Thank for highlighting. Before I engaged this contractor for my reno, he has showed case his stuff and his coordinating plan, and even indicated that 2D drawing will be provided upon request. We trust him so much but end up with disappointment and regret. For drawing, we only request for 2D drawing and didn't except ID standard. As I believe all contractors will need the drawing with measurement to build the furniture. We even provide sample design and photo to him to prevent any mis-understanding. All I can said is a very painful experience learn.
-
Thank for highlighting. Before I engaged this contractor for my reno, he has showed case his stuff and his coordinating plan, and even indicated that 2D drawing will be provided upon request. We trust him so much but end up with disappointment and regret. For drawing, we only request for 2D drawing and didn't except ID standard. As I believe all contractors will need the drawing with measurement to build the furniture. We even provide sample design and photo to him to prevent any mis-understanding. All I can said is a very painful experience learn.
-
We find out that he is not a HDB registered after so many issues happen in the 1st phase of the reno We trusted the work and experience that he has shared with us and also our first time to have the reno for our house. It is a very painful experience learn that we should not trust him and should do a diligence homework. Now my family have to under go these mental torture while staying there.
-
important items of the reno: 1) electrical 2) Tile work 3) Plumbing he cant even meet the require standard. 1) electrical- he just arranged for electrical guys onsite but never give instruction how, where to lay the outlet and became my job to coodinate. worst, gave me wrong infor and resulted power outlet in my build in wardrobe have to shift. 2) Tile Work-before reno start he said that he will ensure workmanship up to standard. but still have so many hollow tiles and have to chase after him to recfty it. even his sub contractor also surprise that the tiles are easily removed. 3) Plumbing from the 1st post pic already spell out the standard. hiaz.
-
Reno my dream home should be a exciting and looking forward but it become a problematic nightmare with this contractor. from the start of the reno, issues arise one after another and this contractor has misuse my trust. Asked for drawings after our discussion, kept delaying and gave a lot execuses. He kept saying that he will build according to our agreed plan and then act blur until the 1st set of furnture is installed . Then I found out so many issues with it. Then finally gave me a out-dated drawing when I butter him, and kept giving excuses that he thought the drawing has passed it to me. I have told him that my objective for customise furnture is to have extra storages. When the 1st set of furnture installed, I were shocked that there was a big gap between the wall and the cupboard. And he just kept giving a lot of excuses that there was existing furnture and unable to get the correct measurement which all these were estimated. Plumber was engaged by him that gave me another issue. pipelines are not completed install on fri and will have to wait until Monday to be completed. But the plumber neither secure properly Nor cover up è wrong drilled hole at the end of the day and just left it. The worst nightmare was when I turned on the main water source, the whole pipe hang loosely and broke that resulted my toilet flooded. flood with water. Everyone is looking forward for their reno to be done beautifully. but this contractor gave me issues one after another and it became a nightmares to me and my family. All I wished that the Reno will end asap as I already wear out ironed out these issues with the contractor. Even wall tile also became problematic, hollow sound can be heard when I did my check. Kept asking him to recify, and he kept giving justified that it wont fall. until i have to force him to recifty it before I took legal action against him. When the worker rectifying è tiles, it seem that the tiles can be easily take down by just a few knocks.
-
from reno to a dream home become a problematic nightmare. from the start of the reno, this contractor has been giving me issues, one after another and misuse my trust. Ask for drawings after our discussion, keep delay and gave execuses or said he will build according to our agreedment and act blur until the 1st set of furnture installed with many issues. Then finally gave me a out-dated drawing and said that he thought that he has passed it to me. told him that my objective to have customise furnture with more storage. But 1st set furnture, leave such a big gap from the wall. And give alot of reasons that there is existing furnture and cant get the measurement. Plumber engaged by him also installed the pipes incomplete and never secure properly and cover up è wrong hole drilled end of the day. at least keep everything neat and secure even it is not complete. resulted that my toilet flood with water. Everyone look forward for their reno beautifully done. but with this contractor, gave me issues and nightmares everyday that i wished it end soon. Even wall tile also got problem, hollow sound can be heard. ask him to recify. keep giving reason that it wont fall. until i have to force him then he will recifty it. è tiles can be easily take down.