  1. Hey guys I am actually renovating my room. There would be custom wadrobes and study table platform bed. The quptations is as belows.

    TO PROPOSED BEDROOM (3) CARPENTRY WORKS

    AS FOLLOW;

     

    Carpentry Works

     

    To supply labour, tools & materials to fabricate & install solid platform bed c/w pull                       $1,700

    out drawer panel with abs edging using selected laminated finish.

    (Approx size: L-2500mm x D-1500mm x H-400mm.)

     

    To supply labour, tools & materials to fabricate & install display book shelf                                     $880

    cabinet using selected laminated finish.

    (Approx size: L-1500mm x D-300mm x H-2150mm.)

     

    To supply labour, tools & materials to fabricate & install study table c/w pull out drawer                 $700

    using selected laminated finish.

    (Approx size: L-1500mm x D-500mm x H-760mm.)

     

    To supply labour, tools & materials to fabricate wall mount open shelving using selected                 $380

    Laminated finish.

    (Approx size: L-600mm x D-300mm x H-50mm.)

     

    To supply labour, tools & materials to fabricate & install casement swing door cabinet using           $2,160

    selected laminated finish, Internal carcass come with shelving/drawer panel & aluminium hanging

    rod finishing with white pvc panel.)

    (Approx size: L-2700mm x D-600mm x H-2600mm.)

     

    Electrical Works

     

    To supply labour and tools to install ceiling fan. F.O.C

    To supply labour , tools & materials to hack wall to conceal track light, lighting point                       $280

    come with 2 gan lighting switch at bedroom 3.

    To supply labour, tools & materials to shift & install 2x13A double power point .                              $180  

    x 2 nos. at bedroom 3

     

                                                                                                                    Grand Total:     $6,280

                                                                                                                              

    Guys, what do you think?


  2. Hello fellow members of Renotalk. Sorry for hijaking your thread. I tried to create my own thread but there seemed to be some error. Moderator, If you could move this post to a new thread please do so. Thanks!

    I am particularly new to this scene as this is my first time renovating my house after 20 years. Was given a quote by an ID/Contractor. Could you gurus please take a look to see if it is acceptable? I decided to renovate my kitchen and 2 toilets. The quotations are as such below:

     

    No

    Description Amount


     

    A.

     

    a.)

    1.

     

    2.

     

    3.

     

    4.

     

    5.

     

    6.

     

    b.)

     

    1.

     

    2.

     

    3.

     

    4.

     

    5.



     

    c.)

     

    1.

     

    2.

     

    3.

     

    4.

     

    B.

     

    a.)

    1.




     

    2.




     

    3.



     

    4.

     

    5.



     

    C.

     

    1.

     

    2.

     

    D.

     

    a.)

    1.

     

    2.

    3.



     

    4.

     

    b.)

    1.

     

    2.

    3.

     

    4.

    5.

     

    6.

     

    c.)

    1.

     

    2.

    3.

    4.

    5.

     

    6.

     

    E.

     

    1.

    2.

    3.

     

    4.

     

    5.

     

    F.

    1.

     

    G.

    1.

     

    H.

    1.

     

    I.

    1.

     

    J.

    1.




     

    2.

     

    3.

     

    4.

     

    5.

    6.

    7.

    MASONRY WORKS

     

    @Kitchen

    To supply labour, tools & materials to install waterproofing screeding at kitchen $380

    floor and wall area.  

     

    To supply labour, tools & materials to top up floor & wall leveling using prepack 3 in 1 mix $700

    cement/sand at kitchen flooring.

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) heavy duty homogenous $2,150

    floor tiles at kitchen floor. (215 sqft.)

     

    To supply labour, tools & materials to lay (Size: 300mmx 600mm) homogenous/ceramic wall $4,850

    Tiles at kitchen wall. (approx. wall area 485 sqft.)

     

    To supply labour, tools & materials to construct kitchen cabinet concrete base at kitchen. $450

     

    To supply labour, tools & materials to install waterproofing screeding at kitchen $380

    floor and wall area.  

     

    @Master Toilet

     

    To supply labour, tools & materials to install waterproofing screeding at master toilet floor $180

    and wall area.  

     

    To supply labour, tools & materials to top up floor and wall leveling using prepack 3 in 1 $900

    cement/sand  at master toilet.

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous floor tiles $1,100

    at master toilet. (Approx area 68 sqft.)

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous wall tiles $2,800

    at master toilet. (Approx area 280 sqft.)

     

    To supply labour, tools & materials to construct shower kerb at master toilet. $190

     

    -2-

    @Common Toilet

     

    To supply labour, tools & materials to install waterproofing screeding at common toilet floor $200

    and wall area.  

     

    To supply labour, tools & materials to top up floor and wall leveling using prepack 3 in 1 $900

    cement/sand  at common toilet.

