Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

sonic84

Members
  • Content Count

    11
  • Joined

  • Last visited

Community Reputation

0 Neutral

About sonic84

  • Rank
    Bronze Member

Previous Fields

  • Gender
    Male

Recent Profile Visitors

728 profile views
  1. My personal encounter with J&E is very bad. Call them never pick up, whatsapp Edmund and it takes 2 days to reply although whatsapp shows he has read my message. Every messages take more than 1 day to reply and eventually just disappeared and I also don't bother to msg him anymore. I think business must be good for them but their customer service is very bad!
  2. Hi Kenoro, mind to share the total renovation cost and ur ID's contact? Thanks!
  3. hi! able to pm me your id's contact details please? thanks in advance!
  4. Hi all, I have just collected my keys 2 weeks ago and having no experience in renovation, would like to ask if the following quotation is reasonable? Please highlight which items are overpriced if possible. Thanks in advance! ADDITIONAL WORKS DEMOLITION WORKS Unit Amount Total Hack off 5.5 ft half wall at kitchen------------------------------------------------------------------------------------------------------------------------- $250 MASONRY WORKS (tiles at $3.5 or below) Supply and construct kitchen cabinet base with side tile finishing ------------------------------------------------------------------------------- $450 Supply and lay 600 x 600 homogenous floor tile for living, dining, corridor walkway ---------------345-----------------7-----------------$2,415.00 Supply and lay 100% waterproof vinyl flooring for master room (cement screed by HDB) -------184-----------------5.5---------------$1,012.00 Supply and lay 100% waterproof vinyl flooring for bedroom 2 (cement screed by HDB) ---- -----121-----------------5.5---------------$665.50 Supply and lay 100% waterproof vinyl flooring for bedroom 3 (cement screed by HDB) ----------117-----------------5.5---------------$643.50 Supply and install 4" parquet skirting for living, dining, corridor, bedroom 2, bedroom 3----------199-----------------5.5---------------$1,094.50 Supply and apply 3 in 1 prepack cement screed for whole house (hdb required) -------------------------------------------------------------$1,035.00 Touch up and make good kitchen hacked wall (plaster and replace affected tile)-------------------------------------------------------------$280.00 CARPENTRY WORKS (solid plywood with internal white PVC, BLUM hinge included) Kitchen Design and fabricate 7 ft kitchen top cabinet in laminate finish---------------------------------------------7-------------------120---------------$840 Design and fabricate 12 ft kitchen bottom cabinet in laminate finish (both side)----------------------12-------------------120---------------$1,440.00 Supply and install 12 ft crystal quartz top with backsplash----------------------------------------------- --12------------------120---------------$1,440.00 Supply and install tempered glass backing in between kitchen cabinet---------------------------------------------------------------------------$450.00 Design and fabricate 2 ft tall unit in laminate finish-----------------------------------------------------------------------------------------------------$720.00 Living Design and fabricate 10 ft full height tv feature wall in laminate finish (partial glass finish)---------10--------------------350-------------$3,500.00 Design and fabricate 8 ft suspended tv console in laminate finish-----------------------------------------8---------------------130-------------$1,040.00 Design and fabricate 3 ft full height shoe cabinet in laminate finish----------------------------------------3---------------------260-------------$780.00 Design and fabricate 3 ft full height glass display unit---------------------------------------------------------3---------------------450-------------$1,350.00 Supply and install STACO wall panel **** area (brick type)-------------------------------------------------------------------------------------------$1,850.00 Supply and install full height clear mirror at dining area------------------------------------------------------------------------------------------------$480.00 Master Bedroom Design and fabricate 11 ft full height L-shaped casement wardrobe in laminate finish---------------11--------------------280-------------$3,080.00 : with internal small dressing table Design and fabricate 5 ft full height simple tv feature wall in laminate finish (with cove holder)-----5---------------------180-------------$900.00 Design and fabricate 5 ft suspended tv console in laminate finish------------------------------------------5---------------------130--------------$650.00 Bedroom 2 Design and fabricate 5 ft full height casement wardrobe in laminate finish-------------------------------5----------------------240-------------$1,200.00 PLUMBING WORKS Supply and modify hot & cold water pipe for city gas heater at service yard-----------------------------------------------------------------------$180.00 Supply labour to install 1 nos kitchen sink and tap--------------------------------------------------------------------------------------------------------$120.00 Supply labour to install toilet accessories for both toilet --------------------------------------------------------------------------------------------------FOC ALUMINIUM / GLASS WORKS Supply and install aluminium 3 tracks sliding window at service yard-------------------------------------------------------------------------------$620.00 Supply and install AUSTSCREEN BUMPFREE tempered sliding shower screen for master bathroom-----------------------------------$640.00 Supply and install AUSTSCREEN BUMPFREE tempered sliding shower screen for common bathroom---------------------------------$640.00 CEILING WORKS Supply and construct 450mm L-Box with cove light holder for living area--------------------------------------------------------------------------$550.00 Supply and construct false ceiling for dining area---------------------------------------------------------------------------------------------------------$520.00 Supply and box up aircon trunking at corridor walkway--------------------------------------------------------------------------------------------------KIV PAINTING WORKS Supply and paint whole house wall with Nippon Vinilex 5000 (4 colors +1 standard ceiling white)------------------------------------------$1,200.00 GENERAL WORKS Supply haulage and clear whole house debris------------------------------------------------------------------------------------------------------------$450.00 Supply and lay cardboard for floor protection--------------------------------------------------------------------------------------------------------------$300.00 Acid washing upon completion (2 times)--------------------------------------------------------------------------------------------------------------------$300.00 TOTAL : 33,085.50
  5. hello wai! able to pm me the contractor's details as well? thank you! =)
  6. hello! may i have the contacts for j & e too? thank you so much! =)
  7. hello arnold! may i have boon's contact (and quotation as well if it is convenient) please? thanks! =)
  8. hello! may i have the contacts for nick? and if it's convenient, the quotation that he provided you for reference as well? thanks in advance! =)
  9. hello! may i have the contacts for j & e too? thank you so much! =)
  10. Hi Freb, don't mind if you can send me a sample of the appeal for cement screeding? May I know which ID are you using and what's the total cost? Thanks !
×