Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

Tan Leng

Members
  • Content Count

    1
  • Joined

  • Last visited

Everything posted by Tan Leng

  1. Four room new bto 1) Masonry work Construct 50mm kitchen cabinet cement mortar base c/w side tiling Construct 50mm fridge cement mortar base c/w full tilng Construct 50mm washing machine cement mortar base c/w full tiling 2) Paint works Painting of internal wall ( vinilex 5000) Painting of all pipe with nippon gloss pain 3) Plumbing works extension of stainless-steel piping for kitchen sink and washing machine laying of drainage pipe for kitchen sink and washing machine supply labour to install kitchen sink & tap supply labour to install 2 set of instant heater supply labour to install 2 set of bathroom accessories 4)Carpentry work design & fabricate 20 ft kitchen cabinet in laminate finish c/w abs trimming swing door with stainless steel dish rack, using excel runner (laminate up to $58) supply and install 10 ft solid surface worktop supply labour to install cooker hood and hob design and fabricate 6 ft full height wardrobe in laminate 5)Miscellaneous work Floor protection with corrugated cardboard on affected area general cleaning upon completion of works Sub-Total: $8,088 To supply material and material to lay self-leveling in the following area : living/dining - 660 ( $2 * 330 sqft) masterbedroom - 292 ( $2 * 146 sqft) bedroom 2 - 216 ($2 * 108 sqft) bedroom 3 - 216 ($2 * 108 sqft) To supply material and labour to lay 5mm vinyl flooring (HERF) w/o skirting in the following area living/dining - 1815 ( $5 *363 sqft) masterbedroom - 805 ( $5 * 146 sqft) bedroom 2 - 595 ($2 * 108 sqft) bedroom 3 - 595 ($2 * 108 sqft) Sub total - $5334 Total 13422 Disc 222 After disc 13200
  2. hi darren,

     

    can i have ur id contact please? thanks

×