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous floor tiles $950

    at common toilet. (Approx area 55 sqft.)

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous wall tiles $2,600

    at common toilet. (Approx area 260 sqft.)

     

    CARPENTRY WORKS

     

    @Kitchen

    To supply labour, tools & materials to fabricate & install top hung kitchen cabinet using               $2,805

    selected laminated finish c/w swing door panel with abs edging internal carcass using

    white pvc panel with adjustable shelf.

    (Approx size: L-25.5ft. s D-1 ft. x H-1150mm.)

     

    To supply labour, tools & materials to fabricate & install Bottom kitchen cabinet using $2,420

    selected laminated finish c/w swing door & drawer panel with abs edging internal carcass using

    white pvc panel with adjustable shelf.

    (Approx size: L-22 ft. s D-2 ft. x H-830mm.)

     

    To supply labour, tools & materials to fabricate & install tall unit cabinet c/w swing $720

    door panel with abs edginginternal carcass using white pvc panel.

    (Approx size: L-6 ft. s D-1 ft. x H-1150mm.)

     

    To supply labour, tools & materials to install 4 sets heavy duty soft close drawer $300

    track at kitchen cabinet.

     

    To supply labour, tools & materials to fabricate & install suspended vanity cabinet c/w swing $400

    door panel  using selected laminated finish at master toilet.

    (Approx size: L-3.5 ft. x D- 400mm x H-500mm.)

     

    QUARTZ STONE @KITCHEN

     

    To supply labour, tools & materials to install Quartz stone work top at kitchen cabinet. $2,420

    (Approx size: L-22 ft. x D-2 ft. x 20mm height profile.)

     

    To supply labour, tools & materials to install Quartz stone work top at vanity cabinet. $350

    At master toilet. (Approx size: L-3.5 ft. x D-2 ft. x 20mm height profile.)

     

    PLUMBING WORKS

     

    @Kitchen

    To supply labour, tools & materials to install exposed (cold) stainless steel water inlet piping $680

    Work at kitchen sink & washing machine.

     

    To supply labour and tools to install kitchen sink & water tap mixer.                                                 $150

    To supply labour and tools & install new 40mm water outlet pvc piping works at kitchen sink $300

    and washing machine.

    -3-

     

    To supply labour and  tools to install water tap for washing machine. $120

     

    @Master Toilet

    To supply labour, tools & materials to install exposed (Hot/Cold) stainless steel water inlet $300

    piping work at master toilet.

     

    To supply labour and tools to install wash basin & hot/cold water tap mixer at master toilet. $150

    To supply labour and tools & install new 40mm water outlet pvc piping works at wash basin $150

    at master toilet.

    To supply labour and  tools to install water tap for washing basin at master toilet. $150

    To supply labour, and tools to install spray gun c/w stainless steel water piping work c/w on/off $120

    Mini vale at master  toilet.    

    To supply labour, tools & materials to install instant water heater at master toilet. $120

     

    @Common Toilet

    To supply labour, tools & materials to install exposed (Hot/Cold) stainless steel water inlet $300

    piping work at common toilet.

     

    To supply labour and tools to install wash basin & hot/cold water tap mixer at common toilet. $150

    To supply labour and tools & install new 40mm water outlet pvc piping works at wash basin $150

    To supply labour and  tools to install water tap for wash basin at common toilet. $150

    To supply labour, and tools to install spray gun c/w stainless steel water piping work c/w on/off $120

    Mini vale at common toilet.    

    To supply labour, tools & materials to install instant water heater at common toilet. $120

     

    ELECTRICAL WORKS

     

    To supply labour, tools & materials to install new lighting point at kitchen. $120

    To supply labour, tools & materials to install new lighting point at common toilet. $120

    To supply labour, tools & materials to install new (2 x 13A) double power point x 4 nos. $720

    at kitchen

    To supply labour, tools & materials to install new cooker hood power point 1 x 20A $120

    on/off switch at kitchen.

    To supply labour, tools & materials to install new (1 x 20A) water heater power point c/w $190

    on/off switch socket at common toilet.

     

    GENARAL CLEANING WORK

    To supply labour and tools  to provide acid cleaning to upon completion of all works. $400

     

    PAINTING WORKS

    To supply labour, tools & materials to paint kitchen and part of living room cornices $600

    ceiling using NIPPON paint finish.

     

    CEILING WORKS

    To supply labour, tools & materials to install simple cornices **** room. $400

     

    SHOWER SCREEN

    To supply labour, tools & materials to install 10mm thick tempered clear glass shower screen $580

    c/w 1 fx and 1 panel swing door panel at master toilet.

     

    PD DOOR

    To supply labour, tools & materials to install powder coated Aluminium frame with acrylic             $760

    panel PD door  at master & common toilet.

     

    -4-

     

    To supply labour, tools & materials to install powder coated aluminium frame with acrylic             $680

    panel PD door  at kitchen entrance.

     

    To supply labour, tools & materials to install new aluminium frame with clear glass                        $180

    casement window at master toilet.

     

    To supply labour, tools & materials to install new aluminium frame with clear glass                       $180

    casement window at common toilet.

     

    To supply labour, tools & materials to install ceiling fan at bedroom.                                                F.O.C

    To supply labour, tools & materials to install ceiling fan **** room.                                           F.O.C

    To supply labour, tools & materials to install 1 no. power point **** room.                                F.O.C

     

                                                                                                                    

                                                                                                 Grand Total Amount $:     $36,125

                                                                                           

     

     

     

    Please give me your valuable advice. Thanks alot!


  3. Hello fellow members of Renotalk. Sorry for hijaking your thread. I tried to create my own thread but there seemed to be some error. Moderator, If you could move this post to a new thread please do so. Thanks!

    I am particularly new to this scene as this is my first time renovating my house after 20 years. Was given a quote by an ID/Contractor. Could you gurus please take a look to see if it is acceptable? I decided to renovate my kitchen and 2 toilets. The quotations are as such below:

     

    No

    Description Amount


     

    A.

     

    a.)

    1.

     

    2.

     

    3.

     

    4.

     

    5.

     

    6.

     

    b.)

     

    1.

     

    2.

     

    3.

     

    4.

     

    5.



     

    c.)

     

    1.

     

    2.

     

    3.

     

    4.

     

    B.

     

    a.)

    1.




     

    2.




     

    3.



     

    4.

     

    5.



     

    C.

     

    1.

     

    2.

     

    D.

     

    a.)

    1.

     

    2.

    3.



     

    4.

     

    b.)

    1.

     

    2.

    3.

     

    4.

    5.

     

    6.

     

    c.)

    1.

     

    2.

    3.

    4.

    5.

     

    6.

     

    E.

     

    1.

    2.

    3.

     

    4.

     

    5.

     

    F.

    1.

     

    G.

    1.

     

    H.

    1.

     

    I.

    1.

     

    J.

    1.




     

    2.

     

    3.

     

    4.

     

    5.

    6.

    7.

    MASONRY WORKS

     

    @Kitchen

    To supply labour, tools & materials to install waterproofing screeding at kitchen $380

    floor and wall area.  

     

    To supply labour, tools & materials to top up floor & wall leveling using prepack 3 in 1 mix $700

    cement/sand at kitchen flooring.

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) heavy duty homogenous $2,150

    floor tiles at kitchen floor. (215 sqft.)

     

    To supply labour, tools & materials to lay (Size: 300mmx 600mm) homogenous/ceramic wall $4,850

    Tiles at kitchen wall. (approx. wall area 485 sqft.)

     

    To supply labour, tools & materials to construct kitchen cabinet concrete base at kitchen. $450

     

    To supply labour, tools & materials to install waterproofing screeding at kitchen $380

    floor and wall area.  

     

    @Master Toilet

     

    To supply labour, tools & materials to install waterproofing screeding at master toilet floor $180

    and wall area.  

     

    To supply labour, tools & materials to top up floor and wall leveling using prepack 3 in 1 $900

    cement/sand  at master toilet.

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous floor tiles $1,100

    at master toilet. (Approx area 68 sqft.)

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous wall tiles $2,800

    at master toilet. (Approx area 280 sqft.)

     

    To supply labour, tools & materials to construct shower kerb at master toilet. $190

     

    -2-

    @Common Toilet

     

    To supply labour, tools & materials to install waterproofing screeding at common toilet floor $200

    and wall area.  

     

    To supply labour, tools & materials to top up floor and wall leveling using prepack 3 in 1 $900

    cement/sand  at common toilet.

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous floor tiles $950

    at common toilet. (Approx area 55 sqft.)

     

    To supply labour, tools & materials to lay (Size: 300mm x 600mm) homogenous wall tiles $2,600

    at common toilet. (Approx area 260 sqft.)

     

    CARPENTRY WORKS

     

    @Kitchen

    To supply labour, tools & materials to fabricate & install top hung kitchen cabinet using               $2,805

    selected laminated finish c/w swing door panel with abs edging internal carcass using

    white pvc panel with adjustable shelf.

    (Approx size: L-25.5ft. s D-1 ft. x H-1150mm.)

     

    To supply labour, tools & materials to fabricate & install Bottom kitchen cabinet using $2,420

    selected laminated finish c/w swing door & drawer panel with abs edging internal carcass using

    white pvc panel with adjustable shelf.

    (Approx size: L-22 ft. s D-2 ft. x H-830mm.)

     

    To supply labour, tools & materials to fabricate & install tall unit cabinet c/w swing $720

    door panel with abs edginginternal carcass using white pvc panel.

    (Approx size: L-6 ft. s D-1 ft. x H-1150mm.)

     

    To supply labour, tools & materials to install 4 sets heavy duty soft close drawer $300

    track at kitchen cabinet.

     

    To supply labour, tools & materials to fabricate & install suspended vanity cabinet c/w swing $400

    door panel  using selected laminated finish at master toilet.

    (Approx size: L-3.5 ft. x D- 400mm x H-500mm.)

     

    QUARTZ STONE @KITCHEN

     

    To supply labour, tools & materials to install Quartz stone work top at kitchen cabinet. $2,420

    (Approx size: L-22 ft. x D-2 ft. x 20mm height profile.)

     

    To supply labour, tools & materials to install Quartz stone work top at vanity cabinet. $350

    At master toilet. (Approx size: L-3.5 ft. x D-2 ft. x 20mm height profile.)

     

    PLUMBING WORKS

     

    @Kitchen

    To supply labour, tools & materials to install exposed (cold) stainless steel water inlet piping $680

    Work at kitchen sink & washing machine.

     

    To supply labour and tools to install kitchen sink & water tap mixer.                                                 $150

    To supply labour and tools & install new 40mm water outlet pvc piping works at kitchen sink $300

    and washing machine.

    -3-

     

    To supply labour and  tools to install water tap for washing machine. $120

     

    @Master Toilet

    To supply labour, tools & materials to install exposed (Hot/Cold) stainless steel water inlet $300

    piping work at master toilet.

     

    To supply labour and tools to install wash basin & hot/cold water tap mixer at master toilet. $150

    To supply labour and tools & install new 40mm water outlet pvc piping works at wash basin $150

    at master toilet.

    To supply labour and  tools to install water tap for washing basin at master toilet. $150

    To supply labour, and tools to install spray gun c/w stainless steel water piping work c/w on/off $120

    Mini vale at master  toilet.    

    To supply labour, tools & materials to install instant water heater at master toilet. $120

     

    @Common Toilet

    To supply labour, tools & materials to install exposed (Hot/Cold) stainless steel water inlet $300

    piping work at common toilet.

     

    To supply labour and tools to install wash basin & hot/cold water tap mixer at common toilet. $150

    To supply labour and tools & install new 40mm water outlet pvc piping works at wash basin $150

    To supply labour and  tools to install water tap for wash basin at common toilet. $150

    To supply labour, and tools to install spray gun c/w stainless steel water piping work c/w on/off $120

    Mini vale at common toilet.    

    To supply labour, tools & materials to install instant water heater at common toilet. $120

     

    ELECTRICAL WORKS

     

    To supply labour, tools & materials to install new lighting point at kitchen. $120

    To supply labour, tools & materials to install new lighting point at common toilet. $120

    To supply labour, tools & materials to install new (2 x 13A) double power point x 4 nos. $720

    at kitchen

    To supply labour, tools & materials to install new cooker hood power point 1 x 20A $120

    on/off switch at kitchen.

    To supply labour, tools & materials to install new (1 x 20A) water heater power point c/w $190

    on/off switch socket at common toilet.

     

    GENARAL CLEANING WORK

    To supply labour and tools  to provide acid cleaning to upon completion of all works. $400

     

    PAINTING WORKS

    To supply labour, tools & materials to paint kitchen and part of living room cornices $600

    ceiling using NIPPON paint finish.

     

    CEILING WORKS

    To supply labour, tools & materials to install simple cornices **** room. $400

     

    SHOWER SCREEN

    To supply labour, tools & materials to install 10mm thick tempered clear glass shower screen $580

    c/w 1 fx and 1 panel swing door panel at master toilet.

     

    PD DOOR

    To supply labour, tools & materials to install powder coated Aluminium frame with acrylic             $760

    panel PD door  at master & common toilet.

     

    -4-

     

    To supply labour, tools & materials to install powder coated aluminium frame with acrylic             $680

    panel PD door  at kitchen entrance.

     

    To supply labour, tools & materials to install new aluminium frame with clear glass                        $180

    casement window at master toilet.

     

    To supply labour, tools & materials to install new aluminium frame with clear glass                       $180

    casement window at common toilet.

     

    To supply labour, tools & materials to install ceiling fan at bedroom.                                                F.O.C

    To supply labour, tools & materials to install ceiling fan **** room.                                           F.O.C

    To supply labour, tools & materials to install 1 no. power point **** room.                                F.O.C

     

                                                                                                                    

                                                                                                 Grand Total Amount $:     $36,125

                                                                                           

     

     

     

    Please give me your valuable advice. Thanks alot!

×