Jump to content
Find Professionals    Deals    Get Quotations   Portfolios

tulips

Members
  • Content Count

    384
  • Joined

  • Last visited

Everything posted by tulips

  1. I will try to post pictures for the full ang ang kitchen this week coz I haven't tidy up the kitchen yet... the top is still cover with bubble wrap
  2. sorry for the late reply coz i missed out on ur posting.... my marble problem is mainly due to the scratches caused by the marble-polishing machine as well as efflorescence problem.... big big headache
  3. I think I need to look for replacement for the washer base le, coz u guys got a point here... dun tink the base will be strong enough for the washer.
  4. ya loh, cost cutting wor... and another thing is dun wan to restrict ourself on choices when we wan to change our washer next time.
  5. hmmm... I guess once in a while I will clean the kitchen by splashing water and give the tiles a good "scrub", that y I need to level-up the WM and fridge loh.
  6. there will be another round of polishing tomolo. haiz... this flooring really caused big headache for us and yeak as well. i think yeak don't dare to take on any more marble flooring work after this. i placed bricks under the WM bcoz I did not build a base for it so i need to use 4 brick as a substitute so that the metal legs wun get in touch with the water when i m washing the kitchen floor.
  7. wah... tat is nice... but will it be too big for a base.... hmm tink i can ask yeak where can I find this type of construction materials
  8. I guess i got start to look around for road work liao so tat i can gabo the brick hehehe
  9. I hope not... we have added cement into the bowl liao... nvm nvm i shall observe it closely...
  10. We can't find the old-type of stone support for our fridge and washer and we dun like those plastic one that are selling outside. When we are discussing with my parents on other alternatives, an idea strike my mom's mind.... And this is our half-DIYed washer and fridge base. My parents have filled up the bowl with cement so that it will be "solid" enough to take the weight of the washer and fridge
  11. TV console for MBR The 2 red side top are the leftover solid surface for my kitchen top, my dad feel tat it is quite wasteful to throw it away so he mod his work again to include the 2 side top. TV console for living room My completed 3m wardrobe With hidden sliding mirror
  12. serious ar? lucky I din see the red fridge and WM during my shopping for appliances or else my kitchen will be celebrating CNY everyday
  13. hehehe if there is red fridge, WM and hob, I think I would have fall for it le
  14. dun need to be sad lah... 各有各的美 ar... some how, i tink i abit overdo on the red for my kitchen liao.
  15. Nvm nvm, all white also mei mei ar!!!
  16. The toilet door is from Wellmax. From what I heard from Mark, this is his first time doing a all-red bi-hold door. I din have any catalog for reference at tat time, I just empathize to him that I want the bright shade of red. Price is $168 with installation for top track bi-hold door
  17. I not too sure leh coz i asked the electrican to fix it for us... but on the website they have a installation slide leh. may be u wan to check out the slides first before u buy.
  18. I bought the energy saver switch from Choo Chiang, can't remember the actual price but it is around $25. It works like a timer switch for the storage heater. Just need to turn the "knob" to 15 or 20 min and it will switch on the heater for the designated time. http://www.esaver.com.sg/Switch%20Timer.html
  19. I also like the red door alot. Match my red-white combi kitchen perfectly
  20. ok lah, i try to take more pictures tomolo... any way, my dad said the console is not completed yet he still got to install 2 T5 tube under the console.
  21. got different color ar... i will ask my dad to see tomolo... rite now the laminate is still protected by a protective film so probably got to push out the film and compare. height wise is 60 cm from the floor wor... low meh???
  22. Our mirror from ikea for both toilets Kitchen toilet
  23. Updates for carpentry MBR wardrobe>>>80% completed TV console for living room
  24. My ang ang kitchen toilet door Washer delivered Samsung fridge delivered Energy saver switch for storage heater
  25. i m only waiting for my sofa delivery loh... that one will only be ready in oct bah... bed frame will be delivered on end sept so i guess i still got time lah...
×