First time handling renovation on my own, need some help to clarify some details as follows;
1. Do i need to get electrician to standby the open wirings to all the downlight points before i get the L-box installer to come in? What should the sequence be?
2. Do i engage electrician to open hole in the L-box to install the downlights for me? Otherwise what kind of contractor do i need to engage?
3. Do downlights come in different sizes? Do i have to buy the downlights and take the dimensions first before calling in the electrician and the ceiling contractors?