Everything posted by tulips

  1. i dunno wat happened leh... but she sounds sad...
  2. The HO will be done after the polishing and painting bah coz the carpentry will be done by my dad. Think by end jul or early aug yeak should be able to HO the place to me le.
  3. Nothing much to update for the past week coz only 60% of wiring was done, aircon installed, kitchen cabinet also 90% done coz solid surface is not installed yet. Today, they will be starting on the marble polishing and most probably painting will also start this week.
  4. newnyew, hope u r ok now. dun worry too much ok. every thing will be fine.
  5. hahaha that is very true!!! but too late liao lah... btw u confirmed ur carpentry work liao ma?
  6. u r right, i tink carpentry is another job that need detailed planning. luckily i got my dad to take care so 1 less headache for me. If i m not wrong, yeak's carpenter also no bad one so u juz relax ok! If need advice, u can post on ur thread i see whether can i help u anot
  7. wah... ur all meet him till so late ar i tink if it is me i tink i will during the discussion wor... normally i will juz drop him a sms, or get my parents to ask him when they see him at the unit. tat y yeak is right when he said that he see my parents more than seeing me at the site.
  8. my hb have spoken to yeak yesterday liao, yeak said that he will change the tiles for us i tink yeak now also should be having a big headache of this plumber le bah... he complained to my mom that he 晚上睡也睡不好... poor yeak...
  9. i tink sixer meant plumber lah coz i tink both of us kenna lousy workmanship frm the plumber. sixer>>> how is ur rectifying work for the tiles???
  10. ya, i hope ah hui will knock that plumber's head hard and muz knock for 2 times coz he drill 2 extra holes
  11. actually!!! i dunno wat is on his mind leh... he knew that we were unhappy abt the extra hole he drilled yet he can go and drill the 3rd hole. i tink he tot that as long as he can hide the extra hole under the bracket we will be ok... i very 心痛 loh... the wall was tiled nicely by ah hui one but now.....
  12. I have told my hb abt it, I let him go and speak to yeak first coz I m very affected now so dun tink it is the right time for me to tok to yeak abt all those problems caused by his plumber...
  13. That is not all coz the glass bowl basin is also slanted to 1 side and as my dad will be at my unit today doing capentry work, we asked him to inform the plumber abt it... Called my dad just now to see whether have he adjusted the basin and my dad told me that plumber bei song liao and gave him attitude and say he have done wat he can already.... WAH!!! wat the heck is tis man!!!!
  14. ARHHHHH!!!! I hate that plumber!!! Yesterday, I went to the unit to look at the water piping work.... To my horror, the plumber went to drill another extra for my shower head holder and he use the white cement to patch up the extra hole... we called yeak immediately to highlight to him on this and I think yeak went to ask him abt this and this morning that plumber came to my unit again and drill a third hole in the middle of the 2 existing holes to cover up WITHOUT ASKING ANYONE!!!! I am super angry right now loh!!! John and I chose this shower head holders bcoz it require only one screw hole but in the end we have 3 holes for 1 holder that only required 1 screw.... SUPER SUPER ANGRY!!!!
  15. stress... tink i got to relook at the wiring for my place.... coz i got a feeling i will be having alot of trunking leh... esp i wun be doing false celling.... ai ya... headache wor...
  16. yoz whoooo.... thank precious for organizing this meetup and ur great hospitality
  17. hehehe dun be too excited until u can't sleep tonite wor... i dun wan to see panda tomolo leh
  18. Ya, i tink yeak is aware now coz i called him immediately when i saw the pipes on that wall so he came out to my place and take a look. luckily, we still can have a sliding door or else i really big time
  19. precious>>> i might be a little late tomolo coz got to collect the cake from pandan loop first. I will try to reach by 1.30pm, u all muz wait for me huh!!!
  20. today got a few hiccups for the water piping work. first the plumber broke my common toilet basin, in the end we got to rush to jalan besar to buy a replacement for him to install. second the plumber went to install the water pipes in my master toilet on one of the wall tat is meant for the glass door to slide in in the end we got to settle for a smaller sliding glass coz our toilet is too small to accommodate a swing door... haiz wat a day...
  21. hmm... my hb and me are more of a tea person... so tink we got to give it a miss...
  22. Actually, you will be able to find similar stuffs in those shops juz that the pricing might be different... some items might be cheaper at PJ but some items might be more expensive than other shops so in order to maximize cost-saving we bought the stuff from 3 different shops loh
  23. no leh.... i bought the stuffs from 3 different shops.... PJ, Royal Franco and a hardware shop at yishunONE industrial park...
  24. The 360 degree turn-about shower head holder
×