gotta wait a while already... haha! Thanks for sharing!! I appreciate in envy~~~
- 120 replies
-
- maisonette
- family
-
(and 1 more)
Tagged with: