Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

ckthebunny

Members
  • Content Count

    36
  • Joined

  • Last visited

Everything posted by ckthebunny

  1. Kitchen lights in progress: Can somebody share with me how does ur contractor hide the cables wiring for the LED strip ? and for power sockets how is it sealed? Mine is like loose - when i try to unplug the charger the whole power socket seems to be falling off I don't have an ID or main con ... Hope someone can help me out
  2. HI There... able to share ur gate contractor details and damage for it?
  3. i bought the fan aeratron AE3 Dark Woodgrain from another shop near Tampoi for about ringgit 1600 .. I don't have it with me now but i can find the shop for u if u keen let me know all Downlights are philips from tampoi .. (Tampoi has that fan too) Beware on the tax for bringing more than 150sgd worth of goods into SG, thats y i didn't buy all from tampoi
  4. i search a couple of places over the past few months before deciding on this, looking forward to end progress Hope it matches with my Tv & Tv Cabinet!
  5. Rectified oven carpentry: Finally confirmed our marble feature work can book match some more: other side: Bed room carpentry is up as well: for our TV and dresser: finally my reno is moving ;')
  6. ur marble done already? can share pic ? i am still looking .. waiting for supplier price
  7. Some updates finally: Painting works completing in 01 days time =D Carpentry in progress - Shoe cabinet and store room: Carpentry in progress - kitchen: A little screwup but can be rectified:
  8. hahha no budget buy one whole slab.. .. for the above is abt 60 bucks per piece, 600 by 600 .. can anyone tell me is that expensive?
  9. Thanks Changbp! Updates: Electrical almost done: quite cmi -_- Went Marble shopping last week.. Am planning to do a marble feature wall =D Eyeing on this: coz i fell in love with this: Duno how end result will be
  10. I think i will ask them to redo .. but for pic 5 i had the same problem too, after we feedback to the tiler, they came back to kinda polish/smoothen n at least the rough edges are smoother and not so obvious liao. Pic 2, 3 and pic 7 - i can understand ur frustration, frankly i cannot accept it. To me, its very clear this is a NEW JOB , new tiles . Paying the price for a brand new job, so don't give me the work of a touch up job Suggest that u mark all these areas and make ur ID rectify - thats his job. Obviously he failed to coordinate resulting in drilling the wrong location
  11. Hi Changbp, do you mind sharing with me your contact that installed for you and how much was the installation ?
  12. bought Ao Smith heater but headache ah.. the pipe duno how to run also will kena my toilet window . sian half Any suggestions here??
  13. 1800 for the pre pack cement materials, labour about 6.3- 2 toilets and kitchen wall + floor Think i kinda overspend on tiles, my tiles were about 5k
  14. Walk in closet: Been looking around but seems like carpentry all very ex so decided to do a pole system and enclose it with glass later on Proposed location in bedroom 2: Proposed layout: Estimated cost about 1k for this setup without glass door enclosure
  15. No idea what is it for, all units in my blk has them in the service balcony.. Faults unavoidable one lah, even my brand new tiles some already chipped, luckily not obvious for me coz my tiles got pattern so not very obvious
